You are on page 1of 28

FINAL REPORT

FABRIKASI PARTS ESV FOR MAJOR OUTAGE SST #300


TURBINE PT. MSW

PT. SURYA SAKTI SUKSES


Turbomachinery, Static & Rotating Equipment Product, Fabrication, and Maintenance
Services
Jl. Logam no. 02, Babakan, Kec. Legok, Kab. Tangerang, Banten 15820
Approval Sheet

CUSTOMER : PT. Makmur Sejahtera Wasesa

PART NAME : Part ESV for Major Outage SST #300


Turbine

EQUIPMENT : Emergency Stop Valve

DESCRIPTION : Fabrikasi Nut & Stud bolt

JOB NUMBER : 22028

SPK NUMBER : N/A

DATE : January 24, 2022

Prepared By : Checked By : Approved By :


PT. Surya Sakti Sukses PT. Surya Sakti Sukses PT. Makmur Sejahtera
Wasesa

M. Zaenul Arifin M Zaki Aulia


Date : 24/01/2023 Date : 24/01/2023 Date :
PT. Surya Sakti Sukses

BOLT & NUT PART ESV


( SUMMARY INCOMING INSPECTION )

Date 08-12- 2022


Job No 22028
Part Number; N/A
Serial Number N/A
Customer PT. Makmur Sejahtera Wisesa

Incoming Dimensional Inspection

No Item Finding Recommendation


1 Inlet Steam (ESV – Live
Steam Line Connection)

- Stud bolt - Stud Bolt - Stud Bolt


Dia : 1 – 5/8 inchi New Fabrication : 11 pcs
Length : 300 mm
Thread : 8G

- Nut -Nut -Nut


Thickness : 40.02 mm New Fabrication : 18 pcs
E (Hexagonal Pick) : 72.58 mm
S (Hexagonal Side) : 64.90 mm

2 Outlet Flanges (ESV – CV


Connection)

-Stud Bolt - Stud Bolt - Stud Bolt


Length : 255,8 mm New Fabrication : 6 pcs
Thread : M39 x 4 mm

3 CV – Servo

-Stud bolt - Stud Bolt - Stud Bolt


Length : 209.5 mm New Fabrication : 3 pcs
Thread : M33

-Nut -Nut -Nut


Thickness : 33.40 mm New Fabrication : 1 pcs
E (Hexagonal Pick) : 55.60 mm
S (Hexagonal Side) : 49.80 mm

Inspect by : Checked by : Approve by :

Operational Team Engineering Operational Mgr.


PT. Surya Sakti Sukses

Comparison table
No Item As Request As Received As Standard DIN 2510 part 4
1 Outlet Flange ESV – CV
L : 240 mm l1 : 250.1 mm l1 : N/A
Connection
- Stud Bolt d : N/A d : 30.8 mm d : 31 mm

Z : N/A Z : 14.5 mm Z : 10.5 mm

b : N/A b : 32 mm b : 32.5 mm

Type Bolt : Combination type b2 : N/A b2 : 40 b : 39 mm


G – S short thread
Thread : M39 x 4 mm Thread : M39 x 4 mm Thread : N/A

No Item As Request As Received As Standard DIN 2510 part 4


2 CV - Servo Connection
L : 200 mm l1 : 209.5 mm l1 : N/A
- Stud Bolt
d : N/A d : 26 mm d : 26 mm

Z : N/A Z : 8.3 mm Z : 9.5 mm

b : N/A b : 27.5 mm b : 27.5 mm


Type Bolt : Combination type
G – S short thread b2 : N/A b2 : 33 b : 33 mm

Thread : M33 Thread : M33 x 3.5 mm Thread : N/A

No Item As Request As Received As Standard DIN


3 CV - Servo Connection
- Stud Bolt
L : 300 mm L : 300.20 mm L : N/A

D : 1-5/8 D : 41.18 mm / 1.621 inch D : 41.27 mm / 1.625 inch

Type Bolt : Fully Threaded


Stud Bolt (Inchi) Thread : 8UN 2A Thread: 8 G Thread : 8UN 2A
PT. Surya Sakti Sukses

