DPT TINGGI 4 M

Sketsa Panjang Jumlah Segmen Perhitungan volume

PASANGAN BATU (M3)

1 0.5 + 0.7 x 1.5 = 0.90


2
2 0.9 + 1.1 x 1.5 = 1.50
50 2
30 20
3 1.3 + 1.6 x 1 = 1.45
2
4 1.8 x 0.5 = 0.90 (+)
150 4.75

20 5 0.2 x 0.2 = 0.02 (-)


70 1 2 4.73 4.73

40

150

20

10

100
20

160
40 30 50

30
75

5
180
20 10

jumlah 4.73

Sketsa Panjang Jumlah Segmen Perhitungan volume

BETON K-250 (M3)

1 0.10 x 0.30 = 0.03


B1
A1 2 0.30 x 2.10 = 0.63
A2

A3 BETON K-250
3 0.20 x 0.30 x 0.35 = 0.09
2
B2 (+)
B3
1 0.75 0.75

A1 = 0.10 M B1 = 0.30 M
A2 = 0.30 M B2 = 0.20 M
A3 = 0.35 M B3 = 2.10 M
jumlah 0.75
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume

BESI U-24 (KG)


0.3
1 16 6 1.74 1.578 16.47
0.3 2 16 6 2.68 1.578 25.37
30 3 16 6 2.2 1.578 20.83
4 12 31 1.04 0.888 28.63
30
0.75 75 5 10 27 0.34 0.617 5.66
Ø 12 - 20
33,7
5 Ø 10 - 20/40
Ø 16 - 20
Ø 16 - 20

180
20 10 0.33

0.2 2.1

1 0.24 2 2.04
0.05 0.24 0.24
0.69 0.24 0.08 0.08
0.08 2.04 0.08
0.33 3
0.14 4
0.05 0.94 0.05
0.05
5 0.24
0.05 jumlah 96.97

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN PASIR (M3)

1 0.05 x 0.20 = 0.01

2 0.05 x 1.80 = 0.09

(+)
URUGAN PASIR
A2
1.00 0.10 0.10
A1

B1 B2

A1 = 0.05 M B1 = 0.20 M
A2 = 0.05 M B2 = 1.80 M

jumlah 0.10
Sketsa Panjang Jumlah Segmen Perhitungan volume

GALIAN TANAH (M3)

1 0.5 x 1.00 x 4.00 = 2.00

2 0.85 x 2.10 = 1.79

3 0.20 + 0.28 x 0.35 = 0.08


2 (+)
1.00 Luas tot = 3.87 3.87

B1

A1

B2

A2

A3

B3
B4

A1 = 4.00 M B1 = 1.00 M
A2 = 0.85 M B2 = 0.28 M
A3 = 0.35 M B3 = 0.20 M
B4 = 2.10 M

jumlah 3.87

Sketsa Segmen Panjang Jumlah Perhitungan volume

PLESTERAN (M2)

A2 1 1 0.10 + 0.34 + 0.30 = 0.74


A3 A1 = 0.10 M
A2 = 0.34 M 2 1 0.10 + 0.10 + 0.20 = 0.40
A1 A3 = 0.30 M
3 1 0.10 + 0.10 + 0.20 = 0.40

1.00 Lebar Total = 1.54 1.54

A6 A2
A3
A1

A4 = 0.10 M
A5 A6

A4
A5
A4

A5 = 0.10 M
A9
A7 A8
A6 = 0.20 M

A9
A7 A8 A1
A2
A3

A6

A5
A4

A9
A7 A8
A2
A3
A1

A6

A5
A4

A9
A7 A8

A7 = 0.10 M
A8 = 0.10 M
A9 = 0.20 M

jumlah 1.54
Sketsa PVC Panjang Jumlah Perhitungan volume

PIPA SULINGAN PVC 2.5" (M)

1 0.65 1 0.65 x 1 = 0.65


50
2 0.73 1 0.73 x 1 = 0.73

50 3 1.01 1 1.01 x 1 = 1.01

65 4 1.08 1 1.08 x 1 = 1.08


50

5 1.15 1 1.15 x 1 = 1.15


73 50

6 1.51 1 1.51 x 1 = 1.51 (+)


101 50
6.13 6.13
40
108 50

1 5 50

151

40

75

5
180
20 10

jumlah 6.13

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN TANAH KEMBALI (M3)


B1
1 0.5 x 1.00 x 4.00 = 2.00

1 2.00 2.00

A1

A1 = 4.00 M B1 = 1.00 M
jumlah 2.00
DPT TINGGI 4.5 M
Sketsa Panjang Jumlah Segmen Perhitungan volume

PASANGAN BATU (M3)

