Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation-MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
REVISION RECORD
Revision Section Page Description of Changes
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 3 of 11
Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation-MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
Table of Contents
1 INTRODUCTION ......................................................................................................................................5
2 REFERENCE DOCUMENT .........................................................................................................................5
3 PURPOSE ................................................................................................................................................5
4 GUIDELINES ............................................................................................................................................5
5 CONCLUSION ..........................................................................................................................................5
APPENDIX-1 (RETROFIT WEIGHT ADDITION) ..................................................................................................6
APPENDIX-2 (EXISTING VESSEL LOADING CONDITIONS)............................................................................... 10
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 4 of 11
Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation-MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
1 INTRODUCTION
This project is intended to carry out BWTS Installation on Vessel MV ZEINAB (IMO NO: 9070424).
2 REFERENCE DOCUMENT
3 PURPOSE
To verify the Stability of existing vessel after installing New Ballast Water Treatment. Weight estimation
calculation is carried out based on information provided by BWTS system vendor.
4 GUIDELINES
1. Weight calculation of new installed Ballast Water Treatment System is carried out.
2. Increased weight comprises of Piping, Structural, Equipment and Valves weight.
3. The Moment calculation is done with reference to the Frame “0” of the vessel.
5 CONCLUSION
Based on calculated results, it is found that changes in lightship weight condition and lightship LCG and
VCG due to installation of new BWTS system is within the permissible limit specified under IMO
requirements and vessel need not to undergo inclining test for lightship estimation.
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 5 of 11
Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation- MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 6 of 11
Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation- MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 7 of 11
Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation- MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
NEW NEW
INCREAS AND AND
ED AND EXISTIN EXISTIN
DIFFERENCE BETWEEN EXISTING EXISTING G G
LIGHTSHIP PARTICULARS AND NEW LIGHTSHI LIGHTSH LIGHTSH
LIGHTSHIP PARTICULARS P IP LCG IP VCG
WEIGHT
6.671 -0.057 - -0.004
% %
%INCRE
VARIATI VARIATI
ASE IN
% VARIATION IN LIGHTSHIP ON IN ON IN
WEIGHT
PARTICULARS LCG VCG
0.116 -0.035 - -0.040
PERMISIBLE VARIATION IN
LIGHTSHIP PARTICULARS AS PER 1% 0.5 % - 0.5 %
RESOLUTION MSC.429 (98)
CONCLUSION
WITHIN PERMISSIBLE LIMIT : YES YES YES - YES
OUTSIDE PERMISSIBLE LIMIT : NO
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 8 of 11
Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation- MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 9 of 11
Document name: Report on Lightship Weight Calculation
Project Name: BWTS Installation- MV ZEINAB
Document number: CM22-IV-217-1203 Rev: 0 Date: 10-08-2022
The information contained in this document is the proprietary to Cybermarine Technologies Pte. Ltd, Singapore. It must not be reproduced, stored, disclosed to any third party or used for any purpose not
authorized by Cybermarine Technologies Pte. Ltd. Printed documents are uncontrolled and considered as "for information only".
Page 10 of 11
Scanned with CamScanner