You are on page 1of 2

MPSS MAJU ENTERPRISE

No 3, Kampung Jeram, Merbau Pulas, Kuala Ketil, 09300 Sungai Petani, Kedah
H/P: 016-5360234
E-Mail Address: geethasasigeethasasi113@gmail.com
ATTN: PESAKA TECHNOLOGIES SDN BHD DATE: 14.12.2022
LEVEL U1, MENARA YAYASAN TUN RAZAK, VALID DATE: 14 DAYS
200 JALAN BUKIT BINTANG, 55100 KUALA LUMPUR.

RE: TO SUPPLY AND INSTALL OF ONE NOS OF TUBEWELLS WITH WATER YEILD
500 TO 1,000 GALLONS PER HOURS
THANK YOU FOR YOUR INQUIRY. WE ARE PLEASED TO SUMBIT OUR QUOTE AS
FOLLOWS:
ITEM DESCRIPTION PRICE
RM
1.TO DRILL AND SUPPLY 1 NO. OF TUDEWELL TO REQUIRE DEPTH
WITH 150MM U PVC PIPE AS SCREEN AND CASING (CLASS D 6’’)
INCLUDING GRAVEL AND CEMENT PACKING, DRILLING DEPTH RM47000.00
THROUGH ROCK FORMATION AT LEAST (30~100) METER
2.BOREWELL PUMPSET RM3700.00

3.AHS 04\04 (1HP) – SINGLE PHASE HORIZONTAL RM2500.00


MULTISTAGE CENTRIFUGAL MONOBLOCK PUMPSET
4.AQUAMATIC PUMP CONTROL RM500.00
5. 2.5MM FOUR CORE ROUND CABLE RM1200.00
6.BOREWELL CABLE JOINT RM40.00

7. SAFETY PANEL OUTDOOR 5HP, PANEL TO TANK CABEL 100M,


FLOAT SWITCH, PLUG POINT 13A, 3 PHASE MAIN CABLE 16MM RM7600.00
50 METRE, EARTHING, CONNECTOR, AND WORKMANSHIP
8. 500 GALLON 2 TANK, BASEMENT 10’’ * 14’’ *6INCH, INSTALL RM6800.00
PIPE 32MM AND WORKMAN SHIP
TOTAL AMOUNT(RM) RM69340.00

1.TERM OF PAYMENT 50% ADVANCE 50% PROCESS PAYMENT


2.TIME OF COMPLETION
WITHIN 4 WEEKS PER WELL.
NOTE: WE WILL NOT GUARANTEE THE WATER THE WATER QUALITY

AND 50% SHOULD COMPENSATE TO US IF FAILURE TO OBTAIN WATER


BY 2 TUBE WELLS
ADDITION DRILLING WILL BE CHARGED FOR 20% PAYMENT WITH
REQUIRE OF CUSTOMER ONLY

APPROVED & ACCEPTED BY:

(COMPANY CHOP & SIGNATURE)


NAME:
DESIGNATION: