You are on page 1of 51

Activity ID

SSCC1008
SSCC1008
SSCC1008
SSCC1008
Ground Floor-Errection Of Panel
SSCC1008GG
Ground Floor Clearance to MEP
SSCC1008
Ground Floor MEP First Fix
Plumbing
SSCC1
SSCC1
Drainage
SSCC1
SSCC1
Ground Floor Second Fix
Electrical Light & Power
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
ELV
Fire Alarm
SSCC
SSCC
SSCC
SSCC
SSCC
Telephone & Data
SSCC
SSCC
SSCC
SSCC
SSCC
Smatv
SSCC
SSCC
SSCC
SSCC
SSCC
Pava System
SSCC
SSCC
SSCC
SSCC
SSCC
Centralized Clock
SSCC
SSCC
SSCC
SSCC
SSCC
Plumbing
SSCC1
SSCC1
SSCC1
SSCC1
Drainage
SSCC1
SSCC1
SSCC1
HVAC
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Fire Fighting
SSCC1
SSCC1
SSCC1
SSCC1
Ground Floor Final Fix
Electrical Light & Power
SSCC10
SSCC10
SSCC10
ELV
Fire Alarm
SSCC
SSCC
Telephone & Data
SSCC
SSCC
Smatv
SSCC
Centalized Clock
SSCC
Pava- System
SSCC
Plumbing
SSCC1
SSCC1
Drainage
SSCC1
HVAC
SSCC1
SSCC1
Fire Fighting
SSCC1
SSCC1
SSCC1
First Floor- Errection Of Panel
SSCC1008GG
First Floor Clearance to MEP
SSCC1008
First Floor First Fix
Plumbing
SSCC1
SSCC1
Drainage
SSCC1
SSCC1
First Floor Second Fix
Electrical Lights & Power
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
ELV
Fire Alarm
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Telephone & Data System
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Smatv
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Pava- System
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Centralized Clock
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Plumbing
SSCC1
SSCC1
SSCC1
SSCC1
Drainage
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Fire Fighting
SSCC1
SSCC1
SSCC1
SSCC1
First Floor -MEP Final Fix
Electrical Lights & Power
SSCC1
SSCC1
SSCC1
ELV
Fire Alarm
SSCC1
Telephon & Data System
SSCC1
Smatv
SSCC1
Centralized Clock
SSCC1
Pava System
SSCC1
Plumbing
SSCC1
SSCC1
Drainage
SSCC1
HVAC
SSCC1
SSCC1
Fire Fighting
SSCC1
SSCC1
SSCC1
Second Floor- Errection Of Panel
SSCC1008GG
Second Floor Clearance to MEP
SSCC1008
MEP First Fix
Plumbing
SSCC1
SSCC1
Drainage
SSCC1
SSCC1
Second Floor-MEP Second Fix
Electrical Lights & Power
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
ELV
Fire Alarm
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Telephone & Data System
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Smatv
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Pava-System
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Centralized Clock
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Plumbing
SSCC1
SSCC1
SSCC1
SSCC1
Drainage
SSCC1
SSCC1
SSCC1
HVAC
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Fire Fighting
SSCC1
SSCC1
SSCC1
SSCC1
Second Floor -MEP Final Fix
Electrical Lights & Power
SSCC10
SSCC10
SSCC10
ELV
Fire Alarm
SSCC1
Telephone & Data System
SSCC1
Smatv
SSCC1
Centralized Clock
SSCC1
Pava- System
SSCC1
Plumbing
SSCC1
SSCC1
Drainage
SSCC1
HVAC
SSCC1
SSCC1
Fire Fighting
SSCC1
SSCC1
SSCC1
Roof Floor- Errection Of Panel
SSCC1008GG
Roof Floor -Clearance to MEP
SSCC1008
MEP First Fix
Plumbing
Drainage
SSCC1
SSCC1
Roof Floor-MEP Second Fix
Electrical Lights & Power
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
SSCC10
ELV
Fire Alarm
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Smatv
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Plumbing
SSCC1
SSCC1
SSCC1
SSCC1
Drainage
SSCC1
SSCC1
SSCC1
HVAC
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
SSCC1
Roof Floor -MEP Final Fix
Electrical Lights & Power
SSCC10
SSCC10
ELV
Fire Alarm
SSCC1
SSCC1
SSCC1
Smatv
SSCC1
Centralized Clock
Plumbing
SSCC1
SSCC1
Drainage
SSCC1
HVAC
SSCC1
PRE TESTING AND COMMISSIONING
Electrical Lights & Power(Ground,First,Second & Roof Floor)
SSCCT1008G
ELV (Ground,First,Second & Roof Floor)
Fire Alarm (Ground,First,Second & Roof Floor)
SSCCT1008
Telephone & Data System (Ground,First,Second & Roof Floor)
SSCCT1008
Pava System (Ground,First,Second & Roof Floor)
SSCCT1008
Smatv( Ground,First,Second & Roof Floor)
SSCCT1008
Master Clock (Ground,First,Second & Roof Floor)
SSCCT1008
Plumbing (Ground,First,Second & Roof Floor)
SSCCT1008G
Drainage (Ground,First,Second & Roof Floor)
SSCCT1008G
HVAC (Ground,First,Second & Roof Floor)
SSCCT1008G
Fire Fighting (Ground,First,Second & Roof Floor)
SSCCT1008G

SSCCT1008GT
SSCCT1008GT
SSCCT1008GT
SSCCT1008GT
SSCCT1008GT
Original
Activity Name Duration

Underground MEP Foundation Sleeve FD-Works 1008-UG 10


Underground works for upvc drain FD-Works 1008-UG 10
Underground Gravity test for upvc drain FD-Works 1008-UG 10
Underground for electrical duct FD-Works 1008-UG 11
nd Floor-Errection Of Panel
Supervision of MEP Services During Panel Casting 1008-GF
und Floor Clearance to MEP
Clearance to Proceed MEP Works 1008-GF
ound Floor MEP First Fix

Installation of hangers and support for plumbing works -1008-GF 12


Installation of PPR pipes and Fittings for plumbing works -1008-GF 12

Installation of Hangers and Support for drain 1008-GF 8


Installation of UPVC Drain - 1008-GF 12
ound Floor Second Fix
ectrical Light & Power
Installation of hangers and support for electrical 1008-GF 21
Installation of cable trays and trunking 1008-GF 25
Installation of conduit and fittings 1008-GF 25
Wirre pulling for lighting and power supply 1008-GF 15
Cable pulling Ground Floor 1008-GF 15
Installation Of Ceiling Rose,power lighting & ELV System 1008-GF 21
Continuity Testing for power Lighting & ELV System 1008-GF 4

Fire Alarm
Installation of hangers and support for electrical for Fire Alarm 1008-GF 10
Installation of conduit and fittings for Fire Alarm 1008-GF 12
Installation of cable trays and trunking for Fire Alarm 1008-GF 8
Wire pulling of fire rated cable for Fire Alarm 1008-GF 17
Continuity testing fire alarm 1008-GF 3
Telephone & Data
Installation of hangers and support for electrical (Tele & Data 1008-GF) 14
Installation of conduit and fittings (Tele & Data 1008-GF) 20
Installation of cable trays and trunking (Tele & Data 1008-GF) 11
Wire pulling for telephone and data outlet (Tele & Data 1008-GF) 17
Fluke testing for telephone and data (Tele & Data 1008-GF) 3

