Professional Documents
Culture Documents
CUSTOMER:
MFG. BY:
Page | 1
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
TABLE OF CONTENTS
Page | 2
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
System Description:
The -80ºC Low Temperature Bath is having double wall construction .Inner wall is stainless steel 304
and outer wall is made of ms powder coated
It consists of control panel mounted in the front side of the -80ºC Low Temperature Bath
Motors mounted on the top for uniform heat distribution
Heaters &cooling coils mounted in the working area.
Motorized fan is designed to circulate the hot &cold liquid to offer even temperature of desired set
parameter & offers specified accuracy
The liquid is circulated in order to mix cold &heated liquid and is passed in working chamber under
control of electronic circuitry to maintain the presetted test parameter quite accurately.
The puff insulation is provided between the two walls to minimize the heat loss.
The insulation is done with modern insulation technology which offers better efficiency.
The top & front door with silicon gasket for sealing the chamber to prevent the interruption of the
performance condition of the chamber.
Cooling is achieved by means of hermetically sealed Emerson make compressor of suitable capacity
to offer temperature up to - 800c.
The cooling assembly is located at bottom with safety overload protector
A separate motor is provided for condenser cooling for cfc free refrigerant(R404A) for 1 ststage
&(R508B) for 2nd stage
The complete assembly is fitted on the base for ease of servicing and replacement
Page | 3
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
MATERIALS OF CONSTRUCTION:
Item description Location Material of
construction
Chamber (inner surface) Chamber inner SS 304
skin
Chamber(outer surface) Chamber Outer MS Powder
skin Coated
Gasket for door inner Door Silicon
Page | 4
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
Functional Specifications
The chamber has been designed for the following functional requirement
Page | 5
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
Page | 6
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
Operating Procedure
6. Load the calibration sensor inside the chamber; and ensure proper spacing from both side wall and
back wall for proper circulation.
7. Observe that the set TEMPERATURE is proper and Temperature indicators display the Temperature
and ensure that it is stable.
8. Ensure above step is carried out very precisely before starting of any test cycle.
9. IMPORTANT:
a) Do not overload the UNIT WITH UUC more than the Chiller chamber volume
b) Avoid the placement of UUC so close to each other so as to allow the proper circulation for
maintaining even condition throughout the Chiller.
Page | 7
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
Page | 8
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
Page | 9
AN ISO 9001:2008 Co.
INDEECON
EQUIPMENTS & INSTRUMENTS CO
Page | 10
AN ISO 9001:2008 Co.