External Structure of the OFB


5

1 2 3 4

PGND cable should not be longer than 15m. Cross sectional area should be 25mm2

(1) Heat exchanger (4) External grounding bar

(2) OFB housing (5) Mounting ear

(3) Foot

OFB HARDWARE INSTALLATION

Internal Structure of the OFB

(1) DC input wiring terminal (for heat exchanger) (3) Fiber coiler (5) Internal grounding bar (7) Guide rail

(2) Door control sensor (4) Cable holes (6) Mounting bar

(11/7/2007)

Huawei Technologies Co., Ltd

OFB HARDWARE INSTALLATION

Install OFB on the Wall

2 6 2 6

Position the Anchor point

Install the Expansion bolt

Mounting the ear

Install the OFB on the wall

Install OFB on the Metal Pole

66 8

Mounting the pole fixtures

Mounting the house on the metal pole

Important: When the OFB is installed with a sun shield , the space above the top of the OFB must be at least 80cm (Floor to OFB bottom) The Conduit pipe has to be at least 20 cm below the OFB bottom ( CPRI and RRU DC Cable)

(11/7/2007)

Huawei Technologies Co., Ltd

OFB HARDWARE INSTALLATION

1. UNPACKING THE OFB


The following photos show the accessories that come with the OFB s Box:

Fig. 1.1. OFB box from warehouse Warehouse

Fig. 1.2. OFB inside of box from

Fig. 1.3 . OFB box from warehouse

Fig. 1.4 . Material inside of OFB

(11/7/2007)

Huawei Technologies Co., Ltd

OFB HARDWARE INSTALLATION

Mounting Ear

Fig. 1.5. Material for OFB installation

Fig.1.6 .Material inside of OFB Mounting Ear Seal

Stainless Press Explode. Depend on the characteristics of the wall, we should replace this for another one that comes with the RRU

Fig. 1.7. Material for OFB installation

Fig. 1.8. Material for OFB installation

Fig. 1.9 Nuts for equipment installation

Fig. 1.10 Captive screw for equipment

(11/7/2007)

Huawei Technologies Co., Ltd

OFB HARDWARE INSTALLATION

Fig. 1.11. OFB rear view mounted

Fig. 1.12. OFB rear view ears

Fig. 1.13. DPD32-1-6

(11/7/2007)

Huawei Technologies Co., Ltd

OFB HARDWARE INSTALLATION

2.-INTERNAL INSPECTION

DC Power Cable for Heat Exchanger

PGND Bar
For this initial inspection we will check that the OFB does not have any damage , also if the whole cabinet comes with the internal cabling.

3. SPACE DISTRIBUTION OF THE OFB


The figure 3.1 shows the space assignation

(11/7/2007)

Huawei Technologies Co., Ltd

OFB HARDWARE INSTALLATION

1.- SPBC 2.- Free 3.- BBU Blank panel 5.- DPD Blank panel Blank panel Blank panel 6.-Space for others customer equipments.
9. Optional position for Breaker Rail

6.-Free for work space

Figure 3.1. OFB front view - Space assignation for internal equipment.

3.1. Installation of the Units inside the OFB according the space distribution of the OFB
The installation of the units in the OFB, proceed as follows:

First : Determine the position for installing the unit , for example the BBU3806 , as shown in the figure 3.2

Position for installing the BBU3806

RIEL GUIDE

Figure 3.2
(1) A space of 1U

(11/7/2007)

Huawei Technologies Co., Ltd

OFB HARDWARE INSTALLATION

Second: Remove the four screws M6 x 12 from the guide rails and placed them in the determined position, the riel guide will support the BBU 3806 Third :Push the BBU3806 gently into its position and fasten it with the screws M6 x 12.Figure 3.3 The rest of the units will follow the same steps for its installation .

RU for SPBC

RU for BBU RU for Exp BBU RU for DPD

Figure 3.3 OFB front view space assignation for internal equipment.
1.-FREEor SPBC 2.- BBUSPACE 3.- SECOND BBU SPACERESERVED

One 01 UR free or SPBC space. This space will be assigned for the first BBU. This space will be assigned for the second BBU and during the installation this space should be free. This space will be assigned for the DPD. For other customer equipment. This space will be free. This space will be placed by the breaker riel when Its is necessary .