Installation of hangers and support for electrical (SMATV 1008-GF) 10


Installation of conduit and fittings (SMATV 1008-GF) 14
Installation of cable trays and trunking (SMATV 1008-GF) 11
Wire pulling for smatv cable ( Co-Ax cable) (SMATV 1008-GF) 10
Fluke testing (SMATV 1008-GF) 3
Pava System
Installation of hangers and support for electrical (PAVA System 1008-GF) 12
Installation of conduit and fittings (PAVA System 1008-GF) 11
Installation of cable trays and trunking (PAVA System 1008-GF) 17
Cable pulling of Coaxe cable (PAVA System 1008-GF) 10
Fluke testing / Continuity tetsing (PAVA System 1008-GF) 4
Centralized Clock
Installation of hangers and support for electrical (Centralized Clock-1008-G 10
Installation of conduit and fittings Ground Floor (Centralized Clock-1008-GF 12
Installation of cable trays and trunking Ground Floor (Centralized Clock-10 11
Wire pulling for centralized clock Ground Floor (Centralized Clock-1008-GF) 16
Fluke testing for centralized clock Ground Floor (Centralized Clock-1008-GF 3

Installation of hangers and support (Plumbing-1008-GF) 15


Installation of copper pipes and fittings (Plumbing-1008-GF) 10
Installation of rubber insulation for water pipe line (Plumbing-1008-GF) 12
Leak testing for water supply line (Plumbing-1008-GF) 4

Installation of hangers and support (Drainage-1008-GF) 15


Installation of UPVC (Drainage-1008-GF) 16
Gravity testing (Drainage-1008-GF) 4
Installation of hangers an support for HVAC (HVAC-1008-GF) 18
Installation of ducting (HVAC-1008-GF) 30
Installation drain line (HVAC-1008-GF) 10
Installation of chilled water pipes and valves (HVAC-1008-GF) 26
Installation of valves and fittings (HVAC-1008-GF) 3
Chilled water pipe leak testing (HVAC-1008-GF) 4
Installation of insullation for chilled water pipes (HVAC-1008-GF) 17
Installation of insulation for ducting (HVAC-1008-GF) 14
Duct leak test (HVAC-1008-GF) 4
Installation of dumpers and attenuators (HVAC-1008-GF) 14
Installation of FCU (HVAC-1008-GF) 24
re Fighting
Installation of valves and fittings (Fire Fighting-1008-GF) 15
Installation of hangers and support for (Fire Fighting-1008-GF) 12
Intallation of pipes and fittings for (Fire Fighting-1008-GF) 22
Pressure leak testing for (Fire Fighting-1008-GF) 4
ound Floor Final Fix
ectrical Light & Power
Installation and termination of light fittings (Final Fix-1008-GF) 20
Installation and termination of wirings accesssories and isolator (Final Fix- 20
Installation and termination of SDB and DB (Final Fix-1008-GF) 20

Fire Alarm
Installation and termination of fire alarm devices (Final Fix-1008-GF) 25
Mounting and installation of Fire Alarm Panel (Final Fix-1008-GF) 10
Telephone & Data
Installation and termination of telephone and data outlet (Final Fix-1008-G 14
Installation and termination of IDF (Final Fix-1008-GF) 6

Installlation and terminatin of TV Outlet (Final Fix-1008-GF) 5


Centalized Clock
Installation and termination of master clock devices (Final Fix-1008-GF) 5
Pava- System
Installation and Termination of Speakers (Final Fix-1008-GF) 15
Installation of water heater (Plumbing Final Fix-1008-GF) 20
Installation of sanitary wares (Plumbing Final Fix-1008-GF) 50

Installation of FCO, CO, VC (Drainage Final Fix-1008-GF) 14

Installatuon of AC Units (HVAC Final Fix-1008-GF) 10


Installation of deffuser;'s , VCD and all Accessories (HVAC Final Fix-1008-GF 21
re Fighting
Installation of sprinkler heads (Fire Fighting Final Fix-1008-GF) 30
Installation of FHR (Fire Fighting Final Fix-1008-GF) 15
Installation of Fire Ex and Blanket (Fire Fighting Final Fix-1008-GF) 4
Floor- Errection Of Panel
Supervision of MEP Services During Panel Casting (1008-FF)
Floor Clearance to MEP
Clearance to proceed MEP Works (1008-FF)
st Floor First Fix

Installation of hangers and support for plumbing (1008-FF) 12


Installation of PPR pipes and Fittings for plumbing (1008-FF) 11

Installation of hangers and support for drainage (1008-FF) 12


Installation of UPVC for drainage (1008-FF) 12
st Floor Second Fix
ectrical Lights & Power
Installation of hangers and support for electrical system ( Electrical Light 15
Installation of cable trays and trunking ( Electrical Light & Power 1008-FF) 12
Installation of conduit and fittings ( Electrical Light & Power 1008-FF) 24
Wirre pulling for lighting and power supply ( Electrical Light & Power 1008- 16
Cable pulling ( Electrical Light & Power 1008-FF) 10
Continuity testing ( Electrical Light & Power 1008-FF) 5
Installation of cieling Rose ( Electrical Light & Power 1008-FF) 12

Fire Alarm
Installation of conduit and fittings ( Fire Alarm 1008-FF) 14
Installation of hangers and support for electrical system ( Fire Alarm 1008-F 10
Installation of cable trays and trunking ( Fire Alarm 1008-FF) 8
Wire pulling of fire rated cable ( Fire Alarm 1008-FF) 17
Continuity testing ( Fire Alarm 1008-FF) 3
Telephone & Data System
Installation of hangers and support for electrical system ( Tele & Data 1008 10
Installation of cable trays and trunking ( Tele & Data 1008-FF) 8
Installation of conduit and fittings ( Tele & Data 1008-FF) 12
Wire pulling for telephone and data outlet ( Tele & Data 1008-FF) 17
Fluke testing ( Tele & Data 1008-FF) 4

Installation of hangers and support for electrical system ( SMATV-1008-FF) 10


Installation of cable trays and trunking ( SMATV-1008-FF) 8
Installation of conduit and fittings ( SMATV-1008-FF) 12
Wire pulling for smatv cable ( Co Ax cable) ( SMATV-1008-FF) 13
Fluke testing ( SMATV-1008-FF) 4
Pava- System
Installation of hangers and support for ( Electrical PAVA System-1008-FF) 12
Installation of cable trays and trunking ( Electrical PAVA System-1008-FF) 12
Installation of conduit and fittings ( Electrical PAVA System-1008-FF) 12
Wire pulling for smatv cable ( CAT 6 and Fire rated cable) ( Electrical PAVA 12
Fluke testing / Continuity tetsing ( Electrical PAVA System-1008-FF) 4
Centralized Clock
Installation of hangers and support for electrical system ( Centralized Cloc 8
Installation of cable trays and trunking ( Centralized Clock-1008-FF) 8
Installation of conduit and fittings ( Centralized Clock-1008-FF) 8
Wire pulling for centralized clock ( Centralized Clock-1008-FF) 12
Fluke testing ( Centralized Clock-1008-FF) 3

Installation of hangers and support for ( Plumbing-1008-FF) 12


Installation of copper pipes and fittings ( Plumbing-1008-FF) 12
Installation of rubber insulation ( Plumbing-1008-FF) 10
Leak testing ( Plumbing-1008-FF) 4

