DECEMBER 01, 2022

GROUP 7

REGULAR DESIGN SERVICES

Housing Project

how much will be the total pro fee of ar offering daeds for 8m dubplex
house if the same unit will be constructed for its 14th

project def phase - 5 %


schematic - papasok si arkitek 15% = 20%
design devp 20% - 40%
contract dp 50% = 90%
bidding nego p 90%
sp 10%
5% for civic liability and spv

for schematic - 20%


for submission of contract docu - 51m x 90% -

office building - group 2


51m- 50m - 6% x 3m
excess 1m x 5% = 50000

3m plus 50000 x 90% = 2745000

determine the bldg


determine the group

sch building
250m

250m - 200m - 95000000


50m excess x 3% = 15000000
= 11000000

3rd structure - (check the group muna then identify)


group 6
40%

11m x 40% = 4.4m

1st = 11m
2nd = 5.5m
3rd = 4.4
= 20.9m
note: GROUP 7 PARA SA GROUP 4 FOR REPETITIVE CONSTRUCTION

Group 9 - for additional

ex. residential project

additional const - 600k


compensation increase to 50%

residential under group 4


service: dads6%

600k x6% = 36k

36k - prof fee for additional eme


since expansion - kailangan ng mas malupet

36k plus 50%


= 18k

total:

36k plus 8k = 54k professional fee

36k x 1.5 (150%) - 54k

600000 x 9% = 54k

GROUP 10

1000perhr is subject to increase

METHOD OF COMPENSATION
Unit cost of method -

r= 30k - 35k

35k x10% - daeds = 3500sqm

1150 sqm = 525k

30k sqm x6% - 1.8k per sqm

1.8k per sqm x 10k sqm+ 18m pesos


for non GFA = 50% kunin ang gfa = 900pesos per sqm
900 pesos per spm x 2k sqm = 1.8m

total fee = 18m + 1.8m


= 19.8 M

VALUE BASED PRICING


- applicable for post construction services
- di pedeng gamitin sa pre design and design
kase wala pang gross rental

PER DIEM, HONORARIUM

SALARY X MULTIPLIER PLUS REIMBURSEMENTS

MIXED METHOD OF COMPENSATION

RETAINER - CLIENT MERONG PINAGHAHAWAKAN KAY ARKITEK


hindi binaibigay kay arki lahat ng fee

spp doc 203


specialized allied services

al ACOUSTIC DESIGN
RPF = 10% - 15% OF THE COST OF WORK

PHYSICAL PLANNING

5 HECTARES X 40K PER HECTARE = 200K PLUS 250K = 450K

USAPAN NA TO AY PER HECTARE - TERMS OF SQM


IN TERMS OF PESOS