You are on page 1of 4

CURRICULUM VITAE Eng Suraj Singh s/o Late Shyam Lal Page 1 of 4

PROFESSIONAL ENGINEER INDIA


RC BUILDINGS/ STRUCTURES
Indian- born 30.1.1955,
Permanent Add : 3373, Delhi Gate, New Delhi 110002, 0091-11- 3261748 (residence), 0091-9810088592 (mobile)
PP-A 8962688/Abu Dhabi/22.5.2001-21.5.2011 <sunlion44@hotmail.com>
http://www.geocities.com/suraj_engineer
http://www.geocities.com/rccbuildings

Table 1 Applied For Project Manager/ Agent/ Coordinator/Designer


Training Institution Year Valuation Remarks
Programme
Professional Institution of 2nd March 1995 Profession of PE 28
Engineer’s Engineers India Engineering
Certificate Expertise
Chartered Institution of 1986 Corporate M 046231/9
Engineer’s Engineers India Membership
Certificate MIE
Section A & B Institution of Section A 1979 60% Bachelor
Civil Engineers India Section B 1980 Degree in Civil
Engineering 64% Engineering
3 Years Civil Board of 1974 75.5% First Division
Engineering Technical with Distinction
Diploma Education Delhi
Table 2
Subjects Studied Diploma
English, Maths, Physics, Chemistry, Engineering Materials,Engineering Drawings & Laboratories, Electrical
Engineering,Mechanical Engineering, Strength of Materials, surveying, Hydraulics, Engineering & Mech Drawing, Labour
Relation & Civics, Carpentry, Fitting, Heat engines, Electrical & Welding shops, Civil Engineering laboratory, Strength of
Material Lab, Hydraulics Lab, Estimation & costing, Applied Mechanics & Strength of Materials, Overseers Duties &
Accounts, Details of Construction, Drawings & Detailing (Civil), Public Health Engineering, Irrigation, Road railways &
Bridges, Surveying, Tours, Viva Voce all subjects including Erection & Construction Plans
Subjects Studied Degree
Math I, Math II, Applied Mechanics & Strength of Materials, Modern Physics, Applied Thermodynamics, Elements of
Electrical Engineering, Drawings, Material Science Processes, Social Science
Period of one session for the clearance from the Referee to join section B
Theory of Structures, Construction & Foundation Engineering, Fluid Mechanics, Surveying, Structural Designs, Water
resources, Applied Geology, Railways
Self continuing education
Town Planning & Architecture, Multi Storied RC Frames, Dissertations on Building Frames, dissertation on new style of
structural & Architectural Designs, new concept on RCC foundations for various levels of buildings
Computer Literate in Lotus 123, MS Words, MS Excel, Power Point, MS Project, Auto CAD-14
CURRICULUM VITAE Eng Suraj Singh s/o Late Shyam Lal Page 2 of 4

Table 3
PROFESSIONAL PRACTICE
Research & Development
Civil Engineering Building Practice –Containing Project Management, State of the Arts Contracts, New Site
Schemes, Structural Profiles, swimming Pools, Baths, Engineer in Law with Statutory References
Manuscript Preparation 1990-1994 Published in 1996
Civil Engineering Building Practice- Containing 55 # Home Plans with isometrics
In 4 directions, 700 sketches - Manuscript Prepared 1994 Not published Yet
Applied Spiritual Numbers 0-9 & Luck Published in 1998, a new concept of number based formations to
anticipate the time effect spiritually
SPECIALISATION
Execution & Administration of high profile projects –RC Structures
Commercial, Educational, Army, Residential, Petrochemicals
Planning schemes-Office Engineering-Site Engineering
CONSTRUCTION INDUSTRIAL PRACTICE - 24 Years
13 Years Middle East-(Iraq 2, Libya 2, Qatar 5, UAE 4)
11 Years India ( Consultancy 5, Local Body 6 )
Practice Details
MIDDLE EAST
Abu Dhabi UAE- Al Jaber Energy Services PO Box 47467,
Ruwais Tel 8760011, Fax 8760035,
Bourouge Petrochemical Project-contracted by Alliance Bachtel Linde-Civil
works executed by Al Jaber Energy services for 600 KTA Ethylene Plant
Project Office Engineering Incharge for 600 KTA Ethylene Plant- Joined
31.10.1999 – Project Completed 2/2002- (Worked on project 2.5 Years)
About 85000 cum of structural concrete in massive, thick and normal
structures
For off sites, pipe rack, compressors, boilers, wash waters, cracked gas,
sumps, pumps, tanks, sub stations & other buildings etc.,
(complete 600 KTA Ethylene Plant)
Project Office Engineering Incharge concerned with Site Technical Queries,
Method Statements, Coordination, Material Approval follow ups,
Engineering matters, Rebars, Correspondence, Designs proposals,
landscape, Red lines etc, all as required by Project Director/Manager
Abu Dhabi-UAE-Khalsa Contracting & Trading co PO Box 25231
Chief Engineer- 26.12.1996 to 5/1999 (1.5 Years)
Qatar-MID MAC Contracting PO Box 1758-Doha
Project Office Engineer- 9/95 to 9/96 (1 Year)
Qatar-Al-Attiyah Contracting & Trading Co PO Box 681-Doha
Contractor’s Project /Site Agent - 4/1985 to 3/1989 (4 Years)
Libya-Electrical Construction co-A Joint Venture Governments of India & Libya
Civil Engineer-Project- 4/1983 to 10/1984 (1.5 Years)
Iraq-Ansals,Eurodec & Associates, Sitac,
CURRICULUM VITAE Eng Suraj Singh s/o Late Shyam Lal Page 3 of 4