Installation of hangers and support for ( Drainage-1008-FF) 12


Installation of UPVC ( Drainage-1008-FF) 11
Gravity testing ( Drainage-1008-FF) 4
Installation of hangers an support ( HVAC-1008-FF) 12
Installation drain line ( HVAC-1008-FF) 8
Installation of chilled water pipes and valves ( HVAC-1008-FF) 13
Installation of ducting ( HVAC-1008-FF) 22
Installation of insulation for Ducting (HVAC-1008-FF) 6
Installation of valves and fittings ( HVAC-1008-FF) 10
Duct leak test ( HVAC-1008-FF) 4
Installation of dumpers and attenuators ( HVAC-1008-FF) 8
Chilled water pipe leak testing ( HVAC-1008-FF) 3
Installation of insullation for chilled water pipes ( HVAC-1008-FF) 13
Installation of FCU ( HVAC-1008-FF) 24
re Fighting
Installation of hangers and support ( Fire Fighting-1008-FF) 12
Intallation of pipes and fittings ( Fire Fighting-1008-FF) 16
Installation of valves and fittings ( Fire Fighting-1008-FF) 12
Pressure leak testing ( Fire Fighting-1008-FF) 4
st Floor -MEP Final Fix
ectrical Lights & Power
Installation and termination of wirings accesssories and isolator ( Elect Ligh 10
Installation and termination of SDB and DB ( Elect Lighting Final Fix-1008-F 12
Installation and termination of light fittings ( Elect Lighting Final Fix-1008-FF 14

Fire Alarm
Installation and termination of fire alarm devices ( Fire Alam Final Fix-1008- 14
Telephon & Data System
Installation and termination of telephone and data outlet ( Tele & Data Fin 10

Installlation and terminatin of TV outlet ( SMATV Final Fix-1008-FF) 10


Centralized Clock
Installation and termination of clock system ( Centalized Clock Final Fix-10 10
Pava System
Installation and termination of speakers ( PAVA System Fix-1008-FF) 15

Installation of sanitary wares ( Plumbing Final Fix-1008-FF) 30


Installation of water heater ( Plumbing Final Fix-1008-FF) 10
Installation of FCO, CO, VC ( Drainage Final Fix-1008-FF) 10

Installation of AC units ( HVAC Final Fix-1008-FF) 11


Installation of deffuser;'s , VCD and all accessories ( HVAC Final Fix-1008-FF 10
re Fighting
Installation of FHR ( Fire Fighting Final Fix-1008-FF) 10
Installation of Fire Ex and Blanket ( Fire Fighting Final Fix-1008-FF) 2
Installation of sprinkler head ( Fire Fighting Final Fix-1008-FF) 20
nd Floor- Errection Of Panel
Supervision of MEP services during panel Casting ( 1008- SF)
ond Floor Clearance to MEP
Clearance to proceed MEP works Second Floor ( 1008- SF)
P First Fix

Installation of hangers and support ( Plumbing 1008- SF) 10


Installation of PPR pipes and Fittings ( Plumbing 1008- SF) 12

Installation of hangers and support ( Drainage 1008- SF) 10


Installation of UPVC Drain ( Drainage 1008- SF) 12
cond Floor-MEP Second Fix
ectrical Lights & Power
Installation of hangers and support (Elect Light & Power- 1008- SF) 12
Installation of cable trays and trunking (Elect Light & Power- 1008- SF) 16
Installation of conduit and fittings (Elect Light & Power- 1008- SF) 20
Wirre pulling for lighting and power supply (Elect Light & Power- 1008- SF) 20
Cable pulling (Elect Light & Power- 1008- SF) 14
Installation of cieling rose (Elect Light & Power- 1008- SF) 12
Continuity Testing (Elect Light & Power- 1008- SF) 10

Fire Alarm
Installation of hangers and support (Fire Alarmr- 1008- SF) 12
Installation of cable trays and trunking (Fire Alarmr- 1008- SF) 12
Installation of conduit and fittings (Fire Alarmr- 1008- SF) 12
Wire pulling of fire rated cable (Fire Alarmr- 1008- SF) 15
Continuity testing for FA (Fire Alarmr- 1008- SF) 2
Telephone & Data System
Installation of hangers and support Tele & Data (1008- SF) 12
Installation of cable trays and trunking Tele & Data (1008- SF) 15
Installation of conduit and fittings Tele & Data (1008- SF) 10
Wire pulling for telephone and data outlet Tele & Data (1008- SF) 16
Fluke Testing for Tele & Data (1008- SF) 8

Installation of hangers and support SMATV (1008- SF) 12


Installation of cable trays and trunking SMATV (1008- SF) 8
Installation of conduit and fittings SMATV (1008- SF) 18
Wire pulling for smatv cable ( Co Ax cable) SMATV (1008- SF) 10
Fluke Testing for SMATV (1008- SF) 3
Pava-System
Installation of hangers and support PAVA System (1008- SF) 10
Installation of cable trays and trunking PAVA System (1008- SF) 8
Installation of conduit and fittings PAVA System (1008- SF) 10
Wire pulling for smatv cable ( CAT 6 and Fire rated cable) PAVA System (100 14
Fluke and continuity testing for SMATV....PAVA System (1008- SF) 4
Centralized Clock
Installation of hangers and support Centralized clock(1008- SF) 10
Installation of cable trays and trunking Centralized clock(1008- SF) 10
Installation of conduit and fittings Centralized clock(1008- SF) 12
Wire pulling for Centralized clock(1008- SF) 10
Fluke testing for Centralized clock(1008- SF) 3

Installation of hangers and support Plumbing (1008- SF) 12


Installation of copper pipes and fittings Plumbing (1008- SF) 10
Installation of rubber insulation for water supply ,Plumbing (1008- SF) 10
Leak Testing Plumbing (1008- SF) 4

Installation of hangers and support Drainage (1008- SF) 12


Installation of UPVC Drainage (1008- SF) 12
Gravity testing Drainage (1008- SF) 2

Installation of hangers an support HVAC (1008- SF) 20


Installation of ducting HVAC (1008- SF) 18
Installation drain line HVAC (1008- SF) 5
Installation of valves and fittings HVAC (1008- SF) 12
Instaaltion of insullation for chilled water pipes HVAC (1008- SF) 14
Installation of chilled water pipes and valves HVAC (1008- SF) 14
Installation of insulation for ducting HVAC (1008- SF) 15
Installation of dumpers and attenuators HVAC (1008- SF) 6
Duct Leak Testing (1008- SF) 4
Installation of FCU HVAC (1008- SF) 18
Second Floor HVAC (1008- SF) 12
Chilled water pipe leak testing HVAC (1008- SF) 6
re Fighting
Installation of hangers and support (Fire Fighting -1008- SF) 14
Intallation of pipes and fittings (Fire Fighting -1008- SF) 20
Installation of valves and fittings (Fire Fighting -1008- SF) 8
Pressure leak testing (Fire Fighting -1008- SF) 4
cond Floor -MEP Final Fix
ectrical Lights & Power
Installation and termination of light fittings (Elect Light & Power- 1008- SF) 18
Installation & termination of wirings accesssories and isolator (Elect Light 10
Installation and termination of SDB and DB (Elect Light & Power- 1008- SF) 8