No Item As Request As Received As Standard DIN 2510 part 5


4 CV - Servo Connection
S : N/A S : 50 mm S : 50 mm
- Nut M33
e : N/A e : 55.64 mm e : 55.37 – 55.80 mm

d1 : N/A d1 : 33 mm d1 : 33 mm

d2 : N/A d2 : 48.9 d2 : 49 mm

Type Nut : NF Regular t : N/A t : 3.25 t : 3 mm

M : N/A M : 33.4 M : 33 mm

Thread : M33 Thread : M33 Thread : M33

No Item As Request As Received As Standard DIN 2510


5 Inlet Steam (ESV – Live
Steam Connection)
S / C : N/A S / C : 64.9 mm S / C : N/A
- Nut 1-5/8 8UN 2A

F / e : N/A F / e : 72.76 mm F / e : N/A

H : N/A H : 40 mm H : N/A
Type Nut : 8 UN (8
ThreadSeries)
Thread : 8UN 2A Thread : 8UN 2A Thread : N/A
Fabrikasi Parts ESV for Major Outage SST #300 Turbin

( DAILY REPORT )

Tanggal : 08/12/2022 Tipe Pekerjaan : Pengadaan / Fabrikasi


Item : ESV Part (Bolt & Nut) User : PT Makmur Sejahtera Wisesa

PROGRES
LAPORAN KEGIATAN Keterangan
Rencana Actual
1. Incoming Sample Bolt & Nut - -
2. Incoming Inspection 100% 100%
- Data dimensional & Comparison

FOTO DOKUMENTASI

Rencana Kerja Besok TARGET


1. PMI Test 100%

Disusun oleh Disetujui oleh Keterangan

Engineering Manajer Oprasional


Fabrikasi Parts ESV for Major Outage SST #300 Turbin

( DAILY REPORT )

Tanggal : 09 /12/2022 Tipe Pekerjaan : Pengadaan / Fabrikasi


Item : ESV Part (Bolt & Nut) User : PT Makmur Sejahtera Wisesa

PROGRES
LAPORAN KEGIATAN Keterangan
Rencana Actual
1. PMI Test Bolt & Nut ESV part 100% 100%
- Properties Material on PMI Report

FOTO DOKUMENTASI

Rencana Kerja Besok TARGET

Disusun oleh Disetujui oleh Keterangan

Engineering Manajer Oprasional


Fabrikasi Parts ESV for Major Outage SST #300 Turbin

( DAILY REPORT )

Tanggal : 22-26/12/2022 Tipe Pekerjaan : Pengadaan / Fabrikasi


Item : ESV Part (Bolt & Nut) User : PT Makmur Sejahtera Wisesa

PROGRES
LAPORAN KEGIATAN Keterangan
Rencana Actual
1. Fabricatioan Sample Bolt & Nut ESV 100% 100% -Sample Rejected by SSS

FOTO DOKUMENTASI

Rencana Kerja Besok TARGET


1. Fabrication new sample

Disusun oleh Disetujui oleh Keterangan

Engineering Manajer Oprasional


Fabrikasi Parts ESV for Major Outage SST #300 Turbin

( DAILY REPORT )

Tanggal : 03-10/01/2023 Tipe Pekerjaan : Pengadaan / Fabrikasi


Item : ESV Part (Bolt & Nut) User : PT Makmur Sejahtera Wisesa

PROGRES
LAPORAN KEGIATAN Keterangan
Rencana Actual
1. Fabricatioan New Sample Bolt & Nut ESV 100% 100% -

FOTO DOKUMENTASI

Rencana Kerja Besok TARGET

Disusun oleh Disetujui oleh Keterangan

Engineering Manajer Oprasional


Fabrikasi Parts ESV for Major Outage SST #300 Turbin

( DAILY REPORT )

Tanggal : 11-22/01/2023 Tipe Pekerjaan : Pengadaan / Fabrikasi


Item : ESV Part (Bolt & Nut) User : PT Makmur Sejahtera Wisesa

PROGRES
LAPORAN KEGIATAN Keterangan
Rencana Actual
1. Material X19CrMoVNbN 11-1 100% 100% -
2. Fabrikasi Nut & Bolt