Junior Project Engineer, Site Engineer, Senior Site Engineer,


Project Manager
6/1981 to 2/1983 (2 Years)
WORKS CARRIED OUT DURING CAREER
Khalsa Contracting & Trading Co – Chief Engineer
E 41/C61 G+M+4 Typical-Late Butty Abdulla Butty Al Muhairy
7 million, 12 months-Eng Ardent for DSSCB- Sheikh Khalifa Committee
E 19/02/C 66 G+M+2 Typical- Mohd shutait Al Khaily
4.89 million, 12 months-Eng Arab Office for Planning & Architecture headed by Dr Mclouf for DSSCB-
Sheikh Khalifa Committee
E 40/C 13 G+M+4 Typical- Mohd & Hamad Bin Salem H. Harby Al Ameri
6 billion, 12 months-Eng Al Kheari & Al Ameri Consultants Engineers for DSSCB
Wadi Al Fill-Nahel Town, Al Ain –PWD Kinder Garten Typical (Partly by me)
8.59 million, 18 months-Eng Al Burj Engineering Consultants
Villa , Plot #134, W 47, Abu Dhabi –Late Butty Al Muhairi
1 million 12 months- Eng Ardent for DSSCB-
E 19/02, C 76/77, G+M+2 Typical- Khalifa Ubaid Al Farisi
4.6 million 10 months-Eng Al Ain Consultants Engineers for DSSCB
Other than the control of the aforesaid works, as chief engineer coordinated technical , contractual aspects,
prepared many tendering bids & acted as an expert adviser to the management
Mid Mac Contracting- Project Office Engineer
ROS Verifications for civil works for LNG tanks 4 #s, 85000 cum capacity each
At Ras Laffan site assisting Chief Engineer
Complete Engineering Control for Beach Villa/Palace Project in 10 hectares
Job Description-Review survey activities, Issue all technical documents, coordinating design activities, shop
drawings follow up, shop drawing preparation, civil works specification preparation and procedures, keeping
& analyzing progress record, coordinating & verifying changes to Engineering schedules according to
construction needs, coordinating the issue of As Built drawings, making technical evaluation of vendors and
subcontractors
Al Attiyah Contracting- Contractor’s Site Agent
Landscaping of 5 schools-Hard landscape included sports courts surfacing for Tennis, Volley ball, Hand ball,
etc Soft landscape included tree pits, grass areas etc. Also included fencing, screen walls, foot path &
infrastructure works of minor nature such as plants irrigation, benches, kerbs, water tanks
Boys preparatory school at Umm Salal QR14 million –Qatar Consultant Group for AED (Architectural
Engineering department)
13 class rooms, 1 assembly hall 18 m span, workshops, lecture room, library, physics & chemistry labs,
darkrooms, plant rooms, facilities, mosque, guard room, long boundary wall, external works, courts surfaces,
pergola
Building comprised RC framed structure and high class finishes, centrally air conditioned using package
units, chillers, Air handling units and the duct system
False ceiling mineral fiber, metallic aluminium, Electrical system included fire alarm, call bell, auditorium
speaker system, external flood lights, Plumbing included CW, HW & CHW, vulcathene injected PVC gas
pipes in laboratory.
External included sewerage, water supply, fire fighting, plant irrigation, electrical, telephones, mosque, sub
station,
Barzan Army Camp development Ph II for 2nd Royal Guard (85% completed )
27 million QR-Rice Perry Ellis & Partners 18 months for Army Works Engineering Unit
Firing/Shooting Range indoor & Outdoor, 300 m , 3 shooting position from main administration & office
building,2 #s 300m long RCC baffle walls, Bullet Trap Chamber, Target Pits, Over head gantries on
structural steel trusses supporting armoured plates shielded by WP Hardwood cladding, main office building
ac
Upright walls of the Bullet Trap chamber retained dune sand both sides to protect soil fill to dampen bullet
velocity
Sports Facilities Building containing 2 # sports halls(Indoor Gymnasium), 4 #s Squash courts., Changing
rooms, lockers rooms,Spectators gallery, cafeteria, as RC /Structural Steel composite structure converted
from an existing garage, swimming pools 25x13mx3m deep for competition purpose with balance tank, filter
room for 10 tones, chlorinators, acid chambers, pumps for water recirculation, surface scum out drains,
underwater flood lights, Belgium poolside carpet Lano greenfield, aluminum cladding cover over the
building , games field, minor structures,such as pump house, netstores, pitch equipment stores, kick about
CURRICULUM VITAE Eng Suraj Singh s/o Late Shyam Lal Page 4 of 4