Fire Alarm
Installation and termination of fire alarm devices (Fire Alarm- 1008- SF) 14
Telephone & Data System
Installation and termination of telephone and data outlet (Tele & Data- 10 10

Installlation and terminatin of TV outlet (SMATV- 1008- SF) 10


Centralized Clock
Installation and termination of clock system (Centralized Clock- 1008- SF) 10
Pava- System
Installation and termination of speakers (PAVA System- 1008- SF) 12

Installation of sanitary wares (Plumbing- 1008- SF) 21


Installation of water heater (Plumbing- 1008- SF) 7

Installation of floor drain and clean out (Drainage- 1008- SF) 8


Installation of deffuser;'s , VCD and all accessories (HVAC- 1008- SF) 12
Installation of AC units (HVAC- 1008- SF) 12
re Fighting
Installation of sprinkler head (Fire Fighting- 1008- SF) 14
Installation of FHR (Fire Fighting- 1008- SF) 6
Installation of Fire Ex and Blanket (Fire Fighting- 1008- SF) 2
Floor- Errection Of Panel
Supervision of MEP services during panel casting In ( 2nd Fix-1008- RF)
f Floor -Clearance to MEP
Clearance to Proceed MEP Works ( 2nd Fix-1008- RF)
P First Fix

Installation of hangers and Support (Drainage 2ND FIX -1008- RF) 7


Installation of UPVC Drain (Drainage 2ND FIX-1008- RF) 7
of Floor-MEP Second Fix
ectrical Lights & Power
Installation of hangers and support (Elect Light & Power- 2ND FIX -1008- RF 6
Installation of cable trays and trunking (Elect Light & Power- 2ND FIX -1008- 12
Installation of conduit and fittings (Elect Light & Power- 2ND FIX -1008- RF) 7
Continuity Testing (Elect Light & Power- 2ND FIX -1008- RF) 3
Wirre pulling for lighting and power supply (Elect Light & Power- 2ND FIX - 6
Cable pulling (Elect Light & Power- 2ND FIX -1008- RF) 7
Installation of Cieling rose (Elect Light & Power- 2ND FIX -1008- RF) 4

Fire Alarm
Installation of hangers and support (Fire Alarm- 2ND FIX -1008- RF) 6
Installation of cable trays and trunking (Fire Alarm- 2ND FIX -1008- RF) 4
Installation of conduit and fittings (Fire Alarm- 2ND FIX -1008- RF) 6
Wire pulling of fire rated cable (Fire Alarm- 2ND FIX -1008- RF) 4
Continuity Testing (Fire Alarm- 2ND FIX -1008- RF) 2

Installation of hangers and support (SMATV-2ND FIX -1008- RF) 4


Installation of cable trays and trunking (SMATV-2ND FIX -1008- RF) 6
Installation of conduit and fittings (SMATV-2ND FIX -1008- RF) 3
Wire pulling for smatv cable ( Co ax cable) (SMATV-2ND FIX -1008- RF) 5
Fluke testing (SMATV-2ND FIX -1008- RF) 3

Installation of rubber insulation (Plumbing-2ND FIX-1008- RF) 4


Leak testing (Plumbing-2ND FIX-1008- RF) 4
Installation of hangers and support (Plumbing-2ND FIX-1008- RF) 5
Installation of copper pipes and fittings (Plumbing-2ND FIX-1008- RF) 5

Installation of hangers and support (Drainage-2ND FIX-1008- RF) 6


Installation of UPVC (Drainage-2ND FIX-1008- RF) 6
Gravity testing (Drainage-2ND FIX-1008- RF) 4

Installation of hangers an support (HVAC-2ND FIX-1008- RF). 10


Installation of Aluminum cladding (HVAC-2ND FIX-1008- RF). 14
Installation drain line (HVAC-2ND FIX-1008- RF). 6
Installation of chilled water pipes and valves (HVAC-2ND FIX-1008- RF). 12
Installation of insulation for ducting (HVAC-2ND FIX-1008- RF). 14
Installation of valves and fittings (HVAC-2ND FIX-1008- RF). 12
Installtion of insullation for chilled water pipes (HVAC-2ND FIX-1008- RF). 10
Chilled water pipe leak testing (HVAC-2ND FIX-1008- RF). 2
Duct leak test (HVAC-2ND FIX-1008- RF). 4
of Floor -MEP Final Fix
ectrical Lights & Power
Installation and termination of light fittings (Elect Light & Power- Final Fix 8
Installation and termination of wirings accesssories and isolator (Elect Ligh 5

Fire Alarm
Installation and termination of fire alarm devices (Fire Alarm- Final Fix -1008 6
Programming (Fire Alarm- Final Fix -1008- RF).. 10
Initial Testing of FA (Fire Alarm- Final Fix -1008- RF) 3

Installlation and terminatin of TV Disc (SMATV- Final Fix -1008- RF) 6


Centralized Clock

Installation of water tank (Plumbing- Final Fix -1008- RF) 6


Installation of water pump (Plumbing- Final Fix -1008- RF) 7
Installation of floor drain and clean out and roof (Drainage- Final Fix -1008- 3

Installation of AC units (HVAC Fix -1008- RF).. 18


ESTING AND COMMISSIONING 51
rical Lights & Power(Ground,First,Second & Roof Floor) 15
Pre-Testing and Commissioning With Small Power (GF,FL.SF,RF 1008)
Ground,First,Second & Roof Floor)
Alarm (Ground,First,Second & Roof Floor)
Testing and Commissioning for Fire Alarm (GF,FL.SF,RF 1008) 15
phone & Data System (Ground,First,Second & Roof Floor) 15
Testing and Commissioning for Telephone & Data System (GF,FL.SF,RF 1008)
a System (Ground,First,Second & Roof Floor) 15
Testing and Commissioning of PAVA System (GF,FL.SF,RF 1008)
tv( Ground,First,Second & Roof Floor) 10
Testing and Commissioning for SMATV (GF,FL.SF,RF 1008)
ter Clock (Ground,First,Second & Roof Floor) 15
Master Clock Teting and Commissioning (GF,FL.SF,RF 1008)
bing (Ground,First,Second & Roof Floor) 12
Testing and Commissioning for Plumbing System (GF,FL.SF,RF 1008)
age (Ground,First,Second & Roof Floor) 12
Testing and Commissioning for Drainage System (GF,FL.SF,RF 1008)
C (Ground,First,Second & Roof Floor) 12
Testing and Commissioning for HVAC (GF,FL.SF,RF 1008)
ighting (Ground,First,Second & Roof Floor) 13
Testing and Commissioning for Fire Fighting System (GF,FL.SF,RF 1008)

Civil Defenece Inspection & Approval


kharamaah Inspection & Approval
Documentation,Asbuilt & Mantenance Manual Submission
Demobilization
Final Handing Over 2

1008
ENG
PRO
CON
T&C

1004
ENG
PRO
CON
T&C

1007
ENG
PRO
CON
T&C
Average
Daily
Start Finish Quantity Unit Unit Mh Productivit
y

24-Aug-19 3-Sep-19 3,600 pcs 0.01 360.00


4-Sep-19 15-Sep-19 974 points 0.12 97.40
4-Sep-19 15-Sep-19 9,157 mtr 0.00 915.70
4-Sep-19 16-Sep-19 59 points 0.54 5.36