FOTO DOKUMENTASI

Rencana Kerja Besok TARGET

Disusun oleh Disetujui oleh Keterangan

Engineering Manajer Oprasional


Fabrikasi Parts ESV for Major Outage SST #300 Turbin

( DAILY REPORT )

Tanggal : 23-24/12/2022 Tipe Pekerjaan : Pengadaan / Fabrikasi


Item : ESV Part (Bolt & Nut) User : PT Makmur Sejahtera Wisesa

PROGRES
LAPORAN KEGIATAN Keterangan
Rencana Actual
1. finish fabrikasi 100% 100% -
2. Packing & delivery 100% 100%

FOTO DOKUMENTASI

Rencana Kerja Besok TARGET

Disusun oleh Disetujui oleh Keterangan

Engineering Manajer Oprasional


PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

REPORT OF
POSITIVE MATERIAL IDENTIFICATION
(PMI)

PT. Pesat Servis Industri


FOR

PT. Surya Sakti Sukses

Date, December 9th, 2022

PT. PESAT SERVIS INDUSTRI


Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416,
Phone : 021 – 74639172, Fax : 021 – 74639172
Email : admin@pesatservisindustri.com, Web : www.pesatservisindustri.com

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

TABLE OF CONTENT

1. Introduction
2. Reference Documents
3. Personnel
4. Equipment
5. Calibration
6. Surface Preparation
7. Safety
8. Customer & Data Information
9. PMI Test and Data Sheet Result
Appendix :
- Equipment Certificate

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

1. INTRODUCTION
The purpose of Positive Material Identification (PMI) testing is to identify materials
using PMI equipment (optical emission spectrometer or XRF method). The testing is
to assure that materials are properly identified to their alloy type and according to
client’s specification.

2. REFERENCE DOCUMENTS
• ASME II A, B,C
• Material Specification/Mill material certificate
• X-MET 7500 User Manual

3. PERSONNEL
The personnel shall be able to demonstrate their ability to correctly use the
equipment and do the testing in compliance with PMI procedure.

4. EQUIPMENT
XMET 7500 type is used to detect and verify all types of Chemical Composition of
material except for Carbon, Phosporous, Sulphur and Silicon

5. CALIBRATION
Calibration certificate of equipment shall be available for client’s verification.

6. SURFACE PREPARATION
Material surface shall be free from any other material (paint, coating, oxide scale
etc.) which would hinder accurate test results.

7. SAFETY
All PMI personnel shall be wear minimum PPE and work under company safety
procedure.

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

8. Costumer & Data Information

Client : PT. Surya Sakti Sukses


Project :
Date of PMITest : Dec 9th, 2022

Name of Part/Material to be PMI tested:

No Description ITEM Qty Point

Inlet Steam (ESV-Live


1 Nut 1 1
steam line connection)
Inlet Steam (ESV-Live
2 Nut 1 1
steam line connection)
Inlet Steam (ESV-Live
3 Stud 1 1
steam line connection)
Outlet Flange ESV-CV
4 Stud 1 1
Connection
5 CV-Servo Stud 1 1

6 CV-Servo Nut 1 1

Total 6 6

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

9. PMI Test and Data Result

Photograph of PMI test executed and Data Sheet Result presented as follow

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

PHOTOGRAPH OF PMI TEST

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. Pesat Servis Industri Man Power Supply – Oil and Gas
Corrosion and Cathodic Protection
Lightning Prevention Systems
Industrial Services Solution Advance NDT Services

PMI Data Sheet Result

Jln.Raya,Pamulang II, No 26, Tangerang, Indonesia 15416, Phone : 021 – 74639172, Fax : 021 – 74639172
Email :admin@pesatservisindustri.com, Web : www.pesatservisindustri.com
PT. PESAT SERVIS INDUSTRI Man Power Supply – Oil and Gas Corrosion
REPORT POSITIVE MATERIAL IDENTIFICATION and Cathodic Protection Lightning
Revision Prevention Systems Advance NDT Services
0

PMI TEST DATA


Customer : PT. SURYA SAKTI SUKSES
Client :
Project :
Job No. :
Date of Inspection : 9-12-2022
Location : Legok, Tangerang-Banten