4.- DPDSPACE 5.- CUSTOMER EQUIPMENT 6.-FREESPACE FOR O&M 9.FREE SPACEFORBREAKER RIEL

(11/7/2007)

Huawei Technologies Co., Ltd

10

OFB HARDWARE INSTALLATION

4. CONNECTION POINTS FOR -48VDC RRU AND BBU CABLES


This point shows where we will connect the RRU s power cables to the DPD32-1-6.
Power Heat Exchanger SW3 Power BBU Exp SW2 Power BBU1 SW1

Power RRU1 SW5

Power RRU0 SW4

Power RRU2 SW6

Fig. 4.1. Points connection for RRUs and BBU LOAD1 LOAD2 LOAD3 LOAD4 LOAD5 LOAD6 This will be used for BBU0 This will be used for BBU1 ( Expansion) This will be used for Heat Exchanger This will be used for RRU0 This will be used for RRU1 This will be used for RRU2

The fig. 4.1. and 4.2. shows the points connection for the LOADS and we will use them as follow::

(11/7/2007)

Huawei Technologies Co., Ltd

11

OFB HARDWARE INSTALLATION

Fig 4.2 Cabling of RRUs and BBUs.

5. CABLING AND INTERNAL LAYOUT


5.1. E1 cables and Optical fiber

The layout of both Cables is on the left side

Fig.5.1.1 Route for E1 cable and Optical Fiber. The figure 5.1 shows the route of the E1 cables and the Optical Fiber and the rule for this lay out is as follow: E1 cable: We will use the hole marked as Spare 1 to pass through the two E1 cables to the BBU 0.

(11/7/2007)

Huawei Technologies Co., Ltd

12

OFB HARDWARE INSTALLATION

Optical Fiber: We will use the hole marked as F.O. 3 to 5 to pass the 3 Optical fiber. The Optical fiber and the E1 cable will be installed on the left side of the BBU and I will be separated each other as the fig 5.1.1 shows.

5.2 . Transmission cables


For the E1s we will use the SPBC box as Lightning protection .The next figure shows the SPBC panel.

SPBC E1/T1 LIGHTNING PROTECTION BOX FRONT VIEW. SPBC E1/T1 LIGHTNING PROTECTION BOX

SPBC E1/T1 CROSS CONNECTIONS POINTS SPBC E1/T1 INSIDE OF APM100

Fig 5.2 .1SPBC E1/T1 Lightning Protection Box.

The use of the SPBC is recommended when the distance between the BBU and the Transmission equipment is more than 5m. as the fig 5.2.2 shows.

(11/7/2007)

Huawei Technologies Co., Ltd

13

OFB HARDWARE INSTALLATION

OFB outdoor cabinet

SMB
BBU3806

coaxial conne

SMB coaxial connector

E1 Lightning Protection Box 04046800:SFYZ75-1-1 E1 cable

RX to RX TX to TX

RX to RX TX to TX

E1 cable 10m

TRANNS. EQUIP.

E1 cable

Outdoor cable length more than 5m

FIU-FXC-ALCATELSIEMENS

Fig 5.2.2 SPBC E1/T1 Lightning Protection Box. The fig 5.2.3 shows the connection and lay out of the E1s cable inside of OFB.

Fig 5.2.3 SPBC E1/T1 Lightning Protection Box. Distance :A-B.1.5 m

Labeling of the Transmission Cable


See: Annex 1_E1 labeling

(11/7/2007)

Huawei Technologies Co., Ltd

14

OFB HARDWARE INSTALLATION

5.3. BBU Alarm Cable and BBU power cable.


Fig 5.3 shows the cablingroute for BBU -48VDC and the Alarm cable.

NOTE: We should use nylon cables tie in order to tie the cables to the riel

Alarm Cable

Fig.5.3. 1Route for BBU -48VDC and Alarm cable. The two cables will be route by the right side as the fig. 5.2.1 and 5.3 .1 show, but separated each one. BBU Alarm Cable

BBU Power Cable

Both Cables Separately bound

Figure 5.3.2

(11/7/2007)

Huawei Technologies Co., Ltd

15

OFB HARDWARE INSTALLATION

BBU Alarm cable

Grounding cable

Power Cable

Fig.5.3. 3Route for BBU -48VDC and Alarm cable.