1 0.5 + 0.75 x 1.5 = 0.94


2
2 0.95 + 1.2 x 1.5 = 1.61
2
3 1.4 + 1.8 x 1.5 = 2.40
2
4 2 x 0.5 = 1.00 (+)
5.95
50
30 20
5 0.2 x 0.2 = 0.02 (-)
50
1 2 5.93 5.93

150 68 50

20 77 50

75

107 50

450 150 116 50

20 125 50
120

50
160

150
175

20

180
40 30 50

30
75
Ø 12 - 20
Ø 10 - 20/40
Ø 16 - 20 5
Ø 16 - 20
200
20 10

jumlah 5.93

Sketsa Panjang Jumlah Segmen Perhitungan volume

BETON K-250 (M3)

1 0.10 x 0.30 = 0.03


B1
A1 2 0.30 x 2.30 = 0.69
A2

A3 BETON K-250
3 0.20 x 0.30 x 0.35 = 0.09
2
B2 (+)
B3
1 0.81 0.81

A1 = 0.10 M B1 = 0.30 M
A2 = 0.30 M B2 = 0.20 M
A3 = 0.35 M B3 = 2.30 M

jumlah 0.81
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume

BESI U-24 (KG)


0.3
1 16 6 1.74 1.578 16.47
0.3 2 16 6 2.88 1.578 27.27
30
3 16 6 2.4 1.578 22.72
75
30
4 12 31 1.04 0.888 28.63
0.75 5
33,7
Ø 12 - 20
Ø 10 - 20/40
5 10 29 0.34 0.617 6.08
Ø 16 - 20
Ø 16 - 20

180
20 10

0.33

0.2 2.3

1 0.24 2 2.24
0.05 0.24 0.24
0.69 0.24 0.08 0.08
0.08 2.24 0.08
0.33 3
0.14 4
0.05 0.94 0.05
0.05
5 0.24
0.05 jumlah 101.18

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN PASIR (M3)

1 0.05 x 0.20 = 0.01

2 0.05 x 2.00 = 0.10

(+)
URUGAN PASIR
A2
1.00 0.11 0.11
A1

B1 B2

A1 = 0.05 M B1 = 0.20 M
A2 = 0.05 M B2 = 2.00 M

jumlah 0.11
Sketsa Panjang Jumlah Segmen Perhitungan volume

GALIAN TANAH (M3)

1 0.5 x 1.00 x 4.50 = 2.25

2 0.85 x 2.30 = 1.96

3 0.20 + 0.30 x 0.35 = 0.09


2 (+)
1.00 Luas tot = 4.29 4.29

B1

A1

B2

A2

A3

B3
B4

A1 = 4.50 M B1 = 1.00 M
A2 = 0.85 M B2 = 0.30 M
A3 = 0.35 M B3 = 0.20 M
B4 = 2.30 M

jumlah 4.29

Sketsa Segmen Panjang Jumlah Perhitungan volume

PLESTERAN (M2)

A2 1 1 0.10 + 0.34 + 0.30 = 0.74


A3 A1 = 0.10 M
A2 = 0.34 M 2 1 0.10 + 0.10 + 0.20 = 0.40
A1 A3 = 0.30 M
3 1 0.10 + 0.10 + 0.20 = 0.40

1.00 Lebar Total = 1.54 1.54

A6 A2
A3
A1

A4 = 0.10 M
A5 A6

A4
A5
A4

A5 = 0.10 M
A9
A7 A8
A6 = 0.20 M

A9
A7 A8 A1
A2
A3

A6

A5
A4

A9

A7 A8
A6

A5
A4

A9

A7 A8

A7 = 0.10 M
A8 = 0.10 M
A9 = 0.20 M

jumlah 1.54
Sketsa PVC Panjang Jumlah Perhitungan volume

50 PIPA SULINGAN PVC 2.5" (M)

1 0.68 1 0.68 x 1 = 0.68


50
2 0.77 1 0.77 x 1 = 0.77
68 50
3 1.07 1 1.07 x 1 = 1.07

77 50 4 1.16 1 1.16 x 1 = 1.16

5 1.25 1 1.25 x 1 = 1.25


107 50
6 1.6 1 1.6 x 1 = 1.60
450 116 50
7 1.75 1 1.75 x 1 = 1.75

125 50 1 8.28 8.28

50
160

175

40 30 50

30
75

200
20 10

jumlah 8.28

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN TANAH KEMBALI (M3)


B1
1 0.5 x 1.00 x 4.50 = 2.25

1 2.25 2.25

A1

A1 = 4.50 M B1 = 1.00 M

jumlah 2.25
DPT TINGGI 5 M
Sketsa Panjang Jumlah Segmen Perhitungan volume

PASANGAN BATU (M3)

1 0.5 + 0.75 x 1.5 = 0.94


2
2 0.95 + 1.3 x 1.5 = 1.69
2
3 1.5 + 2 x 2 = 3.50
2
4 2.2 x 0.5 = 1.10 (+)
7.23

50 5 0.2 x 0.2 = 0.02 (-)


