Professional Documents
Culture Documents
Reporting Period:
Company Details
Project Name:
Company Address:
Country:
Town/Location:
Company authorized representative (e.g. Environmental Manager):
I certify that the data contained in this report completely and accurately represents operations during this reporting period.
Signature:
Title: Date:
Contact Details
Telephone:
Mobile:
E-mail:
Project Information
Project Name:
DTM Number:
Brief Project Description:
ESD_EM_02 Page 1
Solid Waste Projects
How many trucks of waste is
transported to the landfill perday?
Landfill
Are waste acceptance and screening Yes If no, please provide current operational procedure:
procedures in place? No
Is there any waste segregation at the If yes, please provide the current operational procedure:
landfill? Yes
No
Is the landfill securely fenced? If no, please provide the current operational procedure:
Yes
No
Does the landfill have adequate lining If no, please provide design details of the available lining system:
system as defined below: Yes
No
landfill for hazardous waste: K ≤1,0
× 10- 9 m/s; thickness ≥ 5 m,
landfill for non-hazardous waste: K
≥1,0 × 10- 9 m/s; thickness ≥1 m,
landfill for inert waste: K ≥1,0 × 10-
7 m/s; thickness ≥1 m,
m/s: meter/second.
Is the waste including the inclined part If no, please provide current operational procedure:
of the working face covered up on Yes
completion of operations each day? No
Is infrastructure such as permanent and If no, please provide current operational procedure:
temporary litter fences available for litter Yes
control? Is the litter on site being No
controlled in a proper and efficient
manner?
Are there any issues related to control If yes, please provide details:
of birds, insects and vermin? Yes
No
Are previously filled areas been If no, please provide the current operational procedure:
Yes
ESD_EM_02 Page 2
Solid Waste Projects
adequately capped and revegetated?
No
Are there any gully and rill erosion of If yes, please provide details:
the batters, exposing previously filled Yes
areas? Is there any erosion of the No
landfill cover material, producing
depressions across the surface of the
area?
Are surface water and ground water If yes, please provide details:
monitoring programs established with Yes
monitoring points/bores located at all No
site-discharge locations
upstream/upgradient and
downstream/downgradient?
Please provide the total number of tests Total number of tests:
carried out for surface water monitoring Total number complying:
and the total number of tests which Percent compliance:
were in compliance with the national
and EU standards.
Please provide the total number of tests Total number of tests:
carried out for ground water monitoring Total number complying:
and the total number of tests which Percent compliance:
were in compliance with the national
and EU standards.
Has there been any change in the If yes, please comment on potential causes:
groundwater and surface water quality Yes
compared to previous reporting period? No
Are adequate leachate collection If no, please provide the current operational procedure:
systems in place? Yes
No
Is leachate treated before discharge? If no, please provide the current operational procedure and any
Yes problems observed.
No
Is adequate dust suppression carried If no, please provide the current operational procedure:
out during disposal of waste at the tip Yes
face, loading of excavated materials on No
to trucks, and access road to
stockpiles?
Is the methane released at the landfill Please provide the quantity of methane production and its
site captured and flared off, or utilised to Yes management method:
ESD_EM_02 Page 3
Solid Waste Projects
generate power?
No
Is landfill gas monitoring carried out to If no, please provide the current operational procedure:
ensure that any landfill gas emissions Yes
can be detected and controlled to stop No
gases migrating from the facility?
Is the project materially compliant with If No, please provide details of any material non-compliances:
all applicable environmental and social Yes
laws and regulations? No
How many inspections did you receive Number: Please provide details of these visits:
from the local environmental authorities
during the reporting period?
How many inspections did you receive Number: Please provide details of these visits:
from the local health and safety
authorities during the reporting period?
How many inspections did you receive Number: Please provide details of these visits:
from the local labour authorities during
the reporting period?
Please describe any environmental initiatives undertaking by the company during the reporting period:
ESD_EM_02 Page 4
Solid Waste Projects
Please provide a copy of the ESAP amended to include the progress during the reporting period.