5.4. -48VDC RRU CABLES AND GROUND CABLES


The Fig. 5.4.1 Show s theroute for RRU -48VDC and Grounding cables

. Fig.5.4.1 Route for RRU -48VDC and Ground cables.

(11/7/2007)

Huawei Technologies Co., Ltd

16

OFB HARDWARE INSTALLATION

For the RRU -48 VDC cables we will use the hole marked as DC LOAD 0 and we will use a 1 adaptor for 1 pipe. The cables will be routed from the back to the front using the right side as the fig. 5.4 shows.

For the Grounding Bar the holes distribution will be as the following :

PGND OF RRU1 PGND OF RRU2

PGND OF BBU0 PGND OF SPBC

PGND OF RRU0

PGND OF DPD

PGND OF HEAT EX.

PGND for the Heat Exchang er

PGND of the RRUs PGND of the DPD PGND of the BBU

Fig. 5.9Physical distribution of grounding bar holes.

5.5 . -48VDC INPUT CABLES

(11/7/2007)

Huawei Technologies Co., Ltd

17

OFB HARDWARE INSTALLATION

Fig. 5.5.1 Route for -48VDCINPUTCables. The -48VDC INPUT cables will be routed by the left side and we will use the hole marked as DC IN 0. To do that we will use a 1 terminator for 1 flexible pipe. As the fig 5.5.1 shows. Note: We can use the cable BLACK and BLUE cable from china if the distance between the OFB and the POWER SOURCE equipment is less than 18 m.

5.6. . ALARM CABLES


The alarm cable or the BBU is an RJ45 connector which has three cable pairs, and each pair is connected as the pictures show. .

(11/7/2007)

Huawei Technologies Co., Ltd

18

OFB HARDWARE INSTALLATION

Fig.5.6.1. Alarm cable for DPD.

Fig. 5.6.2 Alarm cable for door

Fig 5.6.3.Alarm cable for Heath exchanger

Fig 5.6.4 Structure of OFB alarm connector After the commissioning all the alarms should be tested one by one .

(11/7/2007)

Huawei Technologies Co., Ltd

19

OFB HARDWARE INSTALLATION

6. USED HOLES OF THE OFB

Fig. 6.1 Used holes ofOFB. SPARE 0 : We will use a 1 terminator and 1 flexible pipe to pass the -48VDC Cables. SPARE 1 : We will use a 1 terminator and 1 flexible pipe to pass the E1 Cable.

Fig 6.2. Connection to 1 pipe A: Connector -tube pipe-connector -adapter to 1 B: Adapter to 1

DC LOAD 1 to 3: We will use a 1terminator and 1 flexible pipe to pass 3 -48VDC RRU cables.
NOTE: IN SOME CASES IT COULD BE CHANGED ACCORDING TO RRUS LOCATION.

F.O.3 to 5 : We will use a 1 terminator and 1 flexible pipe to pass the 3 Optical Fiber. NOTE: IN SOME CASES IT COULD BE CHANGED ACCORDING TO THE RRUS LOCATION.

7. INSTALLATION SCENARIOS

(11/7/2007)

Huawei Technologies Co., Ltd

20

OFB HARDWARE INSTALLATION

OFB ON THE WALL


When the OFB need to be installed on the wall, we will consider the following

-RRUS in the same position:

RRU

RRU

RRU

On tower

Ladder

OFB

Wall

CPRI RRU DC RRU DC OFB DC E1

Fig. 7.1 RRUs installed in the same tower. . With this scenario the RRUs are in the same tower or in the same pole and we can run 3-48vdc cables inside of 2 pipes 1 and the 3 fiber cables inside of a pipe 1: We will use the distribution if the RRU are located in different positions .

-RRUS Distributed in different position:

(11/7/2007)

Huawei Technologies Co., Ltd

21

OFB HARDWARE INSTALLATION

RRU ON TOWER

E1 S

-48VDC INPUT

OFB

Horizontal ladder

SPACE ASSIGNED FOR FUTURE APPLICATION

WALL
RRU ON POLE

F.O

-48VDC RRU ON THE WALL

1 PIPES

Fig. 7.2 RRUs installed in different position. The figure 7.2 show the installation way when the RRUs are installed in different position. We will use the boxes to distribute the optical and the power cables from the OFB to the RRU, and inside the boxes we can run the cables to different directions as the fig 7.3 shows.

