You are on page 1of 4

S Syed

Umer Bin Arif

Position: Business Strategist


Company: Conceptellers
Location: Lahore, Punjab, Pakistan
Experience: 8 years exp

Skills
5S Air Compressors ANSYS AutoCAD Automobile Business Process Improvement Catia

Combine Cycle Power Plant Commissioning Creativity Skills Designing Energy Engineering

Engineering Design Environment, Health, and Safety (EHS) Equipment Maintenance Gas Turbines

Gas Turbine Simulation Program Heat Exchangers Heat Transfer HRSG HVAC

Internal Combustion Engines Interpersonal & Leadership Machine Learning MATLAB

Mechanical Analysis Mechanical Engineering Microsoft Office Microsoft Project MS Project

Operations Management Plant Operations Power Plants Preventive Maintenance Problem Solving

Pro Engineer Project Engineering Project Management Project Planning Pumps Steam Turbines

Strategic Initiatives Team Leadership Teamwork Technical Presentations Time Management

Travel Management Turbines Utilities

Work experience
Mar 2019 - current time Business Strategist
Conceptellers
Leading Conceptellers' North Business Unit to achieve its short term as well as
long term goals through value addition and market penetration within and
outside Pakistan. My main responsibilities are given below; - Research, identify,
analyze, and execute new business initiatives. - Evaluate customer requirements
and business data to create a business plan. - Build strong relationships with
prospective clients for new opportunities. - Manage project teams to achieve
business goals. - Create business development strategies to increase the
company revenue and brand value. - Research the market trends to identify the
customer demand for the proposed products and services. - Contract
development, customer negotiations and product enhancements. - Review and
improvise the relevant business development activities. - Plan and conduct
creative corporate programs to enhance clientage value. - Work with internal
departments and external partners to execute business plans and strategies. A
short overview of Conceptellers is given below; Conceptellers is a group of
companies primarily providing EPC services and on-demand manufactured
products along with mechanical and industrial services. It has been grown into
multiple businesses which are mentioned below. Conceptellers Engineering
Division has many years of experience in developing Engineering requirement
for its valuable clients in the field of Pre-Engineered Buildings, Steel Structures,
Bulk Storage Tanks, customized machineries etc. Conceptellers Paint & Emulsion
division manufactures premium quality paints and emulsions of any BTO
specifications. The products formulated my Conceptellers are marketed under
the brand name of Beaulac. Conceptellers has launched home consumables
such as laundry, kitchen, toiletries and floor cleaners which are of high quality
and of international standard. These consumables are being marketed under
the brand name of Klinit.
Nov 2018 - Mar 2019 Mechanical Engineer (Power House & Projects)
Conceptellers
My deployment at Conceptellers Muridke Facility for a very short period of time
has boosted my technical and managerial skills. I was taking care of two
different departments which are Project Management and Plant Operations; a.
Hands on experience of Power House O&M contract including following
features; • 1 MW GE JGS320 Reciprocating Gas Engine with backup of 1 MW
Caterpillar 3512 Reciprocating Diesel Engine • Single pass fire tube boiler
providing 800 kg/hr HRSG to fulfil process steam requirement • 150 m3/hr
Cooling Tower to fulfil cooling requirements for two circulation circuits •
Multiple Pumps and Compressors Responsible to ensure smooth operation for
daily Engine start-up / shutdown procedure along with auxiliaries’ management
includes: • Load sharing / shifting between Wapda and Engines on DSE Control
Module through power factor management • Maintaining generation reports
and observing readings on DIA.NE XT (provided by GE) • Keeping boiler
operation smooth to avoid uninterrupted supply of steam and successfully
managing its troubleshooting • Planning and monitoring of preventive and
corrective maintenance if required within mechanical domain • Managing /
coordinating field services & mechanical maintenance jobs • Maintaining
rigorous HSE implementation to ensure safety of all individuals Project planning
and preparation for following new utilities: • 1.5 MW Cummins Gas Engine • 16
Ton fire tube boiler for new washing line • 120 Ton Absorption and
compression chiller for space cooling • 2 x 120 m3/hr cooling towers • 6 Ton RO
Plant for Chillers and Boiler b. Project Monitoring and Execution of
"Underground Tanks Fabrication". - Technical counselling for engineering
design and development - Managing fabrication of 04 X 48000 Liters and 07 X
25000 Liters UG Tanks. - Maintaining rigorous HS&E implementation - Successful
