You are on page 1of 2

BARLIZO, J. T .

HANDOUTS (PART II) The standard hardware used to operate a PMS is shown
in FIGURE 4.5 THE BASIC HARDWARE REQUIREMENTS
CHAPTER 4 : PROPERTY MANAGEMENT SYSTEM ARE ORAGNIZED AROUND THE POINT OF SCALE AND
CUSTOMER SERVICE AREAS. KEYBOARDS, MONITORS,
CHOOSING HARDWARE DISK DRIVES, AND PRINTERS CONSTITUTE THE USER
SETUP. THE DATA MANIPULATION AND STORAGE AREA
- Choose hardware based on its ability to handle the IS PART OF THE MAINFRAME, MINI COMPUTER, OR
software. PERSONAL COMPUTER.

Technology Factors to include the following working OTHERS PMS SELECTION CONSIDERATIONS
concepts; Other factors to consider in choosing a PMS vendor
claims, installation plans training backup power sources
Processor Speed. how fast a central processing unit and maintenance.
(CPU) makes calculations per second; expressed in VENDOR CLAIMS. HOW EASY IS IT TO OPERATE THIS
gigahertz (GHz). SYSTEM? HOW USEFUL ARE THE REPORTS YOU
Disk Drive. a place in the computer where data is OBTAIN? ANSWER SUCH AS “I DONT KNOW HOW THE
stored read; CD or DVD drive or key drive. PROPERTY MANAGE WITHOUT IT” OR IT IS DIFFICULT
Megabyte. 1024 kilobytes of formatted capacity. TO OPERATE AND THE REPORTS ARE AWKWARD”
Gigabyte. 1024 megabytes of formatted capacity. HARDWARE INSTALLION PLANS. A careful plan for
Access Time. The amount of time required for a hardware installation will help the management
processor to retrieve information from the hard drive. maintain both guest service and employee morale.
Internet. A network computer systems that share * FIRST IT IS KEY TO DETERMINE WHO WILL INSTALL
information over high speed electronic connections. WIRING OR CABLES.
Intranet. A computer network over which in house NEXT TO BE DETERMINED IS WHICH HARDWARE WILL
users timely operational information to conduct BE INSTALLED, WHAT TIME AND WHICH DEPARTMENT
business. WILL RECIEVE HARDWARENFIRST AND WHAT METHOD
I/O ports (input/output devices). keyboard, monitor, REQUIRED TO GET ALL DEPARTMENTS ONLINE.
modem, mouse, joystick,t pen, printer, and trackball. THIS INFORMATION SHOULD BE USED TO DEVELOP A
Monitor. A television screen with color or FLOWCHART, WHICH WILL HELP DEPARTMENTS ADAPT
monochrome capacity to view input and output data AND INTERACT USING ONLINE OPERATION
Keypad. a collection of numbers typewriter keys and
function keys that allow operator to enter numbers or COMPUTER TRAINING PROGRAMS. Training o by a
perform math functions in a computer. computer company ranges from classes held at the
Keyboard. a standard or Dvorack - type typewrite-style corporate headquarters to on-the-job training sessions
keypad that allows the operator to enter or retrive and informal consultant hotlines.
data. * THE STAFF OF THE DEPARTMENT WHO WILL USE THE
Printer. a computer hardware that produces images on COMPUTERS MUST BE THROUGHLY TRAINED IF THE
paper EQUIPMENT IS TO BE PUT TO ITS BEST USE.
Inkjet. a printer that produces small dots printed with EMPLOYEES NEED TIME TO PRACTICE USING
ink on paper. COMPUTER HARDWARE AND SOFTWARE.
Laser. a printer that produces photo images on paper THIS ALLOWS THEM TO MAKE MISTAKES IN PRIVATE
Letter - Quality. a better type of dot matrix print AND TO BECOME FAMILIAR WITH THE KEYBOARD
Single-sheet. a type of printer that uses single sheet- CONFIGURATION.
paper
Modem. Allows for transfer of data through telephone Power Sources. what happens if the power goes out?
lines; expressed in baud (information transfer) rates this concern about black outs (TOTAL LOST OF
CPS (characters per second) : meausre of the speed ELECTRICITY) as well as the possibility of brownouts
with whch individual characters are printed. (PARTIAL LOST OF ELECTRICITY).
