Professional Documents
Culture Documents
10
Column H
0
SR. NO. 1
QUALITY MANGEMENT SYSTEM
PREVENTIVE MAINTENANCE SCHEDULE
14.clean the machine and control box clean the panel with blowering and clean the
machine with cotton waste
15.check bearings of motor apply grease at required points
17. Clean complete machine . Check Visually & clean by cotton waste.
MAINTENANCE SUPERVISIOR SIGN : PRODUCTION SUPERVISIOR/OPERATOR SIGN :
PREPARED BY: APPROVED BY :
DATE : DATE :