ACHGIEVEMENTS OF CONSULTANCY ORGANISATION OF CPWD FOR THE YEAR 2004-2005 ANNEXURE-10

Sr. NAME OF WORK IDENTIFIED CLIENT COST Target ACHIEVEME CUMULATIVE REMARKS
No. FOR THE YEAR (Rs. IN for the NTS DURING ACHIEVEMENT
LAKHS) year THE DURING THE
QUARTER YEAR in %
In %

1 2 3 4 5 6 7 8
1 GTB Hospital Project at CE PWD All Structural Design of Library issued. Structural
Shahdara, Delhi (Zone III) sizes of Auditorium sent to SA (DGHS) Final
(NCTD) architectural drawings awaited.
a) Library block 190 -- - -
b) Auditorium EE-I - 90 - -
2 Office Bldg for National Centre for CE(NDZ) 337 50 50 100 Architectural drawings issued by SA-XII. All the
Agricultural Economic & Policy III structural drawings including water tank issued.
Research (NCAP) at Pusa, New
Delhi – Structural Design
EE-II

3 Nuclear Science Centre, New CE(NDZ) 800 10 100 100 Architectural, Structural drawings for all buildings
Delhi(Ph. II) Arch Planning & III issued.
Design and Structural Design
EE-II,/ Arch
4 SFS Flats for DDA at Motiakhan, DDA 400 25 5 95 Structural Drawings for columns, Stair case, slabs
Delhi (12storeyed) Str Design issued & beam drawings upto level 11 issued
EE-II

5 Pucca School Bldg at Vasundra CE Zone 263 15 15 DE issued. Part foundation design issued. Other
Enclave, Delhi EE-I II (NCTD) Structural design work is also in hand. Consultancy
charges not yet received.
6 Pucca School Building at J & K -do- 480 55 - 10 Detailed Estimate already sent.
block, Dilshad Garden, Delhi.
EE-I
7 JNV at Madhapura, Bihar (Ph. B) NVS 285 - - - Work completed Revised LOP & Str drgs issued.
EE-II, Arch Fee awaited