Third Party Inspection executed by Bureu Veritas _ March 2019
Sep 2016 - Dec 2018 Research Engineer
United States - Pakistan Center for Advanced Studies in Energy (USPCAS-E), NUST
a. Research Training at Arizona State University, USA, Jan – May 2018 • R&D work
at Thermo Fluids and Gas Turbine Lab for the development of; - Micro Gas
Turbine for CHP systems - Micro level steam generation for Steam Turbine -
Micro Heat Exchanger - Thermo Chemical Storage system • Industrial visits /
deputation to enhance professional understanding of power generation
technology - 620 MW Combine Cycle Gas Turbine Power Plant (CCGT), Tempe,
Arizona. - Gas Turbine Start-up and Shutdown Procedure - 392 MW Solar
Thermal Power Plant, Ivanpah, California. - 2080 MW Hydro Power Plant at
Hoover Dam, Nevada. • Entrepreneurship project to improvise energy efficiency
in Pakistan Trucking Industry at Engineering Wing, ASU. It was a project based
task and we were assigned to pitch our idea infront of jury and we won due to
uniqueness of this idea. b. Research Training at NUST University, Islamabad,
Pakistan, Sept 2016 – Dec 2017 • Research Internship at Attock Generation Ltd,
Rawalpindi. Understanding of O&M of HFO operated 9*16.5 MW Diesel Engines
(Wartsila 18V46) along with 9 HRSGs to run a 11.5 MW Steam Turbine (Peter
Brotherhood). The plant was responsible to provide 156 MW to government as
IPP. July-Aug 2017 • Semester studies along with multiple cases to deal with real
life issues such as establishing, implementing, maintaining and improving
energy management system for different power plants. i.e. Pinch Analysis to
recover waste heat of combine cycle power plant and incorporating utilities.
Sep 2016 - Oct 2018 Project Engineer
Conceptellers
Project execution and monitoring of on-going work on different sites for
following tasks; - Fabrication of Gas Stations Canopies and Industrial sheds
(around 50 thousands square feet) - Overseeing mechanical and industrial
services to Oil Marketing Companies to build and grow their Fuel Storage Depot
and Transportation system - Maintaining rigorous HS&E implementation -
Providing technical support for industrial services to different energy business
clients, mainly Oil Marketing Companies
Jun 2015 - Sep 2016 Jr. Executive Engineer
Yamaha Motor Pakistan (Pvt) Ltd.
Roles and Responsibilities: Project & Utilities Management + Plant Engineering. a.
Project Planning, Preparation, Monitoring and Execution of Fuel Tank
Development Facility September 2015 – March 2016, as per training from
Yamaha Motor Company, Japan (October 2015) - Successful installation of Press
Machines ranging from 5 - 10 Ton, resistance welding machines including spot
and seam with different variants, finishing process equipment, inspection tank &
Utilities - Arrangement and installation of all necessary auxiliaries and
equipment including cooling water lines, compressed air lines, industrial water
lines and electrical cabling - Parameters setting and testing of all said machines -
Accomplished all targets for installation and execution of line in 1st week of
March 2016 as per plan b. Operations & Maintenance of Utilities and
Management of Frame processing line - Utilities includes were Air Compressors,
Cooling Tower, Boiler along with auxiliaries including CO2 gas system, Exhaust
blower system. - Process setting as per system requirement - Planning and
scheduling of equipment modifications as per requirement - Comprehensively
meeting the desired targets within time constrains Professional Training from
Japan: 3 weeks training from YAMAHA MOTOR COMPANY, JAPAN of fuel tank
process facility 6th-23rd October 2015 including following targets to implement
successfully in Yamaha Motor Pakistan; - Project Execution and management -
Fuel Tank Line basic knowledge - Equipment confirmation - Parameters setting -
Installation and execution procedures
Mar 2015 - Jun 2015 Trainee Engineer
Gatron (Industries) Limited - Official Page
Training in Mechanical Maintenance Department includes: Plant Features: - 15 Air
Compressors (ATLAS COPCO), 13 screw compressors (dual stage) and 02
centrifugal compressors (tripple stage). Running under capacity from 580 m3/hr
to 6100 m3/h. - 07 Chillers (LG), 05 steam fired water cooled chillers and 02
electric powered centrifugal chillers. Capacity of 165 to 400 USRT - 6 Cooling
Towers of 400 m3/hr flowrate. - 6 AHUs capicity of 130,000 m3/hr flowrate. -
Several different types of pumps including Centrifugal pumps, submersible
pumps etc Responsibilities - Managed end user departments' requirement
including Spinning, Molding, Texturising &Power House - Preventive / corrective
maintenance or trouble shooting of critical, running and standby equipment. -
Successfully controlled Materials Management System for material handling and
requisition - Scheduling of maintenance according to MOGAN.

