Professional Documents
Culture Documents
Stairs (March)
Stairs (March)
LINE
GROUND FLOOR CEILING
8.19
7.78
GROUND F LINE
1 STAIR DETAIL
P-3 SCALE 1:100 MTS
REPUBLIC ACT 545 SECTION 25(4) PROJECT TITLE/LOCATION,ETC. OWNER SHEET NO.
DESIGNER Drawing and Specification duly
signed,stamped or sealed as
instrument of service are properties
of the Author whether the object for Proposed Two-Storey R-1 Shalenie May
which they are made is executed or
not .It is unlawful for any person, Building/Consolacion Cagayan de P. Bombeo P-3
Gene Bril S. Bactong
PRC No. Validity
without the writer consent of the
author of the said document to Oro, Misamis Oriental
18
IAPOA No. O.R. No. Date duplicate or copy for use in other
PTR No. DATE projects, whether executed partly or
Place TIN in whole