Supply 1 40%
Fabric Material, fabrication JPY 3,179,000 → SGD 43,393 40% 72,322
Fixing (rubber, aluminium JPY 1,275,000 → SGD 17,404 40% 29,006
Cables JPY 0 → SGD 0 20% 0
VAT 7% 124,215
Import Tax 15% 266,175
端数処理 -890
Sub-total ㎡ rate (Plan area) 8,040円/m2 2,814,000
Fixing
Perimeter (Straight) m 0
Perimeter (Curve) m 0
Perimeter rubber m 0
Intermediate section m 0
Perimeter fixing Lacing/ Flat Bar 850 m 1,500 1,275,000
運搬諸経費 式
端数処理
Sub-total ㎡ rate (Plan area) 3,643円/m2 1,275,000
Cable
①Cable
0
Membrane installation (LOCAL) 650 m2 1,000 650,000
Steel installation (LOCAL) 650 m2 1,000 650,000
Sub-total ㎡ rate (Plan area) 3,714円/m2 1,300,000
- 3/5 -
Asia Herb Association Cost Detail 8/31/2017
0
0
0
- 4/5 -
担当者 国名 仕入先 通貨 輸送 製品