You are on page 1of 10
[CONTRRGTOR: ENGEER [DORSCH INTERNATIONAL CONSULTANT Manasrah Contracting | mbt Corporation ~~ Water Supply for Syrian Refugees Phase ill Wastewater) ‘Construction of Wassewater Collection System in Menshyet BaniHassan | em y ! ‘co02senivac N*15:2015/SW Drawing/Document Transmittal Form “Treen NocOTFMBHZOTTSSS7 [Dat 1-05-17 Resp 8400 From: Hansen Contacting Corporat | To: Dorsch Gontitant | At Enginoer Ty Dooment Gass |] FrstSvbrisson |[C)Seconé submission | C) Further Submission Prous SubnitaRe [secret at Seo Dosim Ne Descrinvon tv [cons | caehlien aa Mathod Statement for Main a | Ms.mpr-2017-0021 | Meet ere | | t | B L { A - 4 zi | 6 | | 7 I THiS SUBRATTALINTENDED FOR 11) Approvai/comments [) As peryourRequest () Your nformation/Records ()_YourNecessaryActlon FOR CONTRACTOR "Namo: Eng. Samech Ghani peter tes 1915 12 aie rele ia SO pate: 1915/21 FOR ENGWEER “is SUBMITTAL INTENDED FOR Accepted (A) ecpted Sujesto Comments (8) ‘rcaparate Comments esubmt bore proceedng(c) Net Accepted (0) ‘comments: > > : > a: Sion: ate Pectin DrrawsH.2017 53576 ‘Westnasay, May 17,2017 Water Supply for Syrian Refugees — Phase il (Wastewater) Cconetructin of Waetowater Collection Sytem In ‘Manshyet Bani Hassan. Contract N°15/2015/SW CONTRACTN® ‘s20158W METHOD STATEMENT FOR IKENV | ain Force Line Prossure Tost (a: Messe Page: of 7 MINISTRY OF WATER AND IRRIGATION | Water Supply for Syrian Refugees Phase Ill (Wastewater) Construction of Wastewater Collection System in ManshyetBani Hassan ‘Contract N° 15720155 METHOD STATEMENT FOR Main Force Line Pressure Test ‘CONTRACTOR: ENGINEER: DDORSCH International Consultant GmbH ‘Manserah Contracting Corporation Vater Supply for Syrian Refugees Phase ill (Wastewater) Construction of Wastewater Collection System in ‘Manshyet Bani Hassan seat ® Contract N° 15/2015/SW TTLEP essere IKFW | ain Force Line Pressure Test REVISION RECORD This cover page is a record off al revisions of the documents identified above by number and tile Al previous cover pages are hereby superseded and are tobe destroyed. Rev.| Date | By ‘Chocked Approvals HR | DeveriPtion 2nd Page Numbers of Eng Saree 00 frr-osaor7 | Re.oe® | Ghanim ‘YM tssue 6 Pages FoR COMPANY: 8, i) “cy (wy Accented LJ Aceated Subject] In eorperats Comments CNet Accepts Tocomments eral before Prosedng ‘cowrracror: ENGINEER: - - DDORSCH International Consultant GmbH Manasrah Contracting Corporation Manshyet Bani Hassan Water Supply for Syrian Refugees: ] Phase Ill (Wastewater) | contRacTN ‘Construction of Wastewater Collection System in || Contract N*15/2015/8W0 Main Force Line Pressure Test 4. Purpose Scope 3. References pimce: ee METHOD STATEMENT FOR | CONTENTS 4. Definitions 5. Responsibilities | 6. Equipment | 7. Procedure ‘contRacTOR: | ENGINEER: DORSCH International Consultant GmbH Manse Contacting Corporation Waa Sup for yan Ratuaeas hace ecowate) conreacre Conseuton ef Vtawat Cotecton Sytem n Manshyet Bani Hassan sae D Contract N° 15/2015/SW TLE: Ref. No. sH-2017.0021 eT#oD staTEWeNT FOR =a IKFW | tain Forco Line Prossure Tost [faz 7287 1. Purpose ‘The purpose ofthis method statements to make sure that pressure testing of main force pipeline is done safely as pr requirements and applicable standards 2. Scope ‘This method statement covers the Pressure testing of HDPE Pipeline atthe project 3.References = Special Specifications = General Specifications 4.Definitions: Lt Employer: Ministry Of Water and Inigation. 12 Engineer: DORSCH Intemational Consultant GmbH 13 Contactor: ‘Manasrah Contracting Corporation 14 PM: Project Manager. LS CM Construction Manager. 16 MS: ‘Method Statement 17 MAR: “Material Approval Request 18 TTR: Inspection and Test Request. 19 QcP. Quality Control Procedure Lio TP: Inspection and Test Plan LU RA: isk Assessment. uz mL Independent Testing Laboratory. ‘CONTRACTOR: ENGINEER: DDORSCH Intemational Consultant GmbH Manasrah Contracting Corporation Es Manshyet Ban! Hassan Contract N°15/2015/SW THLE: Ret Mo: MS-MBH.2017.021 Rev. N00 Date 171082017 Page: Sof 7 METHOD STATEMENT FOR Main Force Line Pressure Test ‘Water Supply for Syrian Refugees Phase ill Wastewater) ‘CONTRACTN® Construction of Wastewater Collection System in cane 5. Responsibilities ‘The Project Manager: is responsible forthe entire project, organizing the various professional people working on a project, carrying Out risk assessment, ‘making sure that all the aims ofthe project are met, making sure the quality standards are met, overseeing the accounting, costing and billing also he is the contractor representative. ‘The Site Engineer: is responsible for ensuring thatthe work is carried out