Type of JSA: Soil/Sand Removing & concrete Foundation Demolition JSA No.: 1 New: Revise:
Job Description: The JSA covering all the hazard & preventive measures for manual/Equipment concrete foundation & soil/sand/demolished material removing
from work site (Trenches) to TRD approved area. Equipment’s involved in activity will be Hand tools, backhoe loader, Chain Excavator/Breaker, Tipper/Dump truck
and skid loader.
Prepared By Subcontractor:
Name: Syed Hassan Raza Position: HSE Manager Signature: Date:
Reviewed and Approved By Subcontractor:
Name: Kapil Dev Position: Project Manager Signature: Date:
Reviewed and Approved By TRD:
Name: Renato Sousa Position: TRD-HSE Superintendent Signature: Date:
Page 1 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
Fatality or
Permanent damage total
> 2 weeks Total facility loss 5 L M H H H
beyond project boundary permanent
disability
Permanent damage
Damage to an
within project Permanent
1 week to entire facility or loss
boundary or partial 4 L M H H H
2 weeks of multiple systems in
reportable release disability
a facility
beyond boundary
High Operation not permitted; must implement Operation permitted with a time Operation permitted with
Risk Mitigation Medium Low
controls to reduce risk to an acceptable or limited waiver endorsed by implementation of core HSE program
Controls (H) (M) (L)
manageable level. management. elements.
Page 2 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
Please mark (■) appropriate boxes - (A new JSA is required if the job scope or work conditions changes)
Confined Space Safe Work Permit
Permit(s)
1.0 Required: Hot Work Others
Hard Hat Clear Safety Glasses Dark Safety Glasses Chemical Goggles Cutting Goggles
Dust Mask Face Shield Welding Hood Welding Aprons Welding Leggings
Ear Plugs Earmuffs Cartridge Respirator Escape Respirator SCBA
Cotton Gloves Leather Gloves (rigging) Leather Gloves (welding) Rubber Gloves
2.0 PPE Required:
Coverall Disposable Coverall Full Body Harness Hi-vis Vest / jacket
Rubberized Cotton
Safety Shoes
Cut resistant gloves Nitrile gloves Elect Insulated gloves Arm Sleeves
Dielectric footwear
Air supplied respirator Fire resistant coverall Rain Suit
Potential
Noise Air Pollution (dust) Air Pollution (smoke) Air Pollution (vapor)
4.0 Environmental Soil erosion Spills (to ground) Spills (Water) Hazards to Flora & Fauna
Hazards
Hazardous Materials
5.0 (attach MSDS)
Carcinogen Irritant Highly Flammable Toxic Explosive
Other Potential Electrical Pressure (air, water, gas) Mechanical (crush points) Ergonomics Temperature (±)
6.0 Hazards Light / Dark Ignition Sources Dust / Vapor Suffocation Other Trades
Drink water and take rest breaks in hot weather conditions/Wear warm/suitable clothes in cold weather conditions.
Emergency: TRD HOT LINE: 97864422 and follow the emergency response plan: First aid facilities shall be available.
Covid-19: Respect the protocol wear facemask, maintain social distance, use of sanitizers and soap liquids, avoid touching eyes, mouth or nose before washing hands. Follow with MOH instructions, in case of covid-19 symptoms, report to
your supervisor immediately.
Additional HEAT STRESS: Drink water and take rest breaks, do not work in open area for too long.
7.0 Instructions CONFINED SPACES: if confined space entry is applicable, a separated PTW and JSA are required.
HOT WORK: if you use grinder machine, torch, cutting machine, etc. another JSA is required.
ENVIRONMENT: Respect the environment HSE plan in all aspects.
Page 3 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
Ensure strict compliance to TRD Procedure.
• Health safety and environment &
social system.
• Permit to Work.
• HSE training and competency
program.
Procedure Non- • Emergency Response Plan Site Y
1 Site Preparation M L
Compliance • HSE Induction Procedure Supervisor
• PPE Procedure
• Manual and mechanical handling,
Ensure approved JSA is attached with the
permit.
Ensure drawings of the specific job are
attached with the permit.
Page 4 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
• Deploy only HSE Inducted persons.