Educat ion
2018 - 2018 Thermo Fluids
Energy Research Training Program
Arizona State University
2016 - 2018 Thermal Energy Engineering
Master of Science (M.S.)
National University of Sciences and Technology (NUST)
2011 - 2014 Mechanical Engineering
Bachelor of Engineering (BE)
NED University of Engineering and Technology
2008 - 2010 Pre-Engineering
Inter
Adamjee College
2004 - 2008 Secondary Education
Class 7 to 10
Chiniot Islamia School
2002 - 2003 Suffah Savior School

Head line
Business Strategist at Conceptellers | Entrepreneur | Researcher | Power Plant Professional | Gas Turbine Specialist

Summary
CAREER OBJECTIVE I am an energetic, self motivated having excellent working and time management Skills. Ability to
work individually and as a part of team. I am leading my company to achieve its short term as well as long term goals
through value addition and market penetration within and outside Pakistan. I am putting my sincere efforts to
develop and groom my family business CONCEPTELLERS into a multi-functional industry by inaugurating a high
quality engineering environment. Wishing my hard-work, academics and resourceful experience will add value to
organizational manoeuvres. PROFESSIONAL SUMMARY I am an efficient power plant professional with 6 years
experience of Plant Operations & Maintenance along with Project Management and Academic Research in the
Engineering sector. A self-driven person possess rational approach towards solutions in a timely manner. Having
sufficient human skills to control manpower in plant. Good planning skills and always try to work with optimum
utilization of resources. I am expert in MS Office specially MS Excel which have enhanced my overall soft skills to
manage multiple tasks at a time. I have extensive knowledge and experience of Combine Cycle Gas Turbine (CCGT)
Power Plant. I am making the best use of my diverse skill set to enhance over all efficiency of thermal processes. I
have been awarded with two International training which have boosted my technical skills to solve analytical
problems dynamically. a. Project Management from Yamaha Motor Company, Japan (2015) b. Energy Research
Training from Arizona State University, USA (2018) FIELDS OF INTEREST - Power / Oil / Aviation - Academic Research -
Research and Development AREAS OF INTEREST - Turbo-machinery - Combine Cycle Gas Turbine Power Plant - Gas /
Steam Turbine - Utilities

Languages
English
Full professional
Japanese
Limited working
Urdu
Full professional

Courses
ANSYS
CATIA
Fleetguard, CUMMINS Power Generation
Strategic Time Management
Uni Graphics

Project s
Internship Project - Solar Water Heater
Aluminium based solar water Heater project for R&D Department at Thal Engineering PVT Limited.
ASME Competition - Solar Water Heater
Designed and created a single glazed glass sheet water heater with major use of COPPER material.
MS Thesis - Thermodynamic Modelling & Analysis of