1 2 3 4
PGND cable should not be longer than 15m. Cross sectional area should be 25mm2
(3) Foot
(1) DC input wiring terminal (for heat exchanger) (3) Fiber coiler (5) Internal grounding bar (7) Guide rail
(2) Door control sensor (4) Cable holes (6) Mounting bar
(11/7/2007)
2 6 2 6
66 8
Important: When the OFB is installed with a sun shield , the space above the top of the OFB must be at least 80cm (Floor to OFB bottom) The Conduit pipe has to be at least 20 cm below the OFB bottom ( CPRI and RRU DC Cable)
(11/7/2007)
(11/7/2007)
Mounting Ear
Stainless Press Explode. Depend on the characteristics of the wall, we should replace this for another one that comes with the RRU
(11/7/2007)
(11/7/2007)
2.-INTERNAL INSPECTION
PGND Bar
For this initial inspection we will check that the OFB does not have any damage , also if the whole cabinet comes with the internal cabling.
(11/7/2007)
1.- SPBC 2.- Free 3.- BBU Blank panel 5.- DPD Blank panel Blank panel Blank panel 6.-Space for others customer equipments.
9. Optional position for Breaker Rail
Figure 3.1. OFB front view - Space assignation for internal equipment.
3.1. Installation of the Units inside the OFB according the space distribution of the OFB
The installation of the units in the OFB, proceed as follows:
First : Determine the position for installing the unit , for example the BBU3806 , as shown in the figure 3.2
RIEL GUIDE
Figure 3.2
(1) A space of 1U
(11/7/2007)
Second: Remove the four screws M6 x 12 from the guide rails and placed them in the determined position, the riel guide will support the BBU 3806 Third :Push the BBU3806 gently into its position and fasten it with the screws M6 x 12.Figure 3.3 The rest of the units will follow the same steps for its installation .
RU for SPBC
Figure 3.3 OFB front view space assignation for internal equipment.
1.-FREEor SPBC 2.- BBUSPACE 3.- SECOND BBU SPACERESERVED
One 01 UR free or SPBC space. This space will be assigned for the first BBU. This space will be assigned for the second BBU and during the installation this space should be free. This space will be assigned for the DPD. For other customer equipment. This space will be free. This space will be placed by the breaker riel when Its is necessary .
4.- DPDSPACE 5.- CUSTOMER EQUIPMENT 6.-FREESPACE FOR O&M 9.FREE SPACEFORBREAKER RIEL
(11/7/2007)
10
Fig. 4.1. Points connection for RRUs and BBU LOAD1 LOAD2 LOAD3 LOAD4 LOAD5 LOAD6 This will be used for BBU0 This will be used for BBU1 ( Expansion) This will be used for Heat Exchanger This will be used for RRU0 This will be used for RRU1 This will be used for RRU2
The fig. 4.1. and 4.2. shows the points connection for the LOADS and we will use them as follow::
(11/7/2007)
11
Fig.5.1.1 Route for E1 cable and Optical Fiber. The figure 5.1 shows the route of the E1 cables and the Optical Fiber and the rule for this lay out is as follow: E1 cable: We will use the hole marked as Spare 1 to pass through the two E1 cables to the BBU 0.
(11/7/2007)
12
Optical Fiber: We will use the hole marked as F.O. 3 to 5 to pass the 3 Optical fiber. The Optical fiber and the E1 cable will be installed on the left side of the BBU and I will be separated each other as the fig 5.1.1 shows.
SPBC E1/T1 LIGHTNING PROTECTION BOX FRONT VIEW. SPBC E1/T1 LIGHTNING PROTECTION BOX
The use of the SPBC is recommended when the distance between the BBU and the Transmission equipment is more than 5m. as the fig 5.2.2 shows.
(11/7/2007)
13
SMB
BBU3806
coaxial conne
RX to RX TX to TX
RX to RX TX to TX
E1 cable 10m
TRANNS. EQUIP.
E1 cable
FIU-FXC-ALCATELSIEMENS
Fig 5.2.2 SPBC E1/T1 Lightning Protection Box. The fig 5.2.3 shows the connection and lay out of the E1s cable inside of OFB.
(11/7/2007)
14
NOTE: We should use nylon cables tie in order to tie the cables to the riel
Alarm Cable
Fig.5.3. 1Route for BBU -48VDC and Alarm cable. The two cables will be route by the right side as the fig. 5.2.1 and 5.3 .1 show, but separated each one. BBU Alarm Cable
Figure 5.3.2
(11/7/2007)
15
Grounding cable
Power Cable
(11/7/2007)
16
For the RRU -48 VDC cables we will use the hole marked as DC LOAD 0 and we will use a 1 adaptor for 1 pipe. The cables will be routed from the back to the front using the right side as the fig. 5.4 shows.
