BOQ FOR INSTALLATION OF OPTICAL MATERIALS, GROUNDING AND ADDITIONAL WORKS

LA CASTELLANA TO TALISAY CLS BACKBONEBATCH 3


S/N Item Description Unit Qty New Price Old Price Total Amount
Part 1 Main Services
1 Installation of Optical Materials
1. Fix the LCP box on the pole with fix set;
2. Core splicing and testing
3. Install Aerial Support On Pole, install J-hook 2 pcs, Bridle Ring 5 pcs,
1.1 Installation of LCP box & 9 core splicing stainless steel strap 3 meters , Buckle 3 pcs; each 0 3,200.00 2,922.50 0.00
4. Stenciling of LCP (including provide the spray paint).

1. Fix the NAP box on the pole with fix set;


2. Core splicing and testing
1.2 Installation of NAP box & 2 core splicing 3. Install Arieal Support On Pole, install J-hook 2 pcs, Bridle Ring 5 pcs, each 0 1,900.00 1,645.00 0.00
stainless steel strap 3 meters , Buckle 3 pcs;
4. Stenciling of NAP (including provide the spray paint).

1. Fix the NAP box on the pole with fix set;


2. Core splicing and testing
1.3 Installation of NAP box & 3 core splicing 3. Install Arieal Support On Pole, install J-hook 2 pcs, Bridle Ring 5 pcs, each 0 2,300.00 2,300.00 0.00
stainless steel strap 3 meters , Buckle 3 pcs;
4. Stenciling of NAP (including provide the spray paint).

1. Put the 96/48 core aerial figure 8 optical fiber cable;


2. Fix the fiber cable with aerial hardware such as Pole clamp and Suspension
1.4 Installation of 96/48 core aerial figure 8 optical fiber cable Clamp or Guy Grip; meter 0.00 26.00 23.80 0.00
3. Loop the fiber cable in cable holder for POI;
4. Lead the fiber cable in LCP/NAP box.

1. Put the 216 core aerial figure 8 optical fiber cable;


2. Fix the fiber cable with aerial hardware such as Pole clamp and Suspension
1.5 Installation of 216 core aerial figure 8 optical fiber cable Clamp or Guy Grip; meter 10,000.00 33.00 33.00 330,000.00
3. Loop the fiber cable in cable holder for POI;
4. Lead the fiber cable in LCP/NAP box.

2 Grounding

1. Install stainless steel strap;


2. Install Joint clamp;
2.1 Grounding 3. Install messenger wire; each 34 351.75 351.75 11,959.50
4. Producing ground testing data results and photos

3 Gathering Data Results Photos

1. Producing and gathering LCP/NAP inside, out and stenciling photos results
from DONE implemented site (1 port per NAP only);
3.1 LCP/NAP Photos 2. Redline, including; pole location, LCP/NAP location, fiber cable routing, etc. meter 10,000.00 2.00 1.60 20,000.00
and materials consolidation during and/or after implementation

Total Amount for Part 1 (Main Services) 361,959.50

Part 2 Additional Services


4 GUYING FIXTURES

Installation of messenger wire, includes fixtures, guy grips, guy


grip spacers, strain insulators, suspension clamps, pole clamps,
nut thimble eyes, washers, guy protectors, bolts & nuts and
other necessary hardwares and tensioning. Installation of
anchor rod, concrete block, washer and nuts, fixtures, machine
bolts, includes breaking and restoration of pavement,
excavation, safety requirements, backfill compaction, hauling &
disposal of surplus soil.

4.1 Down Guy, 5/16"(6M) each 0 860.00 860.00 0.00


4.2 Side Walk Guy, 3/8"(10M) each 0 1,025.00 1,015.00 0.00
5 SUSPENSION HARDWARES

Installation Arm with accessories

5.1 26" Extension Arm each 0 430.00 420.00 0.00


5.2 44.5" Extension Arm each 0 465.00 455.00 0.00

5.3 10 Pin Arm each 0 1,250.00 1,225.00 0.00


6 POLES AND ACCESSORIES

Installation aluminum pole tag 1 pc, includes excavation, pole


setting, backfill and compaction, haulage & disposal of surplus
soil, breaking & restoration of pavement, concrete base as may
be necessary.

6.1 Pole, Circular Concrete, 7.5m (not include pole supply) each 0 1,700.00 1,540.00 0.00

6.2 Pole, Circular Concrete, 9.0m (not include pole supply) each 170 1,700.00 1,540.00 289,000.00

6.3 Steel pole 6.0m (not include pole supply) each 0 2,500.00 2,500.00 0.00

Concrete Base

Pouring concrete base (including supply the Cement and gravel)

Concrete base for Pole, 7.5m (3 inch thick and 3 to 4 feet


6.4 depth) ; Service Price including accessories each 0 682.50 682.50 0.00

Concrete base for Pole, 9.0m (5 inch thick and 3 to 4 feet


6.5 Service Price including accessories each 0 770.00 770.00 0.00
depth) ;

7 FOC CABLE ENCLOSURE

Installation of aerial closures, splice trays, organizers, cable


spacers, stainless straps and buckles, sealants, supports, cable ID
marker, and other accessories

7.1 UG FOC Closure each 0 820.00 820.00 0.00


7.2 Aerial FOC Closure each 3 665.00 665.00 1,995.00
8 FIBER SPLICING

Splicing for the fiber core of closure inside the manhole and
handhole, including supply of protection sleeve.