1
Please provide the results of any environmental monitoring carried out by the Company or its consultants. If you already have all the data
requested available in another format, then this can used instead.
ESD_EM_02 Page 5
Solid Waste Projects
BOD
COD
Suspended Solids
Phosphorus
Nitrates
Heavy metals
[Other]
Surface Water
Total waste water
generated
BOD
COD
Suspended Solids
Phosphorus
Nitrates
Heavy metals
[Other]
Air Emissions
CO2
CH4
[Other]
Other
Parameters
Noise
[Other]
6
In addition to any other relevant comments, please indicate whether the measurements reported apply to all or only some process operations at
the facility Please include any relevant fuel quality parameters (e.g. calorific value)
7
If you have not already done so, please provide a separate report detailing the circumstances of each fatality.
8
Incapacity to work for at least one full workday beyond the day on which the accident or illness occurred.
ESD_EM_02 Page 6
Solid Waste Projects
Total number of lost Number: Total man-hours worked this Number:
workdays9 resulting from reporting period:
incidents.
Incidence during this Number: Incidence during the previous Number:
reporting period: reporting period:
[Incidence = total lost workdays/total [Incidence = total lost workdays/total
hours worked] hours worked]
Please summarise any health and safety training that has been provided for company personnel during the report period:
Please summarise any emergency prevention and response training that has been provided for company personnel during the
report period:
Please summarise any emergency response exercises or drills that have been carried out during the report period:
Please summarise any health and safety measures introduced to the project during this reporting period:
Were there any collective If yes, please describe including number of workers involved, reasons,
redundancies during the reporting Yes consultation undertaken and how they were selected:
period? No
Are there any planned redundancies If yes, please describe redundancy plan , including number of workers
or additions to the workforce in the Yes involved and consultation process:
next year? No
9
Lost workdays are the number of workdays (consecutive or not) beyond the date of injury or onset of illness that the employee was away from
work or limited to restricted work activity because of an occupational injury or illness.
ESD_EM_02 Page 7
Solid Waste Projects
Have there been any other If yes, please describe:
significant labour issues or Yes
grievances raised during the No
reporting period (including court
cases or complaints from trade
unions or non-governmental
organizations)?
Have all the affected persons been Yes If no, specify how many compensation payments are still outstanding (in
fully compensated for their physical terms of number and percentage of recipients and payment amounts)
displacement and, if applicable, any No and state what the planned timing is for these payments to be achieved.
economic losses resulting from the
project?
Has the land acquisition had Yes If yes, quantify these impacts and specify what measures have been
additional, unforeseen impacts on undertaken to minimize and mitigate these impacts. If no, specify how
affected persons’ standard of living No potential impacts on livelihoods have been monitored.
or access to livelihoods that were
not previously covered in the RAP?
Have any vulnerable groups been Yes If yes, list the groups that were identified and describe any additional
identified? measures undertaken in order to mitigate impacts specific to these
No groups.
If applicable, have all transit Yes If no, specify how many payments are still outstanding (in terms of
allowances been paid? number and percentage of recipients and payment amounts) and state
No what the planned timing is for these payments to be achieved.
Has legal support been provided to Yes If yes, specify how many persons effectively made use of the legal
all the affected persons? No support.
Have all outstanding land and/or Yes If no, specify how many claims are still outstanding and state what the
resource claims been settled? expected timing is for settling them.
No
Not
applicable
ESD_EM_02 Page 8
Solid Waste Projects
Have there been any new land Yes If yes, please state how many and summarize their content.
acquisition-related complaints or
grievances? No
Has the company regularly reported Yes If yes, please state how many meetings were held and how many
back to the affected communities on participants attended.
progress made in implementing the No
RAP?
Please summarise any complaints raised by members of the public during the report period:
Please summarise meetings held with members of the public or public organisations during the report period:
Please provide details of any public awareness programmes carried out during the reporting period:
Please summarise any on-going social or community development initiatives undertaken by the company:
ESD_EM_02 Page 9