30 20
1 2 7.21 7.205
50

150 67 50

20 76
50

75

109 50

150 12 50
500
20 50
135
130
50
171

184
20

20

200
40 30 50

30
75
Ø 12 - 20
5 Ø 10 - 20/40

Ø 16 - 20 Ø 16 - 20
20
20 10

jumlah 7.21

Sketsa Panjang Jumlah Segmen Perhitungan volume

BETON K-250 (M3)

1 0.10 x 0.30 = 0.03


B1
A1 2 0.30 x 2.50 = 0.75
A2

A3 BETON K-250
3 0.20 x 0.30 x 0.35 = 0.09
2
B2 (+)
B3
1 0.87 0.87

A1 = 0.10 M B1 = 0.30 M
A2 = 0.30 M B2 = 0.20 M
A3 = 0.35 M B3 = 2.50 M

jumlah 0.87
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume

BESI U-24 (KG)


0.3
1 16 6 1.74 1.578 16.47
0.3 2 16 6 3.08 1.578 29.16
30
3 16 6 2.6 1.578 24.62
75
30
4 12 31 1.04 0.888 28.63
0.75 33,7
Ø 12 - 20
Ø 10 - 20/40
5 10 32 0.34 0.617 6.71
Ø 16 - 20 5
Ø 16 - 20

180
20 10

0.33

0.2 2.5

1 0.24 2 2.44
0.05 0.24 0.24
0.69 0.24 0.08 0.08
0.08 2.44 0.08
0.33 3
0.14 4
0.05 0.94 0.05
0.05
5 0.24
0.05 jumlah 105.59

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN PASIR (M3)

1 0.05 x 0.20 = 0.01

2 0.05 x 2.20 = 0.11

(+)
URUGAN PASIR
A2
1.00 0.12 0.12
A1

B1 B2

A1 = 0.05 M B1 = 0.20 M
A2 = 0.05 M B2 = 2.20 M

jumlah 0.12
Sketsa Panjang Jumlah Segmen Perhitungan volume

GALIAN TANAH (M3)

1 0.5 x 1.00 x 5.00 = 2.50

2 0.85 x 2.50 = 2.13

3 0.20 + 0.30 x 0.35 = 0.09


2 (+)
1.00 Luas tot = 4.71 4.71

B1

A1

B2

A2

A3

B3
B4

A1 = 5.00 M B1 = 1.00 M
A2 = 0.85 M B2 = 0.30 M
A3 = 0.35 M B3 = 0.20 M
B4 = 2.50 M

jumlah 4.71

Sketsa Segmen Panjang Jumlah Perhitungan volume

PLESTERAN (M2)

A2 1 1 0.10 + 0.34 + 0.30 = 0.74


A3 A1 = 0.10 M
A2 = 0.34 M 2 1 0.10 + 0.10 + 0.20 = 0.40
A1 A3 = 0.30 M
3 1 0.10 + 0.10 + 0.20 = 0.40

1.00 Lebar Total = 1.54 1.54

A6 A2
A3
A1

A4 = 0.10 M
A5 A6

A4
A5
A4

A5 = 0.10 M
A9
A7 A8
A6 = 0.20 M

A9
A7 A8 A1
A2
A3

A6

A5
A4

A9

A7 A8
A6

A5
A4

A9

A7 A8

A7 = 0.10 M
A8 = 0.10 M
A9 = 0.20 M

jumlah 1.54
Sketsa PVC Panjang Jumlah Perhitungan volume

PIPA SULINGAN PVC 2.5" (M)

1 0.67 1 0.67 x 1 = 0.67

2 0.76 1 0.76 x 1 = 0.76

3 1.09 1 1.09 x 1 = 1.09

4 1.22 1 1.22 x 1 = 1.22

50
5 1.35 1 1.35 x 1 = 1.35
30 20

50

67 50
6 1.71 1 1.71 x 1 = 1.71
76 50

109 50

122 50
7 1.84 1 1.84 x 1 = 1.84
500

135 50

1 8.64 8.64
50
171

184

40 30 50

30
75

220
20 10

jumlah 8.64

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN TANAH KEMBALI (M3)


B1
1 0.5 x 1.00 x 5.00 = 2.50

1 2.50 2.50

A1

A1 = 5.00 M B1 = 1.00 M

jumlah 2.50
DPT TINGGI 5.5 M
Sketsa Panjang Jumlah Segmen Perhitungan volume

PASANGAN BATU (M3)

1 0.5 + 0.75 x 1.5 = 0.94


2
2 0.95 + 1.5 x 2 = 2.45
2
3 1.7 + 2.2 x 2 = 3.90
50
30 20 2
4 2.4 x 0.75 = 1.80 (+)
50
9.09
150 67 50
5 0.2 x 0.2 = 0.02 (-)
20 76 50 1 2 9.07 9.0675
75