8.1 Fiber Splicing /fiber 648 301.00 301.00 195,048.00


9 CO WORKS
Supply and installation of HDPE from Riser pole going to manhole and
9.1 Supply and installation of 50mm HDPE meters 0.00
manhole going to Equipment room
Installation of Microduct from Riser pole going to manhole and manhole
9.2 Installation of 7way microduct going to Equipment room meters 0.00

9.3 Installation of 216 ODF and splicing Installation of 216 ODF and fiber termination core 0.00
9.4 Installation of 96 ODF and splicing Installation of 96 ODF and fiber termination core 0.00
Total Amount for Part 2 (Additional Services) 486,043.00

Grand Total Amount (VAT Excluded) ₱848,002.50


LEO TECHNOLOGIES & INFRASTRUCTURE CORPORATION PURCHASE REQUISITION
Unit 1501, 26th St. cor. 9th Ave. Bonifacio Global City, Taguig City
Telephone No. +63 2 413 1156 PR CONTROL NO: 4308
530-CONVERGE
PROJECT NAME:
2153A106138-08
PROJECT CODE:

Requested by : TAO TAO

Contact Number : 09287421436 Date:

Department / Division : Implementation / Converge Project Delivery Location:

APPROVED BUDGET
Item Code Description Model/Part # Quantity UOM Date Required
Unit Price Total Price
Part 1 Main Services

1 Installation of Optical Materials

1.1 Installation of LCP box & 9 core splicing 0 each 3,200.00 -

1.2 Installation of NAP box & 2 core splicing 0 each 1,900.00 -

1.3 Installation of NAP box & 3 core splicing 0 each 2,300.00 -

1.4 Installation of 96/48 core aerial figure 8 optical fiber cable 0.00 meter 26.00 -

1,5 Installation of 216 core aerial figure 8 optical fiber cable 10,000.00 meter 33.00 330,000.00

2 Grounding 0 0 0.00 -

2.1 Grounding 34 each 351.75 11,959.50

3 Gathering Data Results Photos 0 0 0.00 -

3.1 LCP/NAP Photos 10000 meter 2.00 20,000.00

Total Amount for Part 1 (Main Services) 0 0 361,959.50

Part 2 Additional Services

4 GUYING FIXTURES

Installation of messenger wire, includes fixtures, guy grips, guy grip


spacers, strain insulators, suspension clamps, pole clamps, nut thimble
eyes, washers, guy protectors, bolts & nuts and other necessary
0 hardwares and tensioning. Installation of anchor rod, concrete block,
washer and nuts, fixtures, machine bolts, includes breaking and
restoration of pavement, excavation, safety requirements, backfill
compaction, hauling & disposal of surplus soil.

4.1 Down Guy, 5/16"(6M) 0 each 860.00 -

4.2 Side Walk Guy, 3/8"(10M) 0 each 1,025.00 -

5 SUSPENSION HARDWARES 0 0 0.00 -

0 Installation Arm with accessories 0 0 0.00 -

5.1 26" Extension Arm 0 each 430.00 -

5.2 44.5" Extension Arm 0 each 465.00 -

5.3 10 Pin Arm 0 each 1,250.00 -

6 POLES AND ACCESSORIES 0 0 0.00 -

Installation aluminum pole tag 1 pc, includes excavation, pole setting,


0 backfill and compaction, haulage & disposal of surplus soil, breaking 0 0 0.00 -
& restoration of pavement, concrete base as may be necessary.

6.1 Pole, Circular Concrete, 7.5m (not include pole supply) 0 each 1,700.00 -

6.2 Pole, Circular Concrete, 9.0m (not include pole supply) 170 each 1,700.00 289,000.00

6.3 Steel pole 6.0m (not include pole supply) 0 each 2,500.00 -

0 Concrete Base 0 0 0.00 -

0 Pouring concrete base (including supply the Cement and gravel) 0 0 0.00 -

6.4 Concrete base for Pole, 7.5m (3 inch thick and 3 to 4 feet depth) ; 0 each 682.50 -

6.5 Concrete base for Pole, 9.0m (5 inch thick and 3 to 4 feet depth) ; 0 each 770.00 -

7 FOC CABLE ENCLOSURE 0 0 0.00 -


Installation of aerial closures, splice trays, organizers, cable spacers,
0 stainless straps and buckles, sealants, supports, cable ID marker, and 0 0 0.00 -
other accessories

7.1 UG FOC Closure 0 each 820.00 -

7.2 Aerial FOC Closure 3 each 665.00 1,995.00

8 FIBER SPLICING 0 0 0.00 -


Splicing for the fiber core of closure inside the manhole and handhole,
0 including supply of protection sleeve. 0 0 0.00 -

8.1 Fiber Splicing 648 /fiber 301.00 195,048.00

9 CO WORKS

9.1 Supply and installation of 50mm HDPE 0 meters 0.00


9.2 Installation of 7way microduct 0 meters 0.00
9.3 Installation of 216 ODF and splicing 0 core 0.00
9.4 Installation of 96 ODF and splicing 0 core 0.00

Total Amount for Part 2 (Additional Services) 486,043.00

848,002.50

Remarks: Total Amount: ₱848,002.50


VAT (12%) ₱101,760.30

Total Amount: (PHP) ₱949,762.80


I certify that the items requested above are necessary and will be used solely for the purposes stated.
Attached are the necessary supporting documents. PROCUREMENT USE ONLY
Received by and date:
Requisitioner : TAO TAO COMPLETE FOR RETURN

Notes to End-user
Approved by: ERIC CHEN
Chief Operating Officer Date Returned to end-user

MS.SHI
Chief Finance Officer

Note: Incomplete PR will not be processed.

You might also like