2 Grounding
1. Producing and gathering LCP/NAP inside, out and stenciling photos results
from DONE implemented site (1 port per NAP only);
3.1 LCP/NAP Photos 2. Redline, including; pole location, LCP/NAP location, fiber cable routing, etc. meter 10,000.00 2.00 1.60 20,000.00
and materials consolidation during and/or after implementation
6.1 Pole, Circular Concrete, 7.5m (not include pole supply) each 0 1,700.00 1,540.00 0.00
6.2 Pole, Circular Concrete, 9.0m (not include pole supply) each 170 1,700.00 1,540.00 289,000.00
6.3 Steel pole 6.0m (not include pole supply) each 0 2,500.00 2,500.00 0.00
Concrete Base
Splicing for the fiber core of closure inside the manhole and
handhole, including supply of protection sleeve.
9.3 Installation of 216 ODF and splicing Installation of 216 ODF and fiber termination core 0.00
9.4 Installation of 96 ODF and splicing Installation of 96 ODF and fiber termination core 0.00
Total Amount for Part 2 (Additional Services) 486,043.00
APPROVED BUDGET
Item Code Description Model/Part # Quantity UOM Date Required
Unit Price Total Price
Part 1 Main Services
1.4 Installation of 96/48 core aerial figure 8 optical fiber cable 0.00 meter 26.00 -
1,5 Installation of 216 core aerial figure 8 optical fiber cable 10,000.00 meter 33.00 330,000.00
2 Grounding 0 0 0.00 -
4 GUYING FIXTURES
6.1 Pole, Circular Concrete, 7.5m (not include pole supply) 0 each 1,700.00 -
6.2 Pole, Circular Concrete, 9.0m (not include pole supply) 170 each 1,700.00 289,000.00
6.3 Steel pole 6.0m (not include pole supply) 0 each 2,500.00 -
0 Pouring concrete base (including supply the Cement and gravel) 0 0 0.00 -
6.4 Concrete base for Pole, 7.5m (3 inch thick and 3 to 4 feet depth) ; 0 each 682.50 -
6.5 Concrete base for Pole, 9.0m (5 inch thick and 3 to 4 feet depth) ; 0 each 770.00 -
9 CO WORKS
848,002.50
Notes to End-user
Approved by: ERIC CHEN
Chief Operating Officer Date Returned to end-user
MS.SHI
Chief Finance Officer