1 0 50

125 50
20
50 141 50

20 50
159
150
50
19 2

2 06
20

20

20

65 75
30

30
75
Ø 12 - 20

5 Ø 10 - 20/40

Ø 16 - 20 Ø 16 - 20
240
2010

jumlah 9.07

Sketsa Panjang Jumlah Segmen Perhitungan volume

BETON K-250 (M3)

1 0.10 x 0.30 = 0.03


B1
A1 2 0.30 x 2.70 = 0.81
A2

A3 BETON K-250
3 0.20 x 0.30 x 0.35 = 0.09
2
B2 (+)
B3
1 0.93 0.93

A1 = 0.10 M B1 = 0.30 M
A2 = 0.30 M B2 = 0.20 M
A3 = 0.35 M B3 = 2.70 M

jumlah 0.93
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume

BESI U-24 (KG)


0.3
1 16 6 1.74 1.578 16.47
0.3 2 16 6 3.28 1.578 31.06
30
3 16 6 2.8 1.578 26.51
75
30 4 12 31 1.04 0.888 28.63
0.75 33,7
Ø 12 - 20
Ø 10 - 20/40
5 10 34 0.34 0.617 7.13
Ø 16 - 20 5
Ø 16 - 20

180
20 10

0.33

0.2 2.7

1 0.24 2 2.64
0.05 0.24 0.24
0.69 0.24 0.08 0.08
0.08 2.64 0.08
0.33 3
0.14 4
0.05 0.94 0.05
0.05
5 0.24
0.05 jumlah 109.80

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN PASIR (M3)

1 0.05 x 0.20 = 0.01

2 0.05 x 2.40 = 0.12

(+)
URUGAN PASIR
A2
1.00 0.13 0.13
A1

B1 B2

A1 = 0.05 M B1 = 0.20 M
A2 = 0.05 M B2 = 2.40 M

jumlah 0.13
Sketsa Panjang Jumlah Segmen Perhitungan volume

GALIAN TANAH (M3)

1 0.5 x 1.00 x 5.50 = 2.75

2 1.10 x 2.70 = 2.97

3 0.20 + 0.30 x 0.35 = 0.09


2 (+)
1.00 Luas tot = 5.81 5.81

B1

A1

B2

A2

A3

B3
B4

A1 = 5.50 M B1 = 1.00 M
A2 = 1.10 M B2 = 0.30 M
A3 = 0.35 M B3 = 0.20 M
B4 = 2.70 M

jumlah 5.81

Sketsa Segmen Panjang Jumlah Perhitungan volume

PLESTERAN (M2)

A2 1 1 0.10 + 0.34 + 0.30 = 0.74


A3 A1 = 0.10 M
A2 = 0.34 M 2 1 0.10 + 0.10 + 0.20 = 0.40
A1 A3 = 0.30 M
3 1 0.10 + 0.10 + 0.20 = 0.40

1.00 Lebar Total = 1.54 1.54

A6 A2
A3
A1

A4 = 0.10 M
A5 A6

A4
A5
A4

A5 = 0.10 M
A9
A7 A8
A6 = 0.20 M

A9
A7 A8 A1
A2
A3

A6

A5
A4

A9

A7 A8
A6

A5
A4

A9

A7 A8

A7 = 0.10 M
A8 = 0.10 M
A9 = 0.20 M

jumlah 1.54
Sketsa PVC Panjang Jumlah Perhitungan volume

PIPA SULINGAN PVC 2.5" (M)

1 0.67 1 0.67 x 1 = 0.67


50
30 20
2 0.76 1 0.76 x 1 = 0.76
50

67 50 3 1.1 1 1.1 x 1 = 1.10


76 50

4 1.25 1 1.25 x 1 = 1.25


110 50

125 50
5 1.41 1 1.41 x 1 = 1.41
550 141 50

159
50 6 1.59 1 1.59 x 1 = 1.59
50
192
7 1.92 1 1.92 x 1 = 1.92
206

8 2.06 1 2.06 x 1 = 2.06

65 75
1 10.76 10.76
30

30
75
Ø 12 - 20

240
20 10

jumlah 10.76

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN TANAH KEMBALI (M3)


B1
1 0.5 x 1.00 x 5.50 = 2.75

1 2.75 2.75

A1

A1 = 5.50 M B1 = 1.00 M

jumlah 2.75
DPT TINGGI 6 M
Sketsa Panjang Jumlah Segmen Perhitungan volume

PASANGAN BATU (M3)

1 0.5 + 0.75 x 1.5 = 0.94


2
2 0.95 + 1.5 x 2 = 2.45
2
3 1.7 + 2.5 x 2.5 = 5.25
2
4 2.7 x 0.75 = 2.03 (+)
50
10.66
30 20

