SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 2 of 13
Revision Summary
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 3 of 13
TABLE OF CONTENTS
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 4 of 13
The purpose of this document is to design an initiative “Pelawan Beach Improvement” as a part of the Social
Initiatives for Local Communities in The West Pangke Village. This document represents the guidance for the
Sustainability in COMPANY to carry out the project.
2. REFERENCE DOCUMENTS
Social Initiatives All actions, projects, plans and contributions implemented in areas
where Saipem operates, with aim of creating and maintaining a good
relationship with local, regional and national stakeholders and
generating a positive socio-economic impact on the host community.
Stakeholders Specific people or group who have a stake in the outcome of the
company project. Stakeholders can be from within the company and
could include internal clients, management, etc. A project may also
have external stakeholders, including suppliers, clients, and local
authorities.
SUBCONTRACTOR Organization / Entities employed by the COMPANY (or any other Saipem
entities, if this is the case) to perform works or to provide services or goods
incorporated to the works under a formal Subcontract, in connection with
the needs of the COMPANY for the requirements in part or whole.
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 5 of 13
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 6 of 13
The provision of all temporary facilities, protection, equipment consumables, labor and documentation
necessary to complete the work in accordance with the requirements detailed in this Scope of Work and
associated documents;
SUBCONTRACTOR’S SOW referred herein are all inclusive for Pelawan Beach Improvement in all
respects. Such works shall include all the required activities, such as but not limited to all demolitions (if any),
reinstatements, land clearing, earthworks, reinforced and non-reinforced concrete works, plastering, painting,
ceramic tiling works for flooring and wall, roofing, etc.
SUBCONTRACTOR shall be responsible for supply of all materials required for completion of these
works. The SOW shall also include for all material, labor, equipment, supervision, management, overheads,
profits, all taxes, duties, insurances, etc. complete for carrying out the works in the complete satisfaction of
COMPANY. SUBCONTRACTOR’S prices shall be fixed and firm for completing the activities required by the
Scope of Works and the Contract documents.
SUB-CONTRACTOR shall be aware that the works are to be carried out in a live complex (public
place) and utmost care to be taken to ensure the safety and security of the children and people in the vicinity.
SUBCONTRACTOR shall not damage any existing facilities and/or structures adjacent to its works location
and any other properties of the complex. In case of an unfortunate incident of damaging any facilities and/or
structures and/or properties, SUBCONTRACTOR shall reinstate and/or replace such damaged item and/or
property and/or facility and/or structure to its original condition at SUBCONTRACTOR’S cost and care.
SUBCONTRACTOR shall not be entitled for any compensation against reinstatement of such damaged
properties. Should SUBCONTRACTOR fail to reinstate such damaged facilities and/or structure, SIKB
reserves its right to engage a suitable third party for rectifying the damages caused by the SUBCONTRACTOR
and all costs associated therewith will be deducted from any payments due to SUBCONTRACTOR.
SUBCONTRACTOR will not be entitled for any variations, unless a variation is issued by COMPANY
in writing. Any additional SUBCONTRACTOR shall be responsible to complete all the associated works in the
stipulated timeframe. In case of any failure from SUBCONTRACTOR in completing and handing over the
works in stipulated time frame, COMPANY reserves it rights to find another suitable third party to complete the
works and all associated costs will be back-charged to SUBCONTRACTOR and deducted from the payments
due to SUBCONTRACTOR. No claims in whatsoever reasons in this regard will be accepted by COMPANY.
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 7 of 13
4.5. WARRANTY
Materials: SUBCONTRACTOR shall provide 18 months warranty for the material to be delivered.
In addition, SUBCONTRACTOR shall provide a 1-year warranty for construction and installation works starting
from the handing over of the works.
4.6. ATTACHMENT
4.6.1. Attachment 1: Map of Pelawan Beach in the West Pangke Village
4.6.2. Attachment 2: Detailed Description of Work
4.6.3. Attachment 3: Technical Specification of Signs
4.6.4. Attachment 4: List of HSE Requirements
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 8 of 13
Instagramable
Monument
Parking Area
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 9 of 13
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 10 of 13
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 11 of 13
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 12 of 13
Installation of Signs
1. The bottom of the excavation of pavement were a mixture of cement and sand mortar premises thickness
of 10 cm.
2. The size of the foundation of each pole, respectively:
a. Upper side: 25 cm
b. Bottom side: 40 cm
c. Depth: 60 cm
Established by the board to frames
3. Concrete foundation is made from a mixture of cement sand, gravel / split in the ratio 1:2:3
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.
PT. SAIPEM INDONESIA Doc. No. SW-PTSI-SUS-008-E
SCOPE OF WORK
Rev.0 Date 10/10/2019
Pelawan Beach Improvement
Social Initiatives for Local Communities
Page. 13 of 13
Attachment 04.
This document is the property of PT Saipem Indonesia (Karimun Branch) who will safeguard its rights according to the civil and penal
provisions of the law. All printed copies are considered uncontrolled copy.