Republic of the Philippines

Department of Education
REGION XII
DIVISION OF SULTAN KUDARAT
MAGANAO ELEMENTARY SCHOOL
Maganao Palimbang Sultan Kudarat

PROJECT PROPOSAL
PP No.: 2022-11-002

I. Project Title: To be used for painting and School Ground beautification


II. Proponent: MAGANAO ELEMENTARY SCHOOL
III. Location: Maganao Palimbang Sultan Kudarat
IV. Duration: Nov-22
V. Project Beneficiaries: Maganao ES Faculty, Staff, Students and Stakeholders

The purpose of painting is to protect the building and engineering materials from
VI. Rationale: corrosion and rusting. This will greatly enhances the useful life of the building and
equipments. Painting and coatings also decorative look to the building.

VII. Goals/Objectives: 1. It protects the surface from weathering effects and effect of other gases and fumes.
2. Painting makes the surface smooth for easy cleaning.
VIII. Budget Requirements:

ITEM
Total Remarks
DESCRIPTION
I. MATERIAL COST 18205.00
II. LABOR COST 6371.75
III. INCIDENTAL
1067.97
EXPENSES
IV. TOTAL COST ₱25,644.72

IX. Cooperating Agencies:


1. Division Office
2. School Repair and Maintenance Committee
3. School Physical Facilities Coordinator
X. Program/PAPs: RM-Building and Other Structure/GAD FUND

Prepared by:

ADTIS A. ABUBAKAR
School Head

Validated by: Checked and Reviewed:

NISREEN AMERAH D. WAYA ENGR. VIRGIL GLENN D. VEGO


Senior Bookkeeper Engineer III

APPROVED:

LEONARDO M. BALALA, CESE


Schools Division Superintendent

Address: Kenram, Isulan, Sultan Kudarat


Telephone No.: (064) 471 1007
Website: https://depedsultankudarat.org Email: depedsk.r12@deped.gov.ph
Republic of the Philippines
Department of Education
REGION XII
DIVISION OF SULTAN KUDARAT
MAGANAO ELEMENTARY SCHOOL
Maganao Palimbang Sultan Kudarat

PROGRAM OF WORKS
PP No.: 2022-11-002
PROJECT TITLE: To be used for painting and School Ground beautification
BUDGET ALLOCATION: PHP 25,644.72
SOURCE OF FUNDS: School MOOE
PERIOD COVERED: Nov-22

Unit Cost Total Cost


No. Description Unit Quantity TOTAL
Material Labor Material Labor
1 Panclub Paint Brush 2 pcs 5 75 26.25 375 131.25 506
2 Panclub Paint Brush 3 pcs 6 80 28 480 168 648
3 Paint Roller 7 Hi-Tech pcs 6 65 22.75 390 136.5 527
4 ROS Crystal Green pcs 6 770 269.5 4620 1617 6,237
5 ROS Rain or Shine Tulips pcs 6 650 227.5 3900 1365 5,265
6 Triton Flat Latex box 10 575.00 201.25 5750 2012.5 7,763
7 Boysen LTC Hamsa Yellow box 10 60 21 600 210 810
8 Boysen LTC Hamza Red box 14 55 19.25 770 269.5 1,040
9 Boysen LTC Thalo Blue role 15 60 21 900 315 1,215
10 Cement pcs 10 42.00 14.7 420 147 567

Total Cost of Materials 18205.00


Incidental Expenses 1067.97
Labor Cost 6371.75
Grand Total 25644.72

Prepared by:

ADTIS A. ABUBAKAR
School Head

Validated by: Checked and Reviewed:

NISREEN AMERAH D. WAYA ENGR. VIRGIL GLENN D. VEGO


nior Bookkeeper Engineer III

APPROVED:

LEONARDO M. BALALA, CESE


Schools Division Superintendent

Address: Kenram, Isulan, Sultan Kudarat


Telephone No.: (064) 471 1007