as indicated in the shop drawings and method statement, day-to-day management of the site, including supervising and monitoring the site labor force, overseeing uality control and health and safety matters onsite, preparing reports as required, Position Full Name Project Manager ‘Sameeh Ghanim Site Engineer ‘Sami Shdeifat 6. Equipments: “Pump 33/45. Temporary blocking. ~ Air release valves, ‘CONTRACTOR: ENGINEE! DDORSCH Intemational Consultant GmbH. Manacrah Contracting Corporation 1 Wat app fr yan notin ‘ines sonmnene & | niesinsaron| METHOD STATEMENT FOR _IKENV | __ main Force Line Pressure Test Rev. te. 00| 7. Procedure: © General: = Prior to the tests, steps shall be taken to ensure the safety of people. - For the pressure testing, the system under test will be isolated from the source of pressure after the test pressure has been reached. - Any reduction in pressure during the strength or tightness test holding periods, any visual leakage or any permanent deformation shall be cause for rejection. = The test will be carried out in the presence of the Engineer. ~The test will be applied by a suitable pump equipped with connection valves and gauges. '¢ Execution: = Provide temporary blocking, bulkheads, flanges and plugs as necessary to assure all new pipes, valves and appurtenances will be pressute tested. - Before applying test pressure, completely expel air from the force main, using air release valves, to expel air as line is filled with water. r a Jenner | onschtumatend Cretan ei Manasrah Contracting Corporation i} | Water Supply for Syrian Refugees een Eocene ee eee eee ‘Manshyet Bani Hassan = rece ncl : Lie Ref. No. : MS-MBH-2017-0021 Rae IKFW | tain Force ine Prossure Tost [2am 1/0287 - Fill pipeline slowly with water. Uslize an accurate water meter and pump arrangement to pump th line to the specified test pressure. ~ Measure test pressure atthe lowest point in the test segment. During pressure testa minimum of 1.5 times maximum allowed operating pressure. - The pump provided pump 33L/S, height 45 meter ‘According to that: 45 .S bar 1,5 times: 4.5 x 1.9 = 6.75 bar ~ 7 bar + Maintain test pressure for an one hour. - Provide an accurate pressure gauge to provide 8 bars pressure. ‘CONTRACTOR: ENGwet DORSCH Intemational Consuitent GmbH h Contracting Corporation Site Test Procedure {for Pressure HDPE ee Selec length tobe tested ‘Test Preparation -————— Till with water ‘Repar the main Ts any ar left in the Empty the| main? main T Purge No the air Find the Pressure nut) Newative ae Suny Syn Rete Peso Vntws ‘ain Donate SES SER cabeton Som ashe Bel ass ‘Were ppus wih flexible ons are required tobe lito curves, the deflection ot any joint as Toe stot not exceed thee-quarars of the maximum deflection recommended by the rmanufacuet, 44106 Sealing of Ducts Ducts for cabies and smal pps shal be sealed against the ingress of moisture and vein pos te eae or pipe inaaitonf completo. Ducts shal be sealed to prevent te Ingress GF got where one side of tho duct i located in @ zoned hazardous are, of where @ ‘dangerous gee could bo present ‘ucts must be sealed in sucha way a fo ake possible to breakout he seal in he future ‘whol maging the services within 44195 Pressure Pipes Pipe work matorel shall be appropiate for te media being cared. Pumping msi and posture pipes shal be ratd or atleast PN 16 ‘The Coniradr shal vse tho Enginaer at leat fve working days por to the pressure {ects and sal provide nd maunt all necessary equipment forthe pressure tet Prestute tats made ageinet closed vaies shall flow the guidelines from the vale ‘anulacurer regarding tis rghost sng ede pressure allowed Hydraulic peessure fst shall be carod out by tho use of potable water. ae of 1.5 tins maximum slowes operating pressure shal be ‘tore proszute tests have been false the Contractor shal produce a report. # copy of ‘hich eal be submited othe Engineer. Therepart shal es @ minimum incude: Pressure Test Process, Unambiguous references to piping pat f piping and shutoft, Specitcton of tet pressure; “The pore fhe pressure tots; ‘Renu ond slgnature of acceptance | description of any flues, thelr causes and proposed corectve action. 44498 Flanges and Gaskets ‘tages must be raed for PN, and ied econ to BS AED (PN, 16) and BS EN 10822. Gaskets for flanged pipe ts sha be of te ise-bat-crde ype. The dimension of SaaS than comply with BS EN 1514-1, Gaskets shall be manufactured from materi Eman wih te prove of BS EN 6-1 Type WA ins. FRanges fo ates se! pipes sal bo ofthe wel-on type in stiles lel of sla, oes ne spa. Aesrave, waking neck tgs an oose anges of tans el ‘nay be used ansoc9

You might also like