You are on page 1of 1

Mat Thickness = 12"

Mat Thickness = 12" LEGEND FOR TOP REBAR 1 2 3


LEGEND FOR BOTTOM REBAR
TOP BAR 20'-0" 10'-0" 20'-0''
BOTTOM BAR
1 d 12 @ 6" c/c.
A d 12 @ 6" c/c. 2 d 12 @ 7" c/c.
Slab Thickness = 7 ''
B d 12 @ 7" c/c.
3 1- d 10 Extra top in each gap
A
LEGEND FOR UGWR TOP SLAB
2 MH 8'-9"

4'-0"
CLEAR COVER 4 1- d 12 Extra top in each gap MH

5'-0"
5'-0" BOTTOM BAR TOP BAR

8'-4"
8'-4"

1"
20'-22
A d 10 @ 6" c/c alt. ckd. 1 1- d 10 Extra each gap

1
BOTTOM COVER = 2" SIDE COVER = 2½" CLEAR COVER LIFT PIT
B d 10 @ 7" c/c alt. ckd. 2 1- d 12 Extra each gap
TOP COVER = 2½" A 4'-0"
1
BOTTOM COVER = 2" SIDE COVER = 2½"
A' Use d 10 @ 10" c/c
2 binder where necessary
TOP COVER = 2½"
5'-0" 5'-0" 3'-0" 3'-0"
1 2 3

2'-0"
1 2 3 A

3'-0"
CLEAR COVER

1
20'-0" 10'-0" 20'-0'' BOTTOM COVER = 1½'' TOP COVER = 1''

1"
11'-102
20'-0" 10'-0" 20'-0'' 4'-0" 4'-0" 2'-0" 2'-0"
B

2
5'-0"

4'-0"
MH

3'-6"

2'-6"
A
A B 2 - d 12 (top & bottom)
8'-9"

UWRB (15'' X 15'' )


8'-9"

4'-6"

3'-6"

3'-6"
5'' Brick wall MH
5'-0"

4'-6"
5'' Brick wall
8'-4"
8'-4"

1"
20'-22

8'-4"
8'-4"

1"

2
20'-22
LIFT PIT 24" DIA
3
LIFT PIT 2 1
5'-0" 5'-0" 3'-0" 3'-0"
Nontoxic Water Proofing membrane B
A'

17'-21"
Nontoxic Water Proofing membrane

2
( Conforming item no - 7.17 PWD SOR )
( Conforming item no - 7.17 PWD SOR ) A'
DETAILS OF MAN HOLE (MH)
4'-0" 4'-0" 2'-0" 2'-0"
5'' Brick wall 3
5'' Brick wall
7'-3" 3
7'-3"

1
2
1"

4'-6"
11'-102

4'-6"
1"
11'-102

3'-6"
3'-6"
MH MH
C
5'-0"

B REINFORCEMENT PLAN OF UNDER GROUND WATER RESERVIOR TOP SLAB


B

N
4'-3"
4 C B A' A
2'-0'' X 2'-0'' punch 4'-0" 5'-6" 3'-6" 3'-6"
in wall bottom
1"

2'-0'' X 2'-0'' punch


17'-22

1"
2 - d 20 st. + 2 - d 20 st. 2 - d 20 st. + 2 - d 20 st. + 2 - d 16 st. +
in wall bottom

17'-22
1 - d 20 ext.
A
1 - d 16 ext. 1 - d 20 ext.
5 1 - d 20 ext.
1 3''

4''
d 10 @ c/c

12''
@ 1" clear gap typ

15''
3 2 - d 16 st. + 5

4'-3"
1 - d 20 st. 2 - d 16 st. +

2½''
15'' 1 - d 20 st.
C d 10 @ 3" c/c d 10 @ 6" c/c d 10 @ 3" c/c d 10 @ 3" c/c d 10 @ 6" c/c d 10 @ 3" c/c d 10 @ 3" c/c
SEC. ON 5-5
C 3'-0" 3'-0" 3'-0" 3'-0"
15'-9'' 10'-0" 1'-8" 7'-1" 1'-3"
LONG SEC. OF UNDER GROUND WATER RESERVIOR BEAM UWRB-(15" X 15")
REINFORCEMENT PLAN OF UNDER GROUND WATER RESERVIOR BOTTOM SLAB
N

