You are on page 1of 2

Latest Inspection Report ,Chakradharpur Division/South Eastern Railway

In the Jurisdiction of SSE/P/KND(Sec.)


Location Is on
Section/ Line/ Operating Passenger
Sl No P-Xing No.
Station Loop Line Station km m Runner
Line?
1 CNI KND DN KND 44A 390 141 Yes
2 CNI KND DN KND 43B 390 169 Yes
3 CNI KND DN KZU 23B 388 46 Yes
4 CNI KND UP MIK 21A 382 189 Yes
5 CNI KND UP MIK 22B 382 202 Yes
6 CNI KND UP MIK 29B 384 709 Yes
7 CNI KND UP MIK 30A 384 722 Yes
GMH-
8 DN BIRP 114B 265 964 Yes
KND
GMH-
9 DN BIRP 115A 265 970 Yes
KND
GMH-
10 DN GMH 69B 260 966 Yes
KND
GMH-
11 UP BIRP 33A 264 1016 Yes
KND
GMH-
12 UP BIRP 112B 266 14 Yes
KND
GMH-
13 UP GMH 66B 260 755 Yes
KND
GMH-
14 UP GMH 69A 260 868 Yes
KND
15 KND SNY DN KND 25A 391 537 Yes
16 KND SNY UP KND 31A 391 319 Yes
17 KND SNY UP KND 27B 391 373 Yes
18 KND DN LOOP L2 KND 43A 390 263 Yes
19 KND DN LOOP L2 KND 42B 390 299 Yes
20 KND DN LOOP L2 KND 34A 391 168 Yes
21 KND DN LOOP L2 KND 33B 391 173 Yes
22 KND DN LOOP L3 KND 41A 390 530 Yes

Page 1 of 2
on/South Eastern Railway
ND(Sec.)
Latest Inspection Date
Sr. ADEN/
JE SSE
ADEN
28/12/2022 30/05/2022 23/06/2022
16/09/2022 19/12/2022 23/06/2022
26/12/2022 30/05/2022 23/06/2022
25/10/2022 02/12/2022 08/04/2022
25/10/2022 02/12/2022 08/04/2022
19/10/2022 17/12/2022 08/04/2022
19/10/2022 17/12/2022 08/04/2022
30/09/2022 22/06/2022 16/12/2022

16/09/2022 22/06/2022 16/12/2022

16/09/2022 20/06/2022 31/12/2022

16/09/2022 22/06/2022 16/12/2022

16/09/2022 22/06/2022 16/12/2022

16/09/2022 20/06/2022 31/12/2022

16/09/2022 20/06/2022 31/12/2022


21/09/2022 18/06/2022 20/12/2022
25/10/2022 30/03/2022 20/12/2022
16/09/2022 18/06/2022 20/12/2022
21/09/2022 31/03/2022 20/12/2022
21/09/2022 31/03/2022 20/12/2022
21/09/2022 31/03/2022 20/12/2022
21/09/2022 31/03/2022 20/12/2022
21/09/2022 31/03/2022 20/12/2022

Page 2 of 2