Note:
1. All support surfaces are on the same horizontal level; the elevation and
dimension errors shall be less than 5mm;
2. The foundation height of cooling tower h≥900mm. If it is in the same
water system as other cooling towers, the foundation height shall be
appropriately raised and the water level shall be kept in balance.
Attention shall be paid to the difference in foundation height between
different tower models. The specific height shall be determined according
to the outlet main pipe diameter and installation height.
3. The reinforcement of foundation beam shall be determined by civil YHW-3003RY×3
engineer.
Mark Date Foundation Drawing
4. Air inlet space of the cooling tower shall be reserved for 3-6m subject
to the tower models, and 1m space at least away from the side panel surface Drawn Date Tag Weight Scale
shall be reserved for maintenance. Designed Date