50
5 0.2 x 0.2 = 0.02 (-)
1 2 10.64 10.643
150 67 50

20 76 50

75

112 50

130 50
200

148 50
600
20 50
170
150
50
205

50
220

250
236

20

250

65 75
30

30
75
Ø 12 - 20
5 Ø 10 - 20/40

Ø 16 - 20 Ø 16 - 20

270
20 10

jumlah 10.64

Sketsa Panjang Jumlah Segmen Perhitungan volume

BETON K-250 (M3)

1 0.10 x 0.30 = 0.03


B1
A1 2 0.30 x 3.00 = 0.90
A2

A3 BETON K-250
3 0.20 x 0.30 x 0.35 = 0.09
2
B2 (+)
B3
1 1.02 1.02

A1 = 0.10 M B1 = 0.30 M
A2 = 0.30 M B2 = 0.20 M
A3 = 0.35 M B3 = 3.00 M

jumlah 1.02
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume

BESI U-24 (KG)


0.3
1 16 6 1.74 1.578 16.47
0.3 2 16 6 3.58 1.578 33.90
30
3 16 6 3.1 1.578 29.35
75
30 4 12 31 1.04 0.888 28.63
0.75 33,7
Ø 12 - 20
Ø 10 - 20/40
5 10 38 0.34 0.617 7.97
Ø 16 - 20 5
Ø 16 - 20

180
20 10

0.33

0.2 3

1 0.24 2 2.94
0.05 0.24 0.24
0.69 0.24 0.08 0.08
0.08 2.94 0.08
0.33 3
0.14 4
0.05 0.94 0.05
0.05
5 0.24
0.05 jumlah 116.32

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN PASIR (M3)

1 0.05 x 0.20 = 0.01

2 0.05 x 2.70 = 0.14

A2
URUGAN PASIR (+)
1.00 0.15 0.15
A1

B1 B2

A1 = 0.05 M B1 = 0.20 M
A2 = 0.05 M B2 = 2.70 M

jumlah 0.15
Sketsa Panjang Jumlah Segmen Perhitungan volume

GALIAN TANAH (M3)

1 0.5 x 1.00 x 6.00 = 3.00

2 1.10 x 3.00 = 3.30

3 0.20 + 0.30 x 0.35 = 0.09


2 (+)
1.00 Luas tot = 6.39 6.39

B1

A1

B2

A2

A3

B3
B4

A1 = 6.00 M B1 = 1.00 M
A2 = 1.10 M B2 = 0.30 M
A3 = 0.35 M B3 = 0.20 M
B4 = 3.00 M

jumlah 6.39

Sketsa Segmen Panjang Jumlah Perhitungan volume

PLESTERAN (M2)
A2
1 1 0.10 + 0.34 + 0.30 = 0.74
A3 A1 = 0.10 M
A1 A2 = 0.34 M 2 1 0.10 + 0.10 + 0.20 = 0.40
A3 = 0.30 M
3 1 0.10 + 0.10 + 0.20 = 0.40

1.00 Lebar Total = 1.54 1.54

A6
A2
A3
A1

A5 A4 = 0.10 M
A4
A6
A5
A4

A5 = 0.10 M
A9
A7 A8
A6 = 0.20 M

A9
A2

A7
A3
A1

A8 A5
A4
A6

A9

A7 A8

A7 = 0.10 M
A8 = 0.10 M
A9 = 0.20 M

jumlah 1.54
Sketsa PVC Panjang Jumlah Perhitungan volume

PIPA SULINGAN PVC 2.5" (M)

1 0.67 1 0.67 x 1 = 0.67

2 0.76 1 0.76 x 1 = 0.76

3 1.12 1 1.12 x 1 = 1.12

4 1.3 1 1.3 x 1 = 1.30

5 1.48 1 1.48 x 1 = 1.48

6 1.7 1 1.7 x 1 = 1.70

50
30 20 7 2.05 1 2.05 x 1 = 2.05
50

67 50 8 2.2 1 2.2 x 1 = 2.20


76 50

112 50
9 2.36 1 2.36 x 1 = 2.36
130 50

50
1 13.64 13.64
148
600

50
170

50
205

50
20

236

65 75
30

30
75

5
270
20 10

jumlah 13.64

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN TANAH KEMBALI (M3)


B1
1 0.5 x 1.00 x 6.00 = 3.00

1 3.00 3.00

A1

A1 = 6.00 M B1 = 1.00 M

jumlah 3.00
DPT TINGGI 6.5 M
Sketsa Panjang Jumlah Segmen Perhitungan volume

PASANGAN BATU (M3)

1 0.5 + 0.75 x 1.5 = 0.94


2
2 0.95 + 1.7 x 2.5 = 3.31
2
3 1.9 + 2.7 x 2.5 = 5.75
2
4 2.9 x 0.75 = 2.18 (+)
12.18

5 0.2 x 0.2 = 0.02 (-)


