MEMORANDUM
The GAA FY 2016 provides funds under the DILG Budget for the monitoring of the following
p rolec ts:
1. Core Local Roads
2. Potable Water Supply
3. DRRM Related Subprojects (Evacuation Center, Flood Control, DRRM Rescue
Equipment).
Once the release of funds have been verified by the OPDS, ROs through POs and C./ ML@Os shall
request copies of pertinent documents from LGUs and monitor activities with regard to pre-
procurement, procurement and project implementation. Any deviation observed should be referred
to the Regional Poverty Reduction Action Team (RPRAT).
C,/MLGOOs, PO and RO may provide technical assistance to LGUs if there is a special request or if
assessed by the RPRAT that the LGU needs assistance.
For clarifications, issues and other related concerns, you may contact Engr. Sharwyn Sangel at
(072) 607 1s31.
(J.
,-* REI.;'RD6
G 'llE
P.
D,
NIEMC}RANDUM
A. The cAA FY 2016 provides funds under the DILG Budget for tbe monitoring of the
following BuB-LCSF projecLs:
E. In order to have a commou understandiug oo the scope of rnonitodng by the DILG, the
follor.,in8 shrrll be observed:
1 Monitoring shall commenc€ upou release by the Bureau ofTreasury (BTr) of the fuuds
to the LGIIs
2. OPDS shall tlosely coordinate with DBM to veri$'the status of the release of funds;
upou verification, immediateb' uotify the concerned Regional Offiees (RO); ROs shall
consequently confirm with the LGUs rvhether funds bave been received.
g. Once release of firnds are verified, ROs through the POs and C/MLGOOs shall request
(:opies of the following documeuts from LGUs for nrooitoring purposes:
r Por Infrastructure projects (Water Supply, Core local Roads, Flood Conuol and
E\.acuation Centers)
Pmgram of Works (POW) duly signed by the Municipal Engineer (ME) and
rpproved b1'the tocal Chief Exeortire (LCE)
Water projects - Certification from ttre ME that the \^Eter source is viable to
sewe tle inteodetl beneffciaries and prrrof of conduet of w{ter potability test
Er.acuatiou Centers - Certification from tle Zoning Ofiicer tbat the location is
in safe area
Frl;i I lrt. I l.:r,
f :'r--11E 1r-:1:1zPt'l F,:
o
For DRRM-related equipment ard rehicles
a Pre-procurement
. Readiness of docurnents for procur€ment - technical designs/POW/DED for
infrastructur€ projects and technical specification for DRRM-related
equipment and vehicles and o&er bidding docrrments i
J
b, Procurement timelines (from lnvitation to Bid posting to issuance of Notice to I
Proceed) 1
c. J
Projeet implementation (Construction phase for the infrastructure projects and
delivery phase for DRRM-related equipment and vehides)
7. Repotting
'bo * a
a. Monthly Reports
. from LGU to CD/ C/MLGOO
. from Ctr/ C/MLGOO to PO
. from Po to RO
. from RO to RPRAT
o from Ro to DILG-CO
b. Ivlonthly Reportiog to Dilf-CO - ftom PDMUs to OPDS
b. Ifbased on ttre asse$sment ofthe RPRAT, the LGU needs assistance (slow moYing
projects)
C. The Department of Budget and Ma.uagement Central Office (DBIII-CO) has already
released the NC.A for LGUs with projects under the Fyao16 Bottorn-Up Budgeting - Lncal
Government Support Fund (BuB-l6SF), who complied with the tbllorring criteria:
FHit I'10.
1 riar. .Dl'i lr:l: LlFl'] Fl
7
{/
LGUs rYith NCA released may start t}le procurement process in order tcr complete the
bidding and award the contract before the election ban period on c5 March zot6. Copy of
/, the list will be sent to you via email. For tGUs with no NCA. succeeding releases wili be
based ou their compliance to the abol,e-meotioned criteria,
D. ROs and Field Offices to commence monitoring of projects u'ith released NCA.
AUSTEREA, PAIIADERO
Undersecretary fr)r Local Covernmeot