2-Nov-19 14-Nov-19 1,920 mtr 0.00 160.00


7-Nov-19 20-Nov-19 1,748 mtr 0.03 145.67

2-Nov-19 10-Nov-19 1,280 pcs 0.03 160.00


21-Nov-19 4-Dec-19 1,314 mtr 0.18 109.50

6-Nov-19 30-Nov-19 7,200 meter 0.02 342.86


1-Dec-19 29-Dec-19 9,763 meter 0.01 390.52
25-Dec-19 22-Jan-20 428 meter 0.16 17.12
23-Jan-20 9-Feb-20 1,573 meter 0.02 104.87
10-Feb-20 26-Feb-20 21,263 meter 0.00 1,417.5
27-Feb-20 22-Mar-20 1,200 points 0.10 57.14
23-Mar-20 26-Mar-20 1,200 points 0.01 300.00

10-Nov-19 20-Nov-19 5,200 meter 0.02 520.00


16-Nov-19 28-Nov-19 1,741 meter 0.04 145.08
30-Nov-19 8-Dec-19 428 meter 0.27 53.50
7-Jan-20 26-Jan-20 6,000 meter 0.01 352.94
21-Jan-20 23-Jan-20 557 points 0.01 185.67

10-Nov-19 25-Nov-19 2,304 meter 0.04 164.57


16-Nov-19 8-Dec-19 14,640 meter 0.01 732.00
26-Nov-19 8-Dec-19 563 meter 0.19 51.18
9-Dec-19 28-Dec-19 14,640 meter 0.01 861.18
26-Dec-19 29-Dec-19 1,093 points 0.00 364.33

10-Nov-19 20-Nov-19 3,072 meter 0.04 307.20


16-Nov-19 1-Dec-19 3,400 meter 0.04 242.86
2-Dec-19 14-Dec-19 563 meter 0.08 51.18
15-Dec-19 25-Dec-19 3,400 meter 0.03 340.00
29-Dec-19 31-Dec-19 88 points 0.14 29.33

13-Nov-19 26-Nov-19 2,304 meter 0.04 192.00


25-Nov-19 7-Dec-19 456 meter 0.21 41.45
27-Nov-19 16-Dec-19 2,880 meter 0.04 169.41
9-Dec-19 19-Dec-19 2,880 meter 0.07 288.00
1-Jan-20 5-Jan-20 64 points 0.05 16.00

13-Nov-19 24-Nov-19 1,800 meter 0.13 180.00


19-Nov-19 2-Dec-19 1,384 meter 0.08 115.33
3-Dec-19 15-Dec-19 281 meter 0.38 25.55
16-Dec-19 2-Jan-20 18,000 meter 0.01 1,125
4-Jan-20 6-Jan-20 88 points 0.07 29.33

13-Nov-19 30-Nov-19 1,500 mtr 0.08 100.00


1-Dec-19 11-Dec-19 452 mtr 0.03 45.20
12-Dec-19 25-Dec-19 452 mtr 0.19 37.67
2-Jan-20 6-Jan-20 390 points 0.02 97.50

13-Nov-19 30-Nov-19 1,500 mtr 0.02 100.00


1-Dec-19 18-Dec-19 1,314 lot 0.02 82.13
19-Dec-19 23-Dec-19 39 lot 0.21 9.75
13-Nov-19 3-Dec-19 130 pcs 0.69 7.22
25-Nov-19 29-Dec-19 2,720 mtr 0.07 90.67
25-Nov-19 5-Dec-19 513 mtr 0.39 51.30
25-Nov-19 24-Dec-19 1,730 pcs 0.12 66.54
30-Dec-19 1-Jan-20 107 mtr 0.72 35.67
2-Jan-20 6-Jan-20 3,253 sq.m 0.00 813.25
2-Jan-20 21-Jan-20 450 mtr 0.23 26.47
6-Jan-20 21-Jan-20 1,730 mtr 0.04 123.57
22-Jan-20 26-Jan-20 3,253 pcs 0.00 813.25
22-Jan-20 6-Feb-20 500 pcs 0.17 35.71
8-Feb-20 5-Mar-20 102 pcs 0.80 4.25

1-Sep-19 17-Sep-19 24 pcs 3.75 1.60


16-Sep-19 29-Sep-19 1,800 mtr 0.04 150.00
18-Sep-19 13-Oct-19 1,520 mtr 0.08 69.11
14-Oct-19 17-Oct-19 1,012 points 0.01 253.00

23-Mar-20 14-Apr-20 948 points 0.15 47.40


28-Mar-20 19-Apr-20 30 points 4.75 1.50
28-Mar-20 19-Apr-20 1,200 points 0.07 60.00

17-Mar-20 14-Apr-20 557 points 0.11 22.28


29-Mar-20 8-Apr-20 1 points 60.00 0.10

26-Feb-20 12-Mar-20 1,093 points 0.04 78.07


15-Mar-20 21-Mar-20 19 points 2.53 3.17

17-Dec-19 22-Dec-19 88 points 0.17 17.60

1-Jan-20 6-Jan-20 38 points 0.39 7.60

6-Jan-20 22-Jan-20 64 points 0.94 4.27


26-Dec-19 18-Jan-20 108 pcs 0.74 5.40
29-Dec-19 24-Feb-20 390 pcs 0.31 7.80

29-Dec-19 13-Jan-20 39 pcs 2.05 2.79

7-Mar-20 17-Mar-20 500 pcs 0.07 50.00


7-Mar-20 30-Mar-20 5 pcs 6.00 0.24

19-Oct-19 21-Nov-19 1,012 pcs 0.20 33.73


5-Nov-19 21-Nov-19 8 lot 13.13 0.53
21-Mar-20 24-Mar-20 8 mtr 3.75 2.00

2-Nov-19 14-Nov-19 1,440 meter 0.05 120.00


30-Nov-19 11-Dec-19 1,311 meter 0.05 119.18

5-Dec-19 18-Dec-19 960 meter 0.08 80.00


19-Dec-19 1-Jan-20 986 meter 0.07 82.13

26-Nov-19 12-Dec-19 5,400 meter 0.02 360.00


14-Dec-19 26-Dec-19 7,322 meter 0.01 610.19
28-Dec-19 23-Jan-20 321 meter 0.20 13.38
25-Jan-20 11-Feb-20 1,180 meter 0.06 73.73
8-Feb-20 18-Feb-20 15,947 meter 0.00 1,594.7
19-Feb-20 24-Feb-20 900 meter 0.01 180.00
25-Feb-20 9-Mar-20 900 points 0.11 75.00

9-Dec-19 24-Dec-19 3,900 meter 0.01 278.57


14-Dec-19 24-Dec-19 1,306 meter 0.09 130.58
25-Dec-19 2-Jan-20 321 meter 0.30 40.13
4-Jan-20 22-Jan-20 4,500 meter 0.02 264.71
23-Jan-20 26-Jan-20 418 points 0.01 139.25

29-Dec-19 8-Jan-20 1,728 meter 0.07 172.80


15-Jan-20 23-Jan-20 10,980 meter 0.01 1,372.5
25-Jan-20 6-Feb-20 422 meter 0.19 35.19
8-Feb-20 26-Feb-20 10,980 meter 0.01 645.88
25-Feb-20 29-Feb-20 820 points 0.01 204.94