1 2 12.16 12.155

50
30 20

50

150 67 50

20 76 50

75

111 50

128 50

250 145 50

650 50
161

20 50
181
170
50
218

50
236

250
254

20

270

65 75
30

30
75
Ø 12- 20

5 Ø 10 - 20/40

Ø 16 - 20 Ø 16- 20

290
20 10

jumlah 12.16

Sketsa Panjang Jumlah Segmen Perhitungan volume

BETON K-250 (M3)

1 0.10 x 0.30 = 0.03


B1
A1 2 0.30 x 3.20 = 0.96
A2

A3 BETON K-250
3 0.20 x 0.30 x 0.35 = 0.09
2
B2 (+)
B3
1 1.08 1.08

A1 = 0.10 M B1 = 0.30 M
A2 = 0.30 M B2 = 0.20 M
A3 = 0.35 M B3 = 3.20 M

jumlah 1.08
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume

BESI U-24 (KG)


0.3
1 16 6 1.74 1.578 16.47
0.3 2 16 6 3.78 1.578 35.79
30
3 16 6 3.3 1.578 31.24
75
30 4 12 31 1.04 0.888 28.63
0.75 33,7
Ø 12 - 20
Ø 10 - 20/40
5 10 40 0.34 0.617 8.39
Ø 16 - 20 5
Ø 16 - 20

180
20 10

0.33

0.2 3.2

1 0.24 2 3.14
0.05 0.24 0.24
0.69 0.24 0.08 0.08
0.08 3.14 0.08
0.33 3
0.14 4
0.05 0.94 0.05
0.05
5 0.24
0.05 jumlah 120.53

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN PASIR (M3)

1 0.05 x 0.20 = 0.01

2 0.05 x 2.90 = 0.15

A2

(+)
URUGAN PASIR

A1

B1 B2
1.00 0.16 0.16

A1 = 0.05 M B1 = 0.20 M
A2 = 0.05 M B2 = 2.90 M

jumlah 0.16
Sketsa Panjang Jumlah Segmen Perhitungan volume

GALIAN TANAH (M3)

1 0.5 x 1.00 x 6.50 = 3.25

2 1.10 x 3.20 = 3.52

3 0.20 + 0.30 x 0.35 = 0.09


2 (+)
1.00 Luas tot = 6.86 6.86

B1

A1

B2

A2

A3

B3
B4

A1 = 6.50 M B1 = 1.00 M
A2 = 1.10 M B2 = 0.30 M
A3 = 0.35 M B3 = 0.20 M
B4 = 3.20 M

jumlah 6.86

Sketsa Segmen Panjang Jumlah Perhitungan volume

PLESTERAN (M2)
A2
1 1 0.10 + 0.34 + 0.30 = 0.74
A3 A1 = 0.10 M
A1 A2 = 0.34 M 2 1 0.10 + 0.10 + 0.20 = 0.40
A3 = 0.30 M
3 1 0.10 + 0.10 + 0.20 = 0.40

1.00 Lebar Total = 1.54 1.54

A6
A2

A5
A3
A1

A4 = 0.10 M
A4 A5
A4
A6

A5 = 0.10 M
A9
A7 A8
A6 = 0.20 M

A9
A7 A8 A1
A2
A3

A6

A5
A4

A9
A7 A8

A7 = 0.10 M
A8 = 0.10 M
A9 = 0.20 M

jumlah 1.54
Sketsa PVC Panjang Jumlah Perhitungan volume

PIPA SULINGAN PVC 2.5" (M)

1 0.67 1 0.67 x 1 = 0.67

2 0.76 1 0.76 x 1 = 0.76

3 1.11 1 1.11 x 1 = 1.11


50
30 20

50
4 1.28 1 1.28 x 1 = 1.28
67 50
5 1.45 1 1.45 x 1 = 1.45
76 50

111 50 6 1.61 1 1.61 x 1 = 1.61


128 50
7 1.81 1 1.81 x 1 = 1.81
145 50

650
161
50 8 2.18 1 2.18 x 1 = 2.18
50
181
9 2.36 1 2.36 x 1 = 2.36
50
218

236
50
10 2.54 1 2.54 x 1 = 2.54

254
1 15.77 15.77

65 75
30

30
75

5
290
20 10

jumlah 15.77

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN TANAH KEMBALI (M3)


B1
1 0.5 x 1.00 x 6.50 = 3.25

1 3.25 3.25

A1

A1 = 6.50 M B1 = 1.00 M

jumlah 3.25
DPT TINGGI 7 M
Sketsa Panjang Jumlah Segmen Perhitungan volume

PASANGAN BATU (M3)

1 0.5 + 0.9 x 2 = 1.40


2
2 1.1 + 1.8 x 2.5 = 3.63
2
3 2 + 3 x 2.5 = 6.25
2
4 3.2 x 0.75 = 2.40 (+)
13.68