Computer Supplies: paper, forms, and ink cartridges, - They used Battery-powered temporary energy units
needed to operate the system are used when power is lost or cut to ensure
Megaherstz (MHz). one million cycles per second; operational data are not lost.
indicates computer speed HOTEL managers who have experienced power losses
PPM (pages per minute) : printer speed capability are well versed in maintaining communication among
the departments and posting charges as required. once
THE FRONT OFFICE MANAGER MUST BE AWARE OF THE the power returns in full the staff can catch up on
OPERATIONAL CAPABILITIES OF PMS posting to the electronic folio.
MAINTENANCE AGREEMENT. Final consideration in
adopting PMS is the maintenance agreement. Which
should spell out the related costs of reppair and
replacement of hardware and software.
ALLOWANCE FOR EMERGENCY SERVICES AND TIMES
AVAILABLE FOR GENERAL SERVICE SHOULD ALSO BE
LISTED.
-LOANER AND BACK UP EQUIPMENT AVAILABILITY
ENHANCES THE ATTRACTIVENESS OF THE AGREEMENT. Reservation. the reservation in FIGURE 4.8 consisits of
subsystems that can recieve individual guest or group
FINANCIAL CONSIDERATIONS data.
Purchasing or leasing a PMS for hotel is a major,
financial decision. Sales of room nights, food and
beverages, and other products and services are
projected.
CONTROLLER. the one who prepares a budget in
consultation with general manger. Considered with
these projections are the related cost of producing
those goods and services
. -they are the one who usually aware of the specific
costs of each department- the amount of overtime pay
required at the end of the month to produce the The guest data are received through a personal phone
monthly inventory in the food and beverage call, through another computer in the referral system or
department . via internet. All the possible room types and locations,
The decision to purchase, lease, or connect to the room rates and special request can be matched with
internet must also be made. The outright cost of the existing room inventories. computerized
purchase, related fiance charges, discount for cash and reservation.
depreciation are only a few of the points to review if Revenue Management. Is a process of planning to
the hotel decides to purchase. achieve maximum rrom rates and the most profitable
- These considerations must be wieghed against guest (those guest who will spend money at the hotels
continuance of cash flow, application of lease, food beverages outlets, gift shopes etc. ), encourages
payments to purchase price, and tax advantage of front office managers, general managers and marketing
leasing. and sales director to target sales period and develop
Payback Period. time for the hotel to recoup purchase sales programs that will maximize profit for the hotel.
price, installation charges , financing fees and so forth
through cost savings and increased guest satisfaction
The above concerns of the controller include areas in
addition to front desk . Remember that that the
adoption of aPMS involves the management of all
guest services and accounting functions. The needs of
front desk alone, for a call accounting system or the
rental of reservation system
THE NEEDS OF ALL DEPARTMENTS CAN MAKE SUCH A
SYSTEM COST EFFECTIVE AND PROVIDE MORE
EFFICIENT GUEST SERVICES.
PMS APPLICATIONS
The property management system is organized around
the functions needed to deliver service to the guest.
THE SOFTWARE PROGRAM MAIN MENU LIST ARE ALL
AVAILABLE INDIVIDUAL PROGRAMS INCLUDED IN THE
SYSTEM.

IN FIGURE 4.7 ARE SMILIAR TO THOSE PREVIOUSLY


LISTED IN THIS CHAPTER. THE FRONT DESK CLERK CAN
ACCESS ANY OF THESE INDIVIDUALS PROGRAM BY
TYPING THR DESIGNATED KEYSTROKES OR BY
FOLLOWING DIRECTIONS ON THE TOUCH SCREEN.

You might also like