29-Dec-19 8-Jan-20 2,304 meter 0.05 230.40


9-Jan-20 18-Jan-20 2,550 points 0.04 318.75
11-Jan-20 23-Jan-20 422 meter 0.19 35.19
25-Jan-20 8-Feb-20 2,550 meter 0.04 196.15
9-Feb-20 12-Feb-20 66 meter 0.12 16.50

21-Dec-19 2-Jan-20 1,728 meter 0.05 144.00


24-Dec-19 6-Jan-20 342 meter 0.24 28.50
24-Dec-19 6-Jan-20 2,160 meter 0.04 180.00
31-Dec-19 13-Jan-20 2,160 meter 0.04 180.00
9-Feb-20 12-Feb-20 48 points 0.17 12.00

27-Nov-19 5-Dec-19 1,350 meter 0.11 168.75


3-Dec-19 11-Dec-19 1,038 meter 0.11 129.75
3-Dec-19 11-Dec-19 211 meter 0.23 26.34
12-Dec-19 25-Dec-19 13,500 meter 0.01 1,125.0
26-Dec-19 29-Dec-19 66 points 0.09 22.00

16-Nov-19 28-Nov-19 1,125 meter 0.05 93.75


12-Dec-19 25-Dec-19 339 meter 0.24 28.25
26-Dec-19 6-Jan-20 339 meter 0.35 33.90
7-Jan-20 11-Jan-20 293 points 0.03 73.13

2-Jan-20 15-Jan-20 1,125 meter 0.07 93.75


16-Jan-20 28-Jan-20 986 points 0.08 89.59
28-Jan-20 2-Feb-20 29 meter 0.27 7.31
19-Sep-19 2-Oct-19 98 meter 0.84 8.13
25-Sep-19 3-Oct-19 2,040 meter 0.05 255.00
25-Dec-19 8-Jan-20 385 meter 0.24 29.60
30-Dec-19 23-Jan-20 1,298 sq.m 0.11 58.98
22-Jan-20 28-Jan-20 80 mtr 2.09 13.38
25-Jan-20 4-Feb-20 2,440 lot 0.04 243.98
29-Jan-20 2-Feb-20 338 mtr 0.02 84.38
29-Jan-20 6-Feb-20 1,298 lot 0.07 162.19
5-Feb-20 8-Feb-20 2,440 pcs 0.00 813.25
9-Feb-20 23-Feb-20 375 pcs 0.42 28.85
24-Feb-20 22-Mar-20 77 pcs 0.72 3.19

19-Oct-19 31-Oct-19 18 pcs 8.00 1.50


2-Nov-19 19-Nov-19 1,350 mtr 0.05 84.38
20-Nov-19 3-Dec-19 1,140 pics 0.13 95.03
8-Feb-20 11-Feb-20 759 pont 0.01 189.75

25-Feb-20 7-Mar-20 711 points 0.13 71.10


25-Feb-20 9-Mar-20 23 points 0.80 1.88
20-Apr-20 5-May-20 900 points 0.03 64.29

15-Apr-20 30-Apr-20 418 points 0.22 29.86

22-Mar-20 1-Apr-20 820 points 0.16 82.00

13-Feb-20 24-Feb-20 14 points 8.84 1.43

13-Feb-20 24-Feb-20 66 points 1.64 6.60

13-Feb-20 1-Mar-20 29 points 4.42 1.90

25-Feb-20 30-Mar-20 48 pcs 1.38 1.60


25-Feb-20 7-Mar-20 293 pcs 0.29 29.25
2-Feb-20 13-Feb-20 29 pcs 1.03 2.93

18-Mar-20 30-Mar-20 375 pcs 0.09 34.09


31-Mar-20 11-Apr-20 4 pcs 8.00 0.38

12-Feb-20 23-Feb-20 759 pcs 0.03 75.90


24-Feb-20 25-Feb-20 6 pcs 2.00 3.00
25-Mar-20 16-Apr-20 6 pcs 9.00 0.30

26-Dec-19 6-Jan-20 1,200 mtr 0.05 120.00


9-Jan-20 22-Jan-20 1,093 mtr 0.07 91.04

28-Jan-20 9-Feb-20 800 meter 0.04 80.00


9-Feb-20 23-Feb-20 821 mtr 0.07 68.44

20-Feb-20 5-Mar-20 4,500 meter 0.03 375.00


24-Feb-20 14-Mar-20 6,102 meter 0.02 381.37
24-Feb-20 18-Mar-20 268 meter 0.45 13.38
18-Mar-20 11-Apr-20 983 meter 0.12 49.16
11-Apr-20 27-Apr-20 13,289 meter 0.01 949.24
27-Apr-20 11-May-20 750 meter 0.14 62.50
11-May-20 23-May-20 750 points 0.12 75.00

23-Jan-20 5-Feb-20 3,250 meter 0.05 270.83


29-Jan-20 11-Feb-20 1,088 meter 0.17 90.68
29-Jan-20 11-Feb-20 268 meter 0.40 22.29
12-Feb-20 29-Feb-20 3,750 meter 0.04 250.00
1-Mar-20 2-Mar-20 348 points 0.02 174.06
25-Jan-20 6-Feb-20 1,440 meter 0.10 120.00
5-Feb-20 22-Feb-20 9,150 meter 0.01 610.00
11-Feb-20 22-Feb-20 352 meter 0.26 35.19
23-Feb-20 11-Mar-20 9,150 meter 0.02 571.88
12-Mar-20 21-Mar-20 683 points 0.13 85.39

25-Jan-20 6-Feb-20 1,920 meter 0.08 160.00


30-Jan-20 8-Feb-20 2,125 meter 0.03 265.63
30-Jan-20 19-Feb-20 352 meter 0.60 19.55
20-Feb-20 2-Mar-20 2,125 meter 0.04 212.50
3-Mar-20 5-Mar-20 55 points 0.11 18.33

31-Dec-19 11-Jan-20 1,440 meter 0.08 144.00


4-Jan-20 12-Jan-20 285 meter 0.25 35.63
4-Jan-20 14-Jan-20 1,800 meter 0.05 180.00
15-Jan-20 30-Jan-20 1,800 meter 0.07 128.57
1-Feb-20 4-Feb-20 40 points 0.20 10.00

31-Dec-19 11-Jan-20 1,125 points 0.07 112.50


6-Jan-20 16-Jan-20 865 meter 0.09 86.50
9-Jan-20 22-Jan-20 176 meter 0.43 14.64
18-Jan-20 28-Jan-20 11,250 meter 0.01 1,125.0
29-Jan-20 1-Feb-20 55 meter 0.11 18.33

26-Dec-19 8-Jan-20 938 mtrs 0.08 78.13


9-Jan-20 20-Jan-20 283 mtrs 0.21 28.25
21-Jan-20 1-Feb-20 283 mtrs 0.11 28.25
2-Feb-20 5-Feb-20 244 points 0.03 60.94

2-Feb-20 16-Feb-20 938 mtr 0.08 78.13


16-Feb-20 1-Mar-20 821 mtr 0.01 68.44
1-Mar-20 3-Mar-20 24 points 0.16 12.19

25-Jan-20 16-Feb-20 77 pcs 1.95 3.85


17-Feb-20 8-Mar-20 55 pcs 1.75 3.06
3-Mar-20 8-Mar-20 321 pcs 0.01 64.13
23-Mar-20 5-Apr-20 20 mtr 6.00 1.67
23-Mar-20 7-Apr-20 281 mtr 0.21 20.09
25-Mar-20 9-Apr-20 2,033 mtr 0.03 145.22
28-Mar-20 13-Apr-20 1,700 mtr 0.05 113.33
14-Apr-20 20-Apr-20 2,033 pcs 0.02 338.85
14-Apr-20 18-Apr-20 67 sqm 0.06 16.72
21-Apr-20 11-May-20 313 pcs 0.17 17.36
28-Apr-20 11-May-20 1,081 pcs 0.07 90.10
12-May-20 18-May-20 2,033 pcs 0.02 338.85