OFB

To two RRUs To One RRUs

PIPES

Fig.7.3 Internal cable distribution

OFB ON POLE
The fig. 7.4 shows the OFB mounted on pole .

(11/7/2007)

Huawei Technologies Co., Ltd

22

OFB HARDWARE INSTALLATION

Fig.7.4 Pipes of OFB. The Fig. 7.4 show that the pipes are mixed and to fix that we should use and additional metallic ladder as the fig 7.5 shows

POLE

OFB

F.O
ESPACIO PARA FUTURA TUBERIA DE FIBRA

DC
ESPACIO PARA FUTURA TUBERIA DE DC

Is necessary to use an additional metallic ladder to fix the pipes and boxes

Fig. 7.5 OFB mounted on pole

(11/7/2007)

Huawei Technologies Co., Ltd

23

OFB HARDWARE INSTALLATION

8. PICTURES OF OFB INSTALLATION

E1 and OFB DC connection

Fig. 8.2 OFB and RRU mounted on the wall

(11/7/2007)

Huawei Technologies Co., Ltd

24

OFB HARDWARE INSTALLATION

Fig. 8.3 OFB Installing the power and E1 cables

Fig. 8.4 Ground for OFB

Fig 8.5 Optical Fiber excess in the OFB

(11/7/2007)

Huawei Technologies Co., Ltd

25

OFB HARDWARE INSTALLATION

Annexes Annex 1. E1 labeling Annex 2. RRU power cable in ODF Annex 3. Cabling position

(11/7/2007)

Huawei Technologies Co., Ltd

26

Annex1. E1 Labeling

E1 Labeling
BBU 0 SPBC - RX1 SPBC - TX0 IU1-1 - RX1 SPBC - RX0 IU1-1 - TX1

OFB

CUSTOMER EQUIPMENT
SPBC - RX0 IU1-1 - TX1 SPBC - RX0 IU1-1 - TX1
1 2 3 4

BBU 0 SPBC - RX0 BBU 0 SPBC - TX0

SPBC

GSM CABINET

BBU SPBC - RX0 IU1-1 - TX1


1 2 3 4 5 6 7 8 9 10 11 12 13 # 15 16

5 6 7 8 . . . . OTHER CABINET

SPBC - RX0 IU1-1 - TX1

IU X-Y
IU: Transmission Indoor unit X: Transmission Rack unit 1 to 4 GSM cabinet 5 to Z -Another cabinet (Eltek,SSU,RACK) Y: Port number

Huawei Technologies Co.,Ltd. Confidential

10/31/2007

Page 1

Annex 2. RRU power cable in ODF

Preparing the Power Cable of RRU

Step 2 Step 1

Step 3

Step 4

Page 1

10/31/2007

Step 5

Step 6

Step 7

Step 8

Page 2

10/31/2007

Annex 3. Cabling position ( 7-11-07) BACK BTS GSM NOT AVAILABLE SECTOR 3 SECTOR 2 TRANSMISION HUAWEI

SECTOR 1

RX

TX

RX

TX

RX

TX

ALARMAS ALAR NOT AVAILABLE DC - 1 NOT AVAILABLE

MW

TRANSMISION NOT AVAILABLE ATERRAMIENTO NOT AVAILABLE

GN

Position asigned by Claro LATERAL EDGE ELTEK RECTIFIER

AC

FO

E1

DC

DC CABLE RRU/OFB

FIBER CABLE RRU

TRASMISION E1

AC

FO

DC

DC OFB EXTRATALK II RECTIFIER ( Alternative I)

FO

E1

DC

DC Cable /DC OFB FIBER CABLE RRU

NOT AVAILABLE E1

EXTRATALK II RECTIFIER (Alternative II)

FO

FO

DC

DC CABLE RRU/DC OFB

NOT AVAILABLE FIBER CABLE RRU / E1 EXTRATALK II RECTIFIER (Alternative III)

FO

DC

DC

NOT AVAILABE DC CABLE RRU/E1

NOT AVAILABLE DC CABLE RRU/OFB