50
30 20
5 0.2 x 0.2 = 0.02 (-)
50
1 2 13.66 13.66
70 50
200
81 50

20 92 50
90

127 50

143 50

250 50
158
700

50
174

20 50
190
180

50
135

50
258

250
281

20

300

65 75
30

30
75
Ø 12 - 20

5 Ø 10 - 20/40

Ø 16 - 20 Ø 16 - 20

320
20 10

jumlah 13.66

Sketsa Panjang Jumlah Segmen Perhitungan volume

BETON K-250 (M3)

1 0.10 x 0.30 = 0.03


B1
A1 2 0.30 x 3.50 = 1.05
A2

A3 BETON K-250
3 0.20 x 0.30 x 0.35 = 0.09
2
B2 (+)
B3
1 1.17 1.168

A1 = 0.10 M B1 = 0.30 M
A2 = 0.30 M B2 = 0.20 M
A3 = 0.35 M B3 = 3.50 M

jumlah 1.168
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume

BESI U-24 (KG)


0.3
1 16 6 1.74 1.578 16.47
0.3 2 16 6 4.08 1.578 38.63
30
3 16 6 3.6 1.578 34.08
30 4 12 31 1.04 0.888 28.63
75
0.75 Ø 12 - 20 5 10 44 0.34 0.617 9.23
33,7
5 Ø 10 - 20/40
Ø 16 - 20
Ø 16 - 20

180
20 10
0.33

0.2 3.5

1 0.24 2 3.44
0.05 0.24 0.24
0.69 0.24 0.08 0.08
0.08 3.44 0.08
0.33 3
0.14 4
0.05 0.94 0.05
0.05
5 0.24
0.05 jumlah 127.05

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN PASIR (M3)

1 0.05 x 0.20 = 0.01

2 0.05 x 3.20 = 0.16

(+)
URUGAN PASIR
A2
1.00 0.17 0.17
A1

B1 B2

A1 = 0.05 M B1 = 0.20 M
A2 = 0.05 M B2 = 3.20 M

jumlah 0.17
Sketsa Panjang Jumlah Segmen Perhitungan volume

GALIAN TANAH (M3)

1 0.5 x 1.00 x 7.00 = 3.50

2 1.10 x 3.50 = 3.85

3 0.20 + 0.30 x 0.35 = 0.09


2 (+)
1.00 Luas tot = 7.44 7.44

B1

A1

B2

A2

A3

B3
B4

A1 = 7.00 M B1 = 1.00 M
A2 = 1.10 M B2 = 0.30 M
A3 = 0.35 M B3 = 0.20 M
B4 = 3.50 M

jumlah 7.44

Sketsa Segmen Panjang Jumlah Perhitungan volume

PLESTERAN (M2)

A2 1 1 0.10 + 0.34 + 0.30 = 0.74


A3 A1 = 0.10 M
A2 = 0.34 M 2 1 0.10 + 0.10 + 0.20 = 0.40
A1 A3 = 0.30 M
3 1 0.10 + 0.10 + 0.20 = 0.40

1.00 Lebar Total = 1.54 1.54

A6 A2
A3
A1

A4 = 0.10 M
A5
A6
A5
A4

A5 = 0.10 M
A4 A7 A8
A9

A6 = 0.20 M

A9
A7 A8
A2
A3
A1

A6

A5
A4

A9
A7 A8

A7 = 0.10 M
A8 = 0.10 M
A9 = 0.20 M

jumlah 1.54
Sketsa PVC Panjang Jumlah Perhitungan volume

PIPA SULINGAN PVC 2.5" (M)

1 0.7 1 0.7 x 1 = 0.70

2 0.81 1 0.81 x 1 = 0.81

3 0.92 1 0.92 x 1 = 0.92

50
4 1.27 1 1.27 x 1 = 1.27
30 20

50

70 50
5 1.43 1 1.43 x 1 = 1.43
81 50

92 50
6 1.58 1 1.58 x 1 = 1.58
127 50

143 50 7 1.74 1 1.74 x 1 = 1.74


158 50
700

174
50
8 1.9 1 1.9 x 1 = 1.90
50
190

135
50
9 1.35 1 1.35 x 1 = 1.35
50
258

281 10 2.58 1 2.58 x 1 = 2.58

11 2.81 1 2.81 x 1 = 2.81


65 75
30

1 17.09 17.09
30
75

320
20 10

jumlah 17.09

Sketsa Panjang Jumlah Segmen Perhitungan volume

URUGAN TANAH KEMBALI (M3)


