Professional Documents
Culture Documents
00 30-Jun-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Re-instatement Checklist (Form) SATR-A-2011 24-Jul-18 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?
SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. SUPPORTING SAIC Number SAIC QR No.
Notes:
1) This Form shall be used in conjunction with an applicable Reinstatement Procedure for all Test Packages (SAEP-1160).
2) "B" items from Pre-Test Checklist are cleared after testing during re-instatement to close & certify Test Pkgs.
3) Any items not completed during the re-instatement
shall be added to Mechanical Completion Punchlists and submitted to Saudi Aramco (FEIL). ETC = Estimated Time of Completion (Affects
lay-up selections)
6
NOTES:
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?
SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. SUPPORTING SAIC Number SAIC QR No.
Quality Record Approved:
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.
DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?
Item
Description A or B Origi- ETC
Verified
Concur
# (Use with the applicable Pre-Test Punchlist Reference complete
Item nator (Note 4) (PID Inspector)
Checklist) by QC