You are on page 1of 1

1 2 1 2

385 2330 385 315 85 1165 1165 85 315

85 300
385
B B
TIANG PANCANG 250x250
@ 12m

Plat Setempat

1165
T.O.C -0.80
D13-150

D13-150

2330
Sloof 250/400
T.O.C -0.05

1165
D13-150
D13-150
Poer 600x600
T.O.C -0.80 TIANG PANCANG 250x250
@ 12m

A A

300 85
385
3100
3100
DENAH PONDASI TOWER SUPPORT C1 (1 Unit)
SKALA 1 : 30 DENAH PANCANG TOWER SUPPORT C1 (1 Unit)
SKALA 1 : 30
1 2
160 225 2330 225 160

+0.600

Kolom 450/450 Sloof 250/400

600
Tul.12D16/Ø10-150 Tul.8D16+2D13/Ø8-150
Beton Rabat t=5cm
Readymix B-0 Ex. Kraton
±0.000
( Pondasi Silo )
Readymix K-225
(Ex. Kraton)
Urug Pasir
800

( t = 5cm )
Poer 600/600
Tul.D13-150
Tul.D13-150
-0.800
400

Tul.2D10

-1.200

LANTAI KERJA
URUG PASIR 5cm
Sitemix 1:3:5
TIANG PANCANG 250x250
@12 m
85 2330 85
300 2500 300
3100

POT. AS A & B TOWER SUPPORT C1 (1 Unit)


SKALA 1 : 30