B1
1 0.5 x 1.00 x 7.00 = 3.50

1 3.50 3.50

A1

A1 = 7.00 M B1 = 1.00 M

jumlah 3.50
INDEKS VOLUME DPT

INDEKS VOLUME
NO DINDING PENAHAN TANAH ITEM PEKERJAAN SATUAN
PER METER'
1 DPT TINGGI 4 M Pasangan Batu M3 4.730
Beton K-250 M3 0.748
Besi U-24 KG 96.971
Urugan Pasir M3 0.100
Galian Tanah M3 3.869
Pelesteran tebal 3 CM M2 1.540
Pipa Sulingan PVC 2.5" M' 6.130
Urugan Tanah Kembali M3 2.000

INDEKS VOLUME
NO DINDING PENAHAN TANAH ITEM PEKERJAAN SATUAN
PER METER'
1 DPT TINGGI 4.5 M Pasangan Batu M3 5.930
Beton K-250 M3 0.808
Besi U-24 KG 101.178
Urugan Pasir M3 0.110
Galian Tanah M3 4.293
Pelesteran tebal 3 CM M2 1.540
Pipa Sulingan PVC 2.5" M' 8.280
Urugan Tanah Kembali M3 2.250

INDEKS VOLUME
NO DINDING PENAHAN TANAH ITEM PEKERJAAN SATUAN
PER METER'
1 DPT TINGGI 5 M Pasangan Batu M3 7.205
Beton K-250 M3 0.868
Besi U-24 KG 105.595
Urugan Pasir M3 0.120
Galian Tanah M3 4.713
Pelesteran tebal 3 CM M2 1.540
Pipa Sulingan PVC 2.5" M' 8.640
Urugan Tanah Kembali M3 2.500

INDEKS VOLUME
NO DINDING PENAHAN TANAH ITEM PEKERJAAN SATUAN
PER METER'
1 DPT TINGGI 5.5 M Pasangan Batu M3 9.068
Beton K-250 M3 0.928
Besi U-24 KG 109.801
Urugan Pasir M3 0.130
Galian Tanah M3 5.808
Pelesteran tebal 3 CM M2 1.540
Pipa Sulingan PVC 2.5" M' 10.760
Urugan Tanah Kembali M3 2.750
INDEKS VOLUME
NO DINDING PENAHAN TANAH ITEM PEKERJAAN SATUAN
PER METER'
1 DPT TINGGI 6 M Pasangan Batu M3 10.643
Beton K-250 M3 1.018
Besi U-24 KG 116.321
Urugan Pasir M3 0.145
Galian Tanah M3 6.388
Pelesteran tebal 3 CM M2 1.540
Pipa Sulingan PVC 2.5" M' 13.640
Urugan Tanah Kembali M3 3.000

INDEKS VOLUME
NO DINDING PENAHAN TANAH ITEM PEKERJAAN SATUAN
PER METER'
1 DPT TINGGI 6.5 M Pasangan Batu M3 12.155
Beton K-250 M3 1.078
Besi U-24 KG 120.528
Urugan Pasir M3 0.155
Galian Tanah M3 6.858
Pelesteran tebal 3 CM M2 1.540
Pipa Sulingan PVC 2.5" M' 15.770
Urugan Tanah Kembali M3 3.250

INDEKS VOLUME
NO DINDING PENAHAN TANAH ITEM PEKERJAAN SATUAN
PER METER'
1 DPT TINGGI 7 M Pasangan Batu M3 13.660
Beton K-250 M3 1.168
Besi U-24 KG 127.048
Urugan Pasir M3 0.170
Galian Tanah M3 7.438
Pelesteran tebal 3 CM M2 1.540
Pipa Sulingan PVC 2.5" M' 17.090
Urugan Tanah Kembali M3 3.500
Sketsa PANJANG DPT 1.00 M
Segmen Dimensi Jumlah panjang batang berat volume
Pas. Batu Kali
20
10 0
60 40 59

100
BESI U-24 (KG)
1 16 5 3.62 1.578 28.56
13 5
3 00 100

PVC SULINGAN Ø 2.5"


40
155 100
20
Plesteran tb. 3 cm 20
1 50

22 0 100

3 00 2 45 100

2 16 5 6.18 1.578 48.76


40
100
20 27 0
20
2 60

100
3 40

370

Ø 16 - 20 20

15 0

10
60

70
60

4 0 20
Ø 12 - 20
Ø 10 - 20/40

50 0
4 40
60
10

Ø 16 - 20
3 16 5 5.1 1.578 40.24
4 12 59 1.04 0.888 54.49
5 10 63 0.64 0.617 24.88

1 0.54 2 4.94
0.05 0.54 0.54
1.44 0.54 0.08 0.08
0.08 4.94 0.08
0.66 3
0.34 4
0.05 0.94 0.05
0.05
5 0.54
0.05 jumlah 196.93
DPT 7.5 0.9 DPT 8 0.9
1 1
1.2 1.2
1.5 1.6
1.7 1.7
1.9 1.9
2 2
2.4 2.5
2.7 2.7
2.9 2.9
3 3.1
21.2 21.5