You are on page 1of 1

YANBU STRATEGIC TANKS

Subject DATA SHEETS Number


SCS – Terminal Stations 3003

Doc. - No.: Q A 1 0 - G - 3 0 3 2 Rev. 0

No. Description Unit Required Guaranteed Notes


1 Station
1.1 Location of installation
1.2 Reference Specifications G02, S04
2 Overview
2.1 Operator Working Places No. G02, Drawing
2.2 Page Printers No. G02, Drawing
2.3 Switches No. G02, Drawing
2.4 Routers No. G02, Drawing3
2.5 Annually Availability (overall) % 99.9
3 Working Place
3.1 Manufacturer
3.2 Type
3.3 Size inch 24
3.4 Brightness cd/m ≥ 250
3.5 Contrast ≥ 1:1000
4 STATCON
4.1 Manufacture
4.2 Type
4.3 Software / Revision
4.4 LCP Size / Manufacture ≥ 17’’/ -
5 UNCON
5.1 Manufacture
5.2 Type
5.3 Software / Revision
2.4 LCP Size / Manufacture ≥ 15’’/ -
6 Bus Systems
6.1 Station Bus Type S04
6.2 Station Bus Protocol S04
6.3 Serial Bus Type
6.4 Other Protocol
                 
3
Depends on the type of communication system

Page 1of 1

You might also like