DUCT SCHEDULE - PALLET BLOCK

ITEM DESCRIPTION FROM TO


E

NOTE :
W 1.ALL DIMENSIONS ARE IN (mm) UNLESS OTHERWISE SPECIFIED.
S
2.DO NOT SCALE THE DRAWINGS.
3.ANY DISCREPENCIES IN THE DRAWING SHOULD BE BROUGHT
TO THE IMMEDIATE ATTENTION OF THE ARCHITECT OR
ENGINEER.

A 5. ALL DRAIN POINT SHALL CONNECT TO NEAREST DRAINAGE


SYSTEM.
6.REFER CIVIL AND STRUCTURAL DRAWING FOR PIPE SUPPORT
STRUCTURE AND FOUNDATION.

-1.5 m Deep
+0.30 m LVL
+0.30 m LVL
+0.30 m LVL
7.CONTRACTOR SHALL CHECK SITE FEASIBILITY AND SITE
PPE STEPLER# STEPLER# MAINTENANCE
+0.30 m LVL TRANSFORMER
MAINTENANCE
ROOM MAINTENANCE ROOM
6KV
TRANSFORMER
MEASUREMENT BEFORE FABRICATION OF PIPING SPOOLS.

CAPACITOR
ROOM

250KVAR
BREAKER
ROOM

PANEL
-1.5 m Deep
+0.30 m LVL

water dispenser
CORRIDOR STEPLER# +0.30 m LVL
8.CONTRACTOR SHALL PROVIDE ADDITIONAL SUPPORTS FROM

PANEL
UPS
-1.5 m Deep
LOCKER
LV ROOM

CAPACITOR
STRUCTURE AVAILABLE FOR EQUIPMENTS / CONVEYOR.

250KVAR

PANEL
HYDRAULIC PUMP
SRI 78 OFFWHITE ALUMINUM SHEET AREA
9. IMAL TO REVIEW & CONFIRM THE END CONNECTIONS BEFORE
Recv Tank
PCC PANEL
TOILET -1.5 m Deep -1.5 m Deep
UPM PROCUREMENT.

AIR DRYER

-HYDRAULIC CABLE TRENCH-

-HYDRAULIC CABLE TRENCH-

-HYDRAULIC CABLE TRENCH-

-HYDRAULIC CABLE TRENCH-

-HYDRAULIC CABLE TRENCH-

-HYDRAULIC CABLE TRENCH-


COMPRESSOR

SHUTTER DOOR
COMPRESSOR ROOM
6300x4250 mm

GLUE KITCHEN

150 m3
Pump skid Domestic &
Foundation Industrial
4m x3m
water
EXTRUSION
PRESS - 4
EXTRUSION
PRESS - 3
EXTRUSION
PRESS - 2
EXTRUSION
PRESS - 1 0.4mm freeboard
DAMPER DAMPER DAMPER
DAMPER
VALVE 280ID
5.25 m dia 7.5 m
VALVE 280ID
VALVE 280ID VALVE 280ID
high

STEPLER# STEPLER#

B B Pump room
6x6m
240 m3 240 m3
STEPLER#
FF water Tank FF water Tank
+3.5 m LVL 0.4mm freeboard 0.4mm freeboard
6 m dia 8.7m high 6 m dia 8.7 m high

+0.15 m LVL

GLUE/HARDENER
SLIDING STEEL DOOR

PREPARATION ±0.00 m LVL

-SLOT DRAIN TRENCH-

SHUTTER DOOR
SHUTTER DOOR

PRESS AREA
Storage OVER HEAD CRANE ACTIVE AREA
(DOUBLE HIGH SPACE)
+0.30 m LVL

+0.30 m LVL

+0.70m DIKE WALL

+1.0 m LVL
+0.70m DIKE WALL

TANK STORAGE
AREA
(double high space)

FOR APPROVAL
+0.70m DIKE WALL +0.70m DIKE WALL

C C

C 11-11-2021 UPDATED AS PER COMMENTS FROM UPM MK/KN CEC


WET CLEANING SYSTEM
FOR PRESS EXHAUST GAS

B 30-10-2021 UPDATED AS PER COMMENTS FROM UPM MK/KN CEC

A 25-10-2021 ISSUED FOR REVIEW MK/KN CEC

A S# DATE REVISION ISSUED BY


10 11
-SLOT DRAIN TRENCH-

CAPITAL
ENGINEERING CONSULTANCY
TEL.: +971 4 2546155 ٤ ٢٥٤٦١ ٥٥
2.4M STACKING AREA ٤ ٢٥٤٦١٧٧
FAX: +971 4 2546177
P.O.BOX : 92301, Dubai - U.A.E. ‫ يبد‬٩٢٣٠١

Web.: www.capitalengineeringconsultancy.com
PALLET STACKING AREA UP

2.4M STACKING AREA


CLIENT NAME UNION PAPER MILLS - FACTORY

FUTURE MEZZANINE EXPANSION AREA +0.30 m LVL 2.4M STACKING AREA


PROJECT PROPOSED PALLET MANUFACTURING PLANT
LIFT
PROVISION PALLET STACKING AREA
DOUBLE HIGH SPACE
AL QUOZ
DISPATCHING AREA 3640566 AREA INDUSTRIAL FIRST,
PLOT No:
DUBAI, UAE
WRAPPING AREA
+0.30 m LVL +0.30 m LVL
DRAWING DUCT LAYOUT FOR SUCTION DUCT
CONTENT FROM EXTRUSION 1, 2, 3&4 TO SCRUBBER

+0.30 m LVL
DRG.NO CEC-DWG-PP-LT-DUCT-101 JOB. NO DXB-276
- 9x9 m loading area -
LEVELER

1:12.5 RAMP 25-10-2021


DOCK

-0.15 m LVL
DATE ARCHITECT SUHAIL
DUCTING PLAN FOR 640-5901-EXS-MS
STORM DRAIN

±0.00 m LVL SUMP PIT reverse slop loading


-INTERLOCK SRI 29- - 1.15 m LVL 1 SCALE 1:200 ENGINEER ESLAM
AR-02 SCALE 1:200
SLOT DRAIN TRENCH

-INTERLOCK SRI 29- +0.15 m LVL DRAWN BY PS CHECKD BY KN APPROVED BY KN

SHEET 1 OF 5