Professional Documents
Culture Documents
l3 JBCR 26 - JBCR 27-01a Rev-1
l3 JBCR 26 - JBCR 27-01a Rev-1
KONSULTAN
P.4 P.5
DISETUJUI
RESIDENT
SUMIT SIMLAI
ENGINEER
DIPERIKSA
4800 ALIGNMENT
SAKAUE
ENGINEER
NOTE :
1. ELEVATION AND COORDINATES BASED ON DATA SURVEY
"ACAD-C3D-Master_Alignment-Line_3-3104_B-3205_A-28062019-Level_SC"
2. POINT OPERATING EQUIPMENT BASED ON SIEMENS DRAWING
"S-03-AB-SG-MD-0032-001A.dwg" AND VOSSLOH DRAWING "439900231-1 REV 3.dwg"
3. LandXML FILES "GJL-100-DES-N-3106-A." FOR TRACK 1 AND "GJL-100-DES-N-3206-A."
FOR TRACK 2 HAVE BEEN USED
PT.ADHI KARYA (Persero) Tbk.
4. POINT NO. TOE CHAINAGE /RAIL TRACK ID X Y JL. RAYA PASAR MINGGU KM.18 JAKARTA12510, INDONESIA
W30301 CH.8+768.273 /RIGHT TRACK 1 715540.387 9308008.968
DISETUJUI OLEH
W30302 CH.8+817.065 /LEFT TRACK 2 715593.120 9308015.605
NAMA JABATAN TANGGAL TANDA TANGAN
W30304 CH.8+884.106 /LEFT TRACK 2 715660.102 9308018.380
W30306 CH.8+941.237 /RIGHT TRACK 1 715713.204 9308016.124.
RINTO YUNIARTO PM
DIPERIKSA
DIGAMBAR
TRACKWORK
CRIM JV - CRIM JV
CONTRACTOR
PROJECT
REFERENSI DOKUMEN
JUDUL GAMBAR
AS SHOWN A3 01A
L3T2 06/09/2019