• Ensure all necessary training are Constructio
Deployment of
given to the persons as per job n Manager Y
non-competent H L
requirement. Site
personnel.
• Workers must be competent as per Supervisor
job requirements.
Page 5 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
• Ensure adequate welfare facilities
are established prior to work
starts. Following facilities must be
provided: rest shelter, portable
toilets, water drinking stations,
eye wash, prayers area, washing
area.
• All workers must have clear PCR
Constructio
Irregular / non- medical fitness test report. (Covid-
n Manager Y
provision of M 19) L
Site
welfare facilities; • Rest shelter shall have enough
Supervisor
space for all personnel in the area.
• Drinking water shall be renewed
first thing every morning before
commencing the activities, and
shall be kept cold by using ice and
insulating materials.
• Ensure regular cleaning and
Maintenance of welfare facilities.
Page 6 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
• TRD inspection of equipment must
be done.
• No use of mobile phone or blue
Mobilization of tooth devices while driving.
equipment/machinery • Maintain a safe distance from
Site Y
2 at site. (Backhoe Traffic incident H other traffic. L
Supervisor
loader, Tipper, skid • Daily inspection checklist shall be
loader) available and conducted by driver.
• Driver should follow the safe
driving procedure like adhere the
speed limit (20km/h),
Page 7 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
• Pre-task briefing shall be provided
prior start the work.
• Ensure proper communication with
other contractors/ employees of
Lack of the task prior to the job.
communication / • Interface meeting shall be
Simultaneous Site
miss conducted and priorities the task
3 Operations M L Supervisor Y
communication • Cordon off the work area & sign
(SIMOPS)
(Poor boards placed.
Supervision) • Ensure proper training for the
employees involved in the task.
• Ensure competent personnel are
deployed and proper supervision
shall be done.
Page 8 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
• Ensure Equipment Maintenance
Environmental
shall be done at designated place.
pollution due to
• Ensure dip trays are used while
oil/fuel leakage Site Y
H refueling. L
from Supervisor
• Ensure no leakage from
equipment/vehic
equipment/vehicle.
le
• Do not overfill fuel.
Page 9 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
Demolition of
Ensure the appropriate PPE use ear
concrete foundation
plugs to protect ears from noise &
with machinery Site y
6 Noise & Vibration H vibration. L
(Excavator/breaker, Supervisor
Ensure that the hearing protectors
backhoe loader, skid
are properly used and maintained.
loader)
Page 10 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
Competent flagman presence with
well-maintained distance from
machinery.
Projection of Barricade working area. Site Y
H L
particles. Full supervision during activity on Supervisor
site.
Keep a safe distance in workers and
machine.
Page 11 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
• All personnel at Site shall wear high
visibility vest or coverall with
Loading & Unloading reflective sticker at all times when
of working at Site.
Soil/sand/demolished Man-machine/ • Deploy competent Flagman. Ensure
Site Y
7 material with equipment/ H trained flagman shall assign with L
Supervisor
machinery ( Backhoe vehicle interface. equipment/vehicle while entering
loader, Skid loader, in construction zone and while
Tipper/Dump truck) reversing.
• Pedestrians area must be separated
from equipment’s working area.
Page 12 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
• Driver must have valid Oman
driving license.
• Driver should follow the safe driving
Site Y
Over Speeding H procedure like adhere the speed L
Supervisor
limit (20km/h), wearing seat belt
and avoid using mobile phone while
driving.
Page 13 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
Page 14 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
Monitor humidity and temperature;
display the flags according to the level
• Extremely heat – Drinking water will be provided in the site Site Y
H L
heat stress always Supervisor
All workers will be advised to take short
break if feel fatigue
Page 15 / 16
Duqm Refinery Project EPC Package One
JSA for Soil/Sand Removal and Foundation Demolition Rev.00
RISK Acceptable
S RESIDUAL
JOB STEPS POTENTIAL HAZARDS RATI PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RISK
NG
All nails in wood and timber shall be
removed.
All unused wood and timber must be
properly storage and de-nailed in a
properly separated and barricaded area,
with adequate signs for identification. Site Y
• Punctures M L
All workers shall wear the minimum Supervisor
personal protective equipment required
for the project for the specific activity
being carried out.
Adequate number of trash bins shall be
provided