You are on page 1of 3

Create activity network for Weather Forecasting System.

The Shirpur Education Society’s


R. C. PATEL POLYTECHNIC

A MICRO-PROJECT PROPOSAL
Academic Year 2022-23
Class & Branch Second Year Computer Science
Semester Forth
Name of Subject Software Engineering
Title of Micro-projectCreate activity network for Weather
Forecasting System
Name of Group Members 1. Jadhav Akshay Ravindra
2. Ketansing Hemraj Patil
3. Kunal Nana Khaire
Name of Guide Prof. N. R. Bhamare

CONTENTS:
1. Brief Introduction to Micro-Project
A Telephone Billing System is a software application that is designed to manage the billing
and payment process for telephone services. It allows service providers to track the usage of
their customers and generate bills based on the amount of usage. Java's built-in database
connectivity APIs, such as JDBC, can be used to connect to a database and store customer
information and usage data. The system can also include basic security measures, such as
authentication and authorization, to ensure that only authorized users can access the
system and its data.
2. Aim of the Micro-Project
This Micro-Project aims at:
1. Designing and implementing a database to store customer information and call details.
2. Developing a user interface that allows customers to view their bills and call details.
3. Implementing billing algorithms to calculate charges based on call duration, time of day,
and other factors.

3. Intended Course Outcomes of the Micro-Project


i. Select Suitable Software Process model for Software development.
ii. Draw the activity network for the given task.
iii. Use software modeling to create data designs.

Computer Science Department -1- R. C. Patel Polytechnic


Create activity network for Weather Forecasting System.

4. Literature Review
Developing activity networks for weather forecasting systems using UML activity diagrams.
methodology for developing activity networks for weather forecasting systems using UML activity
diagrams. The authors demonstrate the utility of the approach using a case study of a weather
forecasting system for a region in Algeria, and show that it can help to improve the software
engineering process by providing a clear understanding of the system's requirements and
functionality. activity networks can be a useful tool for software engineering in the context of
weather forecasting systems. By providing a clear visualization of the various tasks involved in the
development process and their dependencies, activity networks can help to improve the software
engineering process and ensure the successful delivery of a weather forecasting system.

5. Proposed Methodology
The first step in developing an activity network for a weather forecasting system is to identify the
system's requirements, including the data sources, the types of weather data to be collected, the
forecast accuracy and resolution, and the methods for displaying and disseminating the forecast
information. Using the information gathered in the previous steps, a network diagram can be
created to visualize the various tasks and their dependencies. The diagram should include nodes
representing the tasks and edges representing the dependencies between the tasks.

6. Resources Required
Sr. Quan
Name of Resource/Material Specifications Remarks
No. tity

1. Processor Intel 1

2. Primary Memory 4GB RAM 1

3. Operating System Window 10 1

4. Computer system HP 1

5. Software MS Word 1

7. Action Plan
Planned Planned Name of
Sr.
Details of activity  Start Finish Responsible Team
No.
date  date  Members 
1. Project Selection Discussion of various Project 02-03- 02-03- Jadhav Akshay

Computer Science Department -2- R. C. Patel Polytechnic


Create activity network for Weather Forecasting System.

Ideas, Project Topic Selection & Group Ketansing Patil


Nomination 2023 2023
Kunal Khaire
Problem Identification & Concept Discussion of Jadhav Akshay
2. Project scope, Abstract Writing, Decide Modules, 05-03- 05-03-
Ketansing Patil
etc. 2023 2023
Kunal Khaire
Project Planning & Scheduling Team structure & Jadhav Akshay
Work Distribution 09-03- 12-03-
3. Ketansing Patil
2023 2023
Kunal Khaire
Project Concept Demonstration Prepare a Jadhav Akshay
Presentation & present the same 12-03- 19-03-
4. Ketansing Patil
2023 2023
Kunal Khaire
Literature Review Project related data collection Jadhav Akshay
5. & study of similar existing system with their 19-03- 26-03-
Ketansing Patil
Drawbacks, etc. 2023 2023
Kunal Khaire
Requirement Analysis Minimum Hardware & Jadhav Akshay
Software Requirement 26-03- 02-04-
6. Ketansing Patil
2023 2023
Kunal Khaire
Design-I Algorithm design, Flow design Jadhav Akshay
02-04- 09-04-
7. Ketansing Patil
2023 2023
Kunal Khaire
Testing Preparation of Test plan with focus on Jadhav Akshay
8. Test Responsibilities, Prepare various Test Cases, 16-04- 27-04-
Ketansing Patil
Tabulate Test Results 2023 2023
Kunal Khaire
Results Record the results (tabulate/ Prepare Jadhav Akshay
9. appropriate charts) Capture every possible 04-05- 14-05-
Ketansing Patil
Snapshot of the final execution of project. 2023 2023
Kunal Khaire
Seminar Presentation, viva-vice, Assessment and Jadhav Akshay
02-03- 02-03-
10. Submission of Report Ketansing Patil
2023 2023
Kunal Khaire

Computer Science Department -3- R. C. Patel Polytechnic

You might also like