area, stadium enclosures, football pitch, pergolas, 12m & 18 m high light poles, chain link fencing, lift, sports
surfacing, such as Tennis, handball, volley ball, football pitch
Squadron Offices, Officers Quarters
RCC structures with all high profile finishes, in many areas epoxy floor, domestic swimming pool 14x7m, all
rooms air conditioned
Assisted for the contracts claims, contractual matters correspondence, tendering
Electrical Construction Company- Project Engineer
Construction of 4x2 KVA diesel power station Standby unit-Air base project at Al Gordhabia, Sirte
Town-Designer SACM France
Alternator cum Generator bases massive RCC foundations, generator foundation isolated from raft by
vibration isolation using Neoprene pads fixed on steel plates connected to RC raft by steel nails, pads
surrounded by extruded polystyrene further covered with polythene sheet, over placed a site fabricated steel
frame lamina co
The vertical surfaces isolated by covering with polystyrene, neoprene (double course at corners in triangular
shape) and polythene. The generator and isolator foundations were provided with bolt grooves 16 & 6 #s 1.5
m deep to be grouted post m/c erection. Cable trenches around foundations for HV/MV. The foundations to
the structural steel frame were RCC footings of massive/thick element size & grooved in for anchor bolts.
Overhead gantries were provided in the building. Fuel oil tanks, sump tanks, radiator foundation etc were
also constructed. Area was rock lime sand. Bulldozer with ripper was used for mass excavation for the
building area, storage oil tanks. Ready mixed used for concrete with pump
66/11.5 KV Sub Stations 16 #s – Foundations in Benghazi
Sitac- Senior Site Engineer
Construction of pump houses at Mehmodia Baghdad-Clayey soil in high water table-used Miller pump ring
system of well points in 3 levels to achieve 9 m deep excavation dry
Eurodec & Associates- Project Site Manager-Senior Site Engineer
Construction of Tower portion involving 5000 cum structural frame concrete-Dar Al Thawra Press Complex
from 4th floor terrace to 65 m elevation. Each slab 500 cum poured in 21 days cycle using reciprocating
stationary concrete pump and batching plant. Finishing items carried out in sequence on the lower floors-On
the facets of the tower fair face concrete –Marine ply used for forms- Day and night work for months
National consulting Bureau –Supervised by Iraq government engineers
Ansals-Grain silos –Shirkat-Junior Project Engineer
Construction of ancilliary buildings(Finishing items only) –staff quarters, workshops, weigh bridge foundation,
administration building
India
Headed M/S SKY ASSOCIATES-Building Engineering group 5/89 to 95
Prepared Schematic Plans for a proposed Town to accommodate 500,000 inhabitants in National Capital Region of
India-estimated cost to 1991 rates IR 60 billions- Client-Proprietor Badri Narayan / BM Promoters-2 nd floor, 1186, Bhagwati
Market, Kucha Mahajani, Chandni Chowk, Deli 10006
Preliminary Schemes, System Designs regarding Structural & Architectural disciplines, Management aspects,
dissertations- Due to the unsuccessful funding, the scheme shelved –Area-Prithala to Palwal –6000 acres approx.
Delhi Development Authority- Junior Engineer
Supervised the construction of shopping centers, dwelling units, development works such as pavement, drains, toilets,
garden walls, pipe lines, in resettlement colonies, survey on the environmental improvement schemes, estimation and
quantities, valuation, planning and coordination
Contact Reference- <sunlion44@hotmail.com>
3373, Delhi Gate, New Delhi 110002 India, 0091-11- 3261748 (residence), 0091-9810088592 (mobile) )
sunlion44@hotmail.com
http://www,geocities.com/suraj_engineer

Eng Suraj Singh Month 3 Day 24 Year 2002


Professional Engineer India
Permanent Address
3373, Delhi Gate, New Delhi 110002, India
Ph 0091 11 3261748/ Mobile 0091 9810088592

You might also like