REINFORCEMENT PLAN OF UNDER GROUND WATER RESERVIOR BOTTOM SLAB

N
( MAT BOTTOM REBAR ) ( MAT TOP REBAR )
10" 10"
Plinth level PL
7''

8'-9"
PLINTH LEVEL

As Per Architectural
Read From Plan Read From Plan Lift pit Wall
2" Clear cover
1" Clear cover

Drawing
As Per Measurement
from E/M division
5" d 10 @ 6" c/c d 10 @ 6" c/c
10"
9"

UWRB 10"

( Min 5'-6'' )
2" Clear cover 2" Clear cover

3'-0"
10"
2" Clear cover d 10 @ 5" c/c. Nontoxic Water Proofing membrane
Nontoxic Water Proofing Top of Water Level Nontoxic Water Proofing Nontoxic Water Proofing ( Conforming item no - 7.17 PWD SOR )
coat with 12mm Plaster. coat with 12mm Plaster.
EGL(0'-0") EGL(0'-0") d 12 @ 8" c/c. coat with 12mm plaster.
d 12 @ 8" c/c d 10 @ 5" c/c
d 12 @ 8" c/c
Nontoxic Water Proofing d 10 @ 5" c/c EGL(± 0'-0")
d 10 @ 5" c/c d 10 @ 5" c/c 5" Brick Wall coat with 12mm plaster.
d 10 @ 5" c/c d 10 @ 6" c/c 2" Clear cover
10'' d 12 @ 8" c/c.
Water Reservoir Wall
10''
d 10 @ 5" c/c d 10 @ 5" c/c 2" Clear cover 2" Clear cover
d 10 @ 6" c/c
5'' Brick wall
5'-0''

5'-0''
d 10 @ 5" c/c. 1 of 4 - d-12 d 10 @ 6" c/c 10''
10''
(18" Extension from opening)
d 10 @ 5" c/c d 10 @ 5" c/c
d 12 @ 4" c/c d 12 @ 4" c/c d 10 tie @ 4" c/c. PROJECT : CONSTRUCTION OF SERVICE BUILDING AT 250 BED HOSPITAL,PIROJPUR.
Read From Mat top Bar.
3'-0''

3'-0''
Read From Mat top Bar.
2" Clear cover Read From mat bar BUILDING NAME: DRG. TITLE:
2" Clear cover
SERVICE BUILDING AT PIROJPUR. UNDER GROUND WATER RESERVIOR &
9" 3'' 6(SIX STORIED FOUNDATION) LIFT PIT REINFORCEMENT DETAIL.
9" 2" Clear cover
3" Read from Mat bottom Bar. PILE CAP PILE CAP CAD BY: ARCH. DRG NO.: STRUCT. DRG NO.DD-3: SHEET NO.:
2" Clear cover MD. KAMRUL HASAN
PILE CAP Read from Mat bottom Bar. PILE CAP PILE CAP DRAFTSMAN
3" C.C. Chips (1:3:6) Read From mat bar 3" C.C. With Brick Chips (1:3:6) P.W.D. DESIGN DIVISION -3 S - 05
3" C.C. Chips (1:3:6) DATE: DATE:
SECTION ON N-N
4"

3" C.C. Chips (1:3:6)


SECTION ON M-M
SECTION ON Y-Y (Lift Pit) MIRZA SHIBLI MAHMOOD. LINTU GAZI. MD. RAFIQUL ISLAM
SUB-DIVISIONAL ENGINEER. EXECUTIVE ENGINEER SUPERINTENDING ENGINEER
P.W.D. DESIGN DIVISION - 3. P.W.D. DESIGN DIVISION - 3 P.W.D. DESIGN CIRCLE - 1
DHAKA. DHAKA DHAKA

You might also like