25-Jan-20 9-Feb-20 15 pcs 8.00 1.07


29-Jan-20 20-Feb-20 1,125 pcs 0.11 56.25
22-Feb-20 1-Mar-20 950 mtr 0.05 118.78
2-Mar-20 5-Mar-20 633 mtr 0.08 158.13

7-Mar-20 26-Mar-20 593 points 0.10 32.92


23-May-20 3-Jun-20 19 points 3.20 1.88
25-May-20 3-Jun-20 750 panel 0.01 93.75

2-May-20 17-May-20 348 points 0.17 24.87

6-May-20 17-May-20 683 points 0.09 68.31

25-Feb-20 7-Mar-20 55 points 1.09 5.50

25-Feb-20 7-Mar-20 24 points 2.53 2.38

1-Mar-20 14-Mar-20 40 points 1.50 3.33

31-Mar-20 23-Apr-20 68 pcs 1.16 3.21


16-Apr-20 23-Apr-20 244 pcs 0.17 34.82

15-Apr-20 23-Apr-20 24 points 1.97 3.05


19-May-20 1-Jun-20 313 points 0.23 26.04
26-May-20 8-Jun-20 3 points 23.04 0.26

18-Apr-20 3-May-20 633 points 0.06 45.18


25-Apr-20 30-Apr-20 5 points 7.20 0.83
2-May-20 3-May-20 5 points 7.20 2.50

1-Mar-20 9-Mar-20 180 mtr 0.72 25.71


9-Mar-20 17-Mar-20 164 mtr 0.42 23.41

15-Jan-20 21-Jan-20 900 meter 0.09 150.00


22-Jan-20 4-Feb-20 54 meter 1.38 4.46
22-Jan-20 29-Jan-20 1,220 meter 0.06 174.34
1-Feb-20 3-Feb-20 197 meter 0.03 65.54
5-Feb-20 11-Feb-20 150 meter 0.49 25.00
5-Feb-20 12-Feb-20 2,658 points 0.03 379.70
12-Feb-20 16-Feb-20 150 points 0.49 37.50

15-Jan-20 21-Jan-20 650 mtr 0.17 108.33


22-Jan-20 26-Jan-20 218 mtr 0.29 54.41
22-Jan-20 28-Jan-20 54 mtr 1.87 8.92
27-Jan-20 30-Jan-20 750 mtr 0.02 187.50
1-Feb-20 2-Feb-20 70 points 0.06 34.81

15-Jan-20 19-Jan-20 288 mtr 0.33 72.00


20-Jan-20 26-Jan-20 1,830 mtr 0.04 305.00
20-Jan-20 22-Jan-20 70 mtr 0.94 23.46
27-Jan-20 1-Feb-20 1,830 mtr 0.06 366.00
2-Feb-20 4-Feb-20 137 points 0.48 45.54

7-Jan-20 11-Jan-20 188 mtr 0.48 46.88


12-Jan-20 15-Jan-20 57 points 0.14 14.13
23-Jan-20 28-Jan-20 57 mtr 2.39 11.30
29-Jan-20 3-Feb-20 49 mtr 1.23 9.75

1-Mar-20 8-Mar-20 188 meter 0.38 31.25


8-Mar-20 15-Mar-20 164 meter 0.13 27.38
14-Mar-20 18-Mar-20 5 points 1.23 1.22

9-Mar-20 19-Mar-20 340 mtr 0.35 34.00


21-Mar-20 5-Apr-20 1,300 mtr 0.02 92.86
21-Mar-20 26-Mar-20 64 mtr 0.25 10.69
21-Mar-20 2-Apr-20 216 mtr 0.11 18.02
19-May-20 3-Jun-20 407 mtr 0.14 29.04
19-May-20 1-Jun-20 216 pcs 0.11 18.02
19-May-20 30-May-20 216 points 0.25 21.63
2-Jun-20 3-Jun-20 13 mtr 0.22 6.69
4-Jun-20 8-Jun-20 56 points 0.11 14.06

25-May-20 3-Jun-20 150 points 0.13 18.75


3-Jun-20 9-Jun-20 119 points 0.08 23.70

1-Feb-20 6-Feb-20 70 points 0.17 11.60


8-Feb-20 18-Feb-20 1 lot 10.00 0.10
19-Feb-20 22-Feb-20 1 points 6.00 0.33

8-Mar-20 14-Mar-20 11 points 0.91 1.83

4-Feb-20 10-Feb-20 14 points 1.48 2.25


25-Apr-20 2-May-20 49 points 0.41 6.96
25-Apr-20 27-Apr-20 5 points 1.82 1.63

9-Jun-20 29-Jun-20 3 points 6.67 0.17


9-Jun-20 27-Jul-20
13-Sep-20 27-Sep-20 1 lot 261.88 0.07

13-Sep-20 27-Sep-20
13-Sep-20 27-Sep-20 1 lot 180.00 0.07

20-Sep-20 4-Oct-20 1 lot 138.75 0.07

27-Sep-20 6-Oct-20 1 lot 180.00 0.10

22-Sep-20 6-Oct-20 1 lot 180.00 0.07

30-Sep-20 12-Oct-20 1 lot 215.00 0.08

30-Sep-20 12-Oct-20 1 lot 180.00 0.08

30-Sep-20 12-Oct-20 1 lot 96.25 0.08

30-Sep-20 12-Oct-20 1 lot 70.00 0.08

1-Oct-20 15-Oct-20 1 lot 20.00 0.50

1008 Summary Weightage 1010 Summary


36524 15% ENG 13367
36524 15% PRO 13367
243493 88085
158270 65% CON 57229
243493 88085

12175 5% T&C 4122

1004 Summary Weightage 1006 Summary


20267 15% ENG 22367
20267 15% PRO 22367
137698 151972
90042 65% CON 99056
7122 5% T&C 8182

1007 Summary Weightage


22367 15%
22367 15%
149082
97564 65%
6784 5%
Average Daily At Completion
Cum Budgeted by duration into
Manpower Productivity into Labor daily
Labout Unit Manpower Units@8hrs Per- productivity to
Resource day match total
allocated Quantity

158270
2 720.00 160 3,600
12 1,168.80 960 974
2 1,831.40 160 9,157
3 15.48 254 59

0 0.18 384 1,920


4 582.67 384 1,748

4 640.00 256 1,280


19 2,098.75 1840 1,314

5 1,795.92 880 7,200


5 1,874.50 960 9,763
3 48.28 564 428
2 209.73 240 1,573
7 9,922.73 840 21,263
6 326.53 960 1,200
2 600.00 64 1,200

