Form Ref A 4ia

Date 18/11/2019
TRAVERSE TEST SHEET
Job Ref P-1819
P.O. Box 132764 Tel. 02 6656254 Fax: 02 6428007 Sheet 2 OF 3
Client : PIVOT Instruments used :BALOMETER
Project : APOLLO DC-1 Serial no. : 91219043
Consultant : SUDLOWS Calibration Date : 27-10-2019
Main Contractor : HUAWEI MEP Contractor : LAYITH ELECTRO MECHANICAL Calibration Due : 26-10-2020
Plant Reference : FAHU # P1-01 (SUPPLY AIR)
Location/Area Serving : GROUND FLOOR / POD-01
L>R 1 2 3 4 5 6 7 8 9 10

1 5.76 5.76 DESIGN

Design Duty 496 L/S


2 5.43 5.32
Design Velocity 1.73 m/s

3 5.33 5.14 ACTUAL

Duct Size 450 X 300 mm


4
Duct Area 0.135 m2
Actual Velocity 5.46 m/s
5
Actual Duty 737 L/S
Static Pressure 143 pa
6
Percentage 149 %

7 COMMENTS

10

11

12

REEFTECH MEP Contractor Main Contractor Consultant


Name : SHIBIN Name : Name : Name :
Signed : Signed : Signed : Signed :
Date : 18/11/2019 Date : Date : Date :
Form Ref A 4ii
Date 18/11/2019
AIR BALANCE SHEET - Terminal Job ref P-1819

P.O. Box 132764 Tel. 02 6656254 Fax: 02 6428007 Sheet 9 OF 14


Client : PIVOT Instruments used : ANEMOMETER
Project : APOLLO DC-1 Serial no. : 0253562
Consultant : SUDLOWS Calibration Date : 27/10/2019
Main Contractor : HUAWEI MEP Contractor : LAYITH ELECTRO MECHANICAL Calibration Due : 26/10/2020
Plant Reference : FAHU # P1-01 (SUPPLY AIR)
Location / Area Serving : GROUND FLOOR / POD-01
Sr. Size Area Design Initial Final
Location Comments
No. (mm) (m²) Vel - m/s Vol - LPS Vel - m/s Vol - LPS % Vel - m/s Vol - LPS %
POD - 1
GROUND FLOOR
1 IT ROOM - A 200 X 200 0.040 1.28 51.3 1.29 52 101 1.30 52 101
2 UPS & LV 200 X 200 0.040 1.94 77.6 1.18 47 61 1.64 66 85
3 UNPACKING R00M 120 X 120 0.014 2.55 36.7 4.10 65 177 3.30 48 129
4 DCIM ROOM 150 X 150 HOOD N/A 21.1 - 40 190 - 22 104
5 CORRIDOR 200 X 200 0.040 2.76 110.3 3.20 128 116 2.80 112 102
6 MMR POD-1 200 X 200 0.040 0.30 11.8 0.00 0 0 0.31 12 105
7 SECURITY ROOM 150 X 150 HOOD N/A 15.4 0.00 3 19 0.00 4 26
8 IT ROOM - B 200 X 200 0.040 4.30 172.0 1.00 40 23 1.30 52 30

TOTAL 496 375 76 368 74

REEFTECH MEP Contractor Main Contractor Consultant


Name : SHIBIN Name : Name : Name :
Signed : Signed : Signed : Signed :
Date : 18/11/2019 Date : Date : Date :
Form Ref A 4ia

Date 18/11/2019
TRAVERSE TEST SHEET
Job Ref P-1819
P.O. Box 132764 Tel. 02 6656254 Fax: 02 6428007 Sheet 2 OF 3
Client : PIVOT Instruments used :BALOMETER
Project : APOLLO DC-1 Serial no. : 91219043
Consultant : SUDLOWS Calibration Date : 27-10-2019
Main Contractor : HUAWEI MEP Contractor : LAYITH ELECTRO MECHANICAL Calibration Due : 26-10-2020
Plant Reference : FAHU # P1-01 (RETURN AIR)
Location/Area Serving : GROUND FLOOR / POD-01
L>R 1 2 3 4 5 6 7 8 9 10

1 4.78 4.61 DESIGN

Design Duty 395.6 L/S


2 4.62 4.68
Design Velocity 1.56 m/s

3 4.50 4.49 ACTUAL

Duct Size 400 X 300 mm


4
Duct Area 0.12 m2
Actual Velocity 4.61 m/s
5
Actual Duty 554 L/S
Static Pressure 126 pa
6
Percentage 140 %

7 COMMENTS

10

11

12

REEFTECH MEP Contractor Main Contractor Consultant


Name : SHIBIN Name : Name : Name :
Signed : Signed : Signed : Signed :
Date : 18/11/2019 Date : Date : Date :
Form Ref A 4ii
Date 18/11/2019
AIR BALANCE SHEET - Terminal Job ref P-1819

P.O. Box 132764 Tel. 02 6656254 Fax: 02 6428007 Sheet 9 OF 14


Client : PIVOT Instruments used : ANEMOMETER
Project : APOLLO DC-1 Serial no. : 0253562
Consultant : SUDLOWS Calibration Date : 27/10/2019
Main Contractor : HUAWEI MEP Contractor : LAYITH ELECTRO MECHANICAL Calibration Due : 26/10/2020
Plant Reference : FAHU # P1-01 (RETURN AIR)
Location / Area Serving : GROUND FLOOR / POD-01
Sr. Size Area Design Initial Final
Location Comments
No. (mm) (m²) Vel - m/s Vol - LPS Vel - m/s Vol - LPS % Vel - m/s Vol - LPS %
POD - 1
GROUND FLOOR
1 IT ROOM - A 200 X 200 0.040 1.15 46.2 0.75 30 65 0.75 30 65
2 UPS & LV 200 X 200 0.040 1.72 68.8 1.00 40 58 1.00 40 58
3 UNPACKING R00M 200 X 200 0.040 0.83 33.0 0.81 65 197 0.81 32 98
4 DCIM ROOM 150 X 150 HOOD N/A 19.0 - 53 279 - 20 105
5 CORRIDOR 120 X 120 0.0144 3.35 48.3 3.20 46 95 3.20 46 95
6 MMR POD-1 200 X 200 0.040 3.87 154.8 0.00 0 0 0.00 0 0
7 SECURITY ROOM 150 X 150 HOOD N/A 10.6 0.00 0 0 0.00 0 0
8 IT ROOM - B 200 X 200 0.040 0.35 13.9 0.00 0 0 0.00 0 0

TOTAL 395 234 59 168 43

REEFTECH MEP Contractor Main Contractor Consultant


Name : SHIBIN Name : Name : Name :
Signed : Signed : Signed : Signed :
Date : 18/11/2019 Date : Date : Date :