No Date Item Mode Material Spec Duration Cr Mo Ni Mn


Inlet Steam (ESV-Live steam line
1 09.12.2022 Alloys SA216 WCB 10,0 1.10 0.205 0.264 0.78
connection)
Inlet Steam (ESV-Live steam line
2 09.12.2022 Alloys N/A 10,0 1.15 0.215 0.278 0.79
connection)
Inlet Steam (ESV-Live steam line
3 09.12.2022 Alloys ER90SB9 10,0 10.97 0.914 0.59 0.72
connection)
4 09.12.2022 Outlet Flange ESV-CV Connection Alloys N/A 10,0 11.22 0.937 0.83 0.69

5 09.12.2022 CV-Servo Alloys N/A 10,0 10.08 1.122 0.52 0.82


6 09.12.2022 CV-Servo Alloys N/A 10,0 8.78 1.150 0.34 0.72
SA216 WCB 0.00-0.50 0.00-0.20 0.00-0.50 0.00-1.28
LIMIT
ER90SB9 8.00-9.50 0.80-1.10 0.00-1.00 0.00-1.25

Inspected & Report by : Client :

PMI Inspector Name :


№QQX00058762 1
质保书号/Sheet No.QQX00058762 产品名称/Description of Goods:19 铬钼六角棒/X19CrMoVNbN111 Steel Hexagonal Bar L-LV-YUR-PSY21-03
合同号/Contract No.:TG220721 钢号/Grade:X19CrMoVNbN111 订货单位/Shipper:山东太钢国际贸易有限公司
交货状态/Condition: 热轧/Hot Rolled 执行标准/Specification:DIN 收货单位/Sold To: 济南
工程名称/Projiect Name
序号 出口批号 生产编号 炉号 规格 定尺 化学成份 Chemical Composition % 碳当量
No. Export No. Rolling No. Heat No. Size(mm) Length(m) C Si Mn P S Cr Ni Cu Mo Ti Nb V %

1 ---- NM2MF23KJ3 2022XHX2 5*6000 6 0.18 0.34 0.56 0.017 0.021 10.20 0.62 / 0.73 / 0.30 0.15 ----

2 ---- LK51CY21KL 2022FDA2 6*6000 6 0.19 0.35 0.60 0.019 0.027 10.50 0.58 / 0.70 / 0.34 0.18 ----

3 ---- LK51CY21KL 2022IHL5 7*6000 6 0.20 0.30 0.58 0.021 0.018 10.70 0.60 / 0.68 / 0.28 0.20 ----

4 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----

屈服强度 抗拉强度 弯曲实验


V 型冲击功 Impactvalue V-notch
重量 Yield Strenght Tensile 屈强比 延伸率 BendTest180°
序号 件数 支数
Weight Re(N/mm2) Strenght Yiled Rate Elongatio
No. Bundles Pieces 结果 实验温度 试样尺寸 数值
(MT) RM (%) n A% d
Result Temp(℃) Sample Size(mm) Value(J) 说明/Explain:
(N/mm2)
1 --- 20 200 850 ---- 900 ---- 15 ---- 16 ---- ---- ---- 690/0/730℃ 5*6000 --- --- ----

2 ---- ---- ---- ---- ---- ---- ---- ---- ---- --- ---- ---- ---- ----- ---- --- --- ----

3 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- --- --- ----

4 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- --- --- ---

本产品是中国冶金行业首批通过 ISO9001、ISO14001、OHSAS18001 三体系认证企业,热轧钢板获中国明牌产品,SS400、SM490A、SM490B、SN490B 系列钢板通过日本 JCA 认证,S235、S275、S355 系列钢板通过


欧标 CE 认证。

1、 材料的表面质量和外形尺寸均合格。Surface quality and shape size of material are all qualified.


说明
2、 有异议时,来函请标明钢号、批号、规格、发货日期、原因,并将实物保管好。When there is any comptain,you are kindly requested to mark the steel Grade Heat No Size Delivery Date causeds and materials in the condition.
Explain 3、 本质量证明书复印无效。The press copy invalid.

备注:
鲁 S71556
Remarks:

填写日期/Lessued Date:2022-07-21 填写人/Principat: 复核人/Signature:马宁 质量部门盖章有效/Stamp of Quality Assurance

You might also like