8 4,160.00 640 5,200


6 822.14 544 1,741
15 775.75 928 428
2 643.60 248 6,000
2 371.33 48 557

6 1,057.96 720 2,304


4 3,111.00 680 14,640
10 495.53 852 563
6 5,445.67 860 14,640
1 364.33 24 24

12 3,686.40 960 3,072


9 2,081.63 960 3,400
4 204.73 352 563
10 3,400.00 800 3,400
4 117.33 96 88

8 1,600.00 800 2,304


9 352.83 749 456
6 1,031.42 828 2,880
22 6,192.00 1720 2,880
1 12.00 24 64

23 4,050.00 1800 1,800


9 1,038.00 864 1,384
10 247.33 852 281
6 7,031.25 800 18,000
2 58.67 48 88

8 800.00 960 1,500


2 67.80 120 452
7 269.94 688 452
2 195.00 64 390

2 208.33 250 1,500


2 166.82 260 1,314
2 19.50 64 39
5 36.11 720 130
6 536.44 1420 2,720
20 1,026.00 1600 513
8 519.51 1624 1,730
26 921.39 620 107
2 1,626.50 64 3,253
6 158.82 816 450
5 582.55 528 1,730
2 1,626.50 64 3,253
6 214.29 672 500
3 14.43 652 102

6 9.60 720 24
6 900.00 576 1,800
5 376.96 960 1,520
2 506.00 64 1,012

7 337.73 1140 948


7 10.69 1140 30
4 240.00 640 1,200

2 53.47 480 557


6 0.60 480 1

3 267.67 384 1,093


8 25.33 384 19

3 52.80 120 88

3 22.80 120 38

4 17.07 480 64
4 21.60 640 108
2 18.72 960 390

6 15.92 640 39

3 172.50 276 500


1 0.34 240 5

7 230.51 1640 1,012


7 3.73 840 8
8 15.00 240 8

6 722.50 578 1,440 0


6 715.09 528 1,311 0

6 481.67 578 960


6 494.46 578 986

8 2,820.00 940 5,400


8 4,881.50 768 7,322
3 36.50 524 321
4 301.85 524 1,180
7 10,445.45 524 15,947
2 360.00 80 900
8 600.00 768 900

4 1,144.13 460 3,900


12 1,501.61 920 1,306
12 481.50 768 321
6 1,681.66 864 4,500
2 278.50 48 418

12 2,073.60 960 1,728


12 16,470.00 768 10,980
7 238.98 652 422
6 3,875.29 816 10,980
2 409.88 64 820

12 2,764.80 960 2,304


14 4,402.73 884 2,550
7 238.98 652 422
7 1,410.80 748 2,550
2 33.00 64 66

7 978.00 652 1,728


7 193.56 652 342
7 1,222.50 652 2,160
8 1,350.00 720 2,160
2 24.00 64 48

18 3,037.50 1152 1,350


14 1,792.17 884 1,038
6 158.06 384 211
9 10,125.00 864 13,500
2 44.00 48 66

5 449.22 460 1,125


7 191.86 652 339
12 406.80 960 339
2 146.25 64 293

7 636.72 652 1,125


7 663.79 652 986
2 14.63 64 29
7 55.18 652 98
12 3,060.00 768 2,040
7 212.86 748 385
6 372.63 1112 1,298
28 374.50 1344 80
9 2,110.38 692 2,440
2 168.75 64 338
12 1,946.25 768 1,298
3 2,168.67 64 2,440
12 346.15 1248 375
2 7.30 440 77

12 18.00 1152 18
4 353.32 536 1,350
12 1,140.30 1152 1,140
2 379.50 64 759

9 657.68 740 711


2 2.81 144 23
2 137.76 240 900

6 191.94 720 418

14 1,107.00 1080 820

13 17.96 1008 14

11 71.28 864 66

8 15.96 1008 29

2 3.52 528 48
8 244.24 668 293
3 8.78 240 29

3 102.27 264 375


3 1.13 240 4

2 182.16 192 759


6 18.00 96 6
3 0.81 432 6

6 720.00 480 1,200


6 546.25 576 1,093

3 240.00 240 800


5 342.19 480 821

10 3,750.00 960 4,500


8 2,860.25 960 6,102
6 80.25 960 268
6 294.94 960 983
9 8,136.35 960 13,289
9 562.50 864 750
9 675.00 720 750

13 3,385.42 1200 3,250


15 1,360.16 1440 1,088
9 200.63 864 268
9 2,250.00 1080 3,750
3 522.19 48 348
13 1,500.00 1200 1,440
9 5,490.00 1080 9,150
9 316.69 720 352
9 5,146.88 1152 9,150
11 960.64 720 683

13 2,000.00 1200 1,920


9 2,390.63 576 2,125
12 228.07 1680 352
9 1,912.50 720 2,125
2 36.67 48

11 1,555.20 864 1,440


9 320.63 576 285
9 1,620.00 720 1,800
9 1,157.14 1008 1,800
2 20.00 64 40

8 843.75 600 1,125


8 648.75 600 865
6 91.47 600 176
6 6,750.00 480 11,250
2 36.67 48 55

6 468.75 576 938


6 169.50 480 283
3 84.75 240 283
2 102.83 54 244

6 468.75 576 938


1 45.63 64 821
2 24.38 32 24

8 28.88 1200 77
5 16.30 768 55
1 51.30 32 321
10 16.67 960 20
4 86.10 480 281
4 560.15 432 2,033
6 680.00 720 1,700
6 2,033.13 288 2,033
1 16.72 32 67
3 52.08 432 313
6 540.63 576 1,081
6 2,033.13 288 2,033

9 9.18 960 15
6 337.50 960 1,125
6 712.69 384 950
12 1,897.50 384 633

3 109.72 480 593


6 11.25 480 19
1 93.75 64 750

4 106.57 480 348

6 409.88 480 683

6 33.00 480 55

6 14.25 480 24

5 16.67 480 40

4 11.94 624 68
6 208.93 336 244

6 18.28 384 24
6 156.25 576 313
6 1.56 576 3

3 116.17 288 633


6 5.00 288 5
18 45.00 288 5

19 477.55 1040 180


10 230.76 552 164

13 2,000.00 640 900


6 27.49 592 54
11 1,843.02 592 1,220
2 131.08 48 197
12 308.33 592 150
11 4,013.93 592 2,658
19 693.75 592 150

18 1,986.11 880 650


16 870.50 512 218
17 148.61 800 54
3 562.50 96 750
2 69.63 32 70

24 1,710.00 760 288


14 4,117.50 648 1,830
22 516.08 528 70
23 8,418.00 920 1,830
22 1,001.92 528 137

23 1,054.69 720 188


2 28.25 64 57
27 305.10 1080 57
12 117.00 480 49

12 369.79 568 188


4 95.81 168 164
2 1.83 48 5

12 408.00 960 340


2 159.18 192 1,300
3 28.28 127 64
2 36.04 192 216
4 121.88 470 407
2 36.04 192 216
5 117.05 433 216
2 10.03 24 13
2 21.09 48 56

3 46.88 160 150


2 47.40 80 119

2 23.21 96 70
1 0.10 80 1
2 0.67 48 1

2 3.06 80 11

3 7.50 160 14
3 19.90 160 49
3 4.81 71 5

1 0.19 160 3

17 1.16 2095 1

-
12 0.80 1440 1
-
9 0.62 1110 1

18 1.80 1440 1

12 0.80 1440 1

18 1.49 1720 1

15 1.25 1440 1

8 0.67 770 1

5 0.41 560 1

10 5.00 160 1

Weightage
15%
15%
65%
5%

Weightage
15%
15%
65%
5%

You might also like