For the Grounding Bar the holes distribution will be as the following :
PGND OF RRU0
PGND OF DPD
(11/7/2007)
17
Fig. 5.5.1 Route for -48VDCINPUTCables. The -48VDC INPUT cables will be routed by the left side and we will use the hole marked as DC IN 0. To do that we will use a 1 terminator for 1 flexible pipe. As the fig 5.5.1 shows. Note: We can use the cable BLACK and BLUE cable from china if the distance between the OFB and the POWER SOURCE equipment is less than 18 m.
(11/7/2007)
18
Fig 5.6.4 Structure of OFB alarm connector After the commissioning all the alarms should be tested one by one .
(11/7/2007)
19
Fig. 6.1 Used holes ofOFB. SPARE 0 : We will use a 1 terminator and 1 flexible pipe to pass the -48VDC Cables. SPARE 1 : We will use a 1 terminator and 1 flexible pipe to pass the E1 Cable.
DC LOAD 1 to 3: We will use a 1terminator and 1 flexible pipe to pass 3 -48VDC RRU cables.
NOTE: IN SOME CASES IT COULD BE CHANGED ACCORDING TO RRUS LOCATION.
F.O.3 to 5 : We will use a 1 terminator and 1 flexible pipe to pass the 3 Optical Fiber. NOTE: IN SOME CASES IT COULD BE CHANGED ACCORDING TO THE RRUS LOCATION.
7. INSTALLATION SCENARIOS
(11/7/2007)
20
RRU
RRU
RRU
On tower
Ladder
OFB
Wall
Fig. 7.1 RRUs installed in the same tower. . With this scenario the RRUs are in the same tower or in the same pole and we can run 3-48vdc cables inside of 2 pipes 1 and the 3 fiber cables inside of a pipe 1: We will use the distribution if the RRU are located in different positions .
(11/7/2007)
21
RRU ON TOWER
E1 S
-48VDC INPUT
OFB
Horizontal ladder
WALL
RRU ON POLE
F.O
1 PIPES
Fig. 7.2 RRUs installed in different position. The figure 7.2 show the installation way when the RRUs are installed in different position. We will use the boxes to distribute the optical and the power cables from the OFB to the RRU, and inside the boxes we can run the cables to different directions as the fig 7.3 shows.
OFB
PIPES
OFB ON POLE
The fig. 7.4 shows the OFB mounted on pole .
(11/7/2007)
22
Fig.7.4 Pipes of OFB. The Fig. 7.4 show that the pipes are mixed and to fix that we should use and additional metallic ladder as the fig 7.5 shows
POLE
OFB
F.O
ESPACIO PARA FUTURA TUBERIA DE FIBRA
DC
ESPACIO PARA FUTURA TUBERIA DE DC
Is necessary to use an additional metallic ladder to fix the pipes and boxes
(11/7/2007)
23
(11/7/2007)
24
(11/7/2007)
25
Annexes Annex 1. E1 labeling Annex 2. RRU power cable in ODF Annex 3. Cabling position
(11/7/2007)
26
Annex1. E1 Labeling
E1 Labeling
BBU 0 SPBC - RX1 SPBC - TX0 IU1-1 - RX1 SPBC - RX0 IU1-1 - TX1
OFB
CUSTOMER EQUIPMENT
SPBC - RX0 IU1-1 - TX1 SPBC - RX0 IU1-1 - TX1
1 2 3 4
SPBC
GSM CABINET
5 6 7 8 . . . . OTHER CABINET
IU X-Y
IU: Transmission Indoor unit X: Transmission Rack unit 1 to 4 GSM cabinet 5 to Z -Another cabinet (Eltek,SSU,RACK) Y: Port number
10/31/2007
Page 1
Step 2 Step 1
Step 3
Step 4
Page 1
10/31/2007
Step 5
Step 6
Step 7
Step 8
Page 2
10/31/2007
Annex 3. Cabling position ( 7-11-07) BACK BTS GSM NOT AVAILABLE SECTOR 3 SECTOR 2 TRANSMISION HUAWEI
SECTOR 1
RX
TX
RX
TX
RX
TX
MW
GN
AC
FO
E1
DC
DC CABLE RRU/OFB
TRASMISION E1
AC
FO
DC
FO
E1
DC
NOT AVAILABLE E1
FO
FO
DC
FO
DC
DC