You are on page 1of 8

SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.

00 30-Jun-16
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT

Pressure Test Report (Valve Inspection & Field Testing) SATR-A-2001-V 15-Nov-17
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
TCF PROJECTS AZMEEL Constracting & Construction Company
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

UNIQUE VALVE ID # : Final Location (On installation):


Valve Description (Manufacturer / Type Valve / Size / Class / Ends / Body / Bonnet / Packing / Trim / Other Details:

Trim Details: Body Seat Surface Material: Closure Member Surface Material:
Valve Seat Type: Resilient Seated / Metal Seated Seat Leakage Permitted (API 598 Table-5):
Service Fluid (Water Quality Cert #): Test Results:
Receiving Inspection Results: Accepted: Rejected* :

*Rejection Details:
Repair Disposition :
Repair Witness: Repair Date:
Repair Accepted (Attached Report /EDR ):
Preservation after Testing: State type
Preservation Check Date/Notes):
Pressure Gages/Recorder Temp Gage/Recorder Relief Valve
Test Instruments
PG- PG- PG- PG- PR- TG- TR- RV #
Serial No/Tag No.
Make
Range
Certificate No.
Date Calibrated
Set Pressure
Re-Cal Due Date
ITEM Description of Test Parameters Actual Pass Fail Remarks
No. (Complete Applicable Data Entry Prior to Test)
Test Medium Type/Quality (Indicate method of treatment if req'd in
A Remarks, i.e., Fluid type, ph, SRB count, O2 Scavenger, etc).

B SystemTemperature at test:
Valve Body: ______________
C Test Pressure: Test Duration:______________

Valve Seat (A): ____________


D Test Pressure: Test Duration:______________

Valve Seat (B): ____________


E Test Pressure: Test Duration:______________

Other ( ): ____________
F Test Pressure: Test Duration:______________

G Seat Leakage Observed : @ API 598 (Drops or Bubbles/Min)

H Method of leak detection (visual direct, artificial)

TEST RESULTS: Valve Test Accepted. State reasons in


Rejected Remarks Section.
AFFIX ANY TEST TAPE TO THIS REPORT (TEST EVIDENCE)

REMARKS:
Contractor / Third-Party Saudi Aramco
Construction Representative PMT Representative
Test is ready for inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department, Name, Initials and
Company, Initials and Date: Date:

QC Inspector PID Representative

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT

Pressure Test Report (Valve Inspection & Field Testing) SATR-A-2001-V 15-Nov-17
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
TCF PROJECTS AZMEEL Constracting & Construction Company
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No. TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

UNIQUE VALVE ID # : Final Location (On installation):


Witnessed Test Work / Rework May Proceed Name, Initials and T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:
Date:

QC Supervisor Proponent and Others (Optional)


Quality Record Approved: Name, T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date: Organization,
Initials and Date:

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016)

Saudi Aramco: Company General Use


Rev. 2016.06.00

###

Saudi Aramco: Company General Use


30-Jun-16

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016)

Saudi Aramco: Company General Use


Rev. 2016.06.00

###

Saudi Aramco: Company General Use


30-Jun-16

Saudi Aramco: Company General Use

You might also like