(3) Where the 18 in. (450 mm) clearance between sprinkler 8.15.11.2 Sprinklers
p shall not be required
q in electrical equip-
q
deflectors and tops of stacks cannot be maintained and ment rooms where all of the following conditions are met:
where vertical shelf dividers are incomplete and allow wa-
(1) The room is dedicated to electrical equipment
q p only.
ter distribution to adjacent aisles, sprinklers shall be per-
(2) Onlyy dry-type
y yp electrical equipment
q p is used.
mitted to be omitted in alternate aisles on each tier, and
(3) Equipment
q p is installed in a 2-hour fire-rated enclosure
where ventilation openings are also provided in tier
includingg protection
p for penetrations.
p
floors, sprinklers shall be staggered vertically in accor-
(4) No combustible storage is permitted to be stored in the
dance with Figure 8.15.10(b).
room.
8.15.12* Industrial Ovens and Furnaces.
8.15.13 Duct Protection. Duct protection shall be required to
meet the requirements of 8.15.12 where required by the au-
Third tier
Floor or
walkway — at the top of each vertical riser and at the midpoint of each
either solid
or with offset.
ventilation
openings 8.15.13.1.2 Sprinklers shall not be required in a vertical riser
located outside of a building, provided the riser does not ex-
pose combustible material or provided the interior of the
building and the horizontal distance between the hood outlet
First tier
Incomplete
vertical 8.15.13.4 Strainers. A listed line strainer shall be installed in
divider
the main water supply preceding sprinklers having nominal
K-factors smaller than K-2.8 (40).
8.15.14* Open-Grid Ceilings. Open-grid ceilings shall only be
installed beneath sprinklers where one of the following is met:
Second tier
Ventilation
openings
(1) Open-grid ceilings in which the openings are 1⁄4 in.
(6 mm) or larger in the least dimension, where the thick-
ness or depth of the material does not exceed the least
dimension of the opening, and where such openings con-
stitute 70 percent of the area of the ceiling material. The
spacing of the sprinklers over the open-grid ceiling shall
First tier
2016 Edition