Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor in the state of Uttar Pradesh and

Uttarakhand on Hybrid Annuity Mode under Bharatmala


Pariyojana (From Ch. 0+000 to Ch. 50+700)

Statement of Initial/ Routine Load/ Integrity Load Tests at Bridges


Review/
Routine Load Test comments on
Submission of Report Submission of Report Submission of Report
No. of Piles test Report Compliance
Sl. Design Type of Initial Load for Initial Load Test for Routine Load Test for Integrity Test
at the Integrity Test from IE from Remarks
No. Chainage Structure Test
Structure Concessionaire
Vertical Lateral (Letter no. & Date) (Letter no. & Date) (Letter no. & Date)
(Letter no.
& Date)

1 14+266 VUP 1

2 27+660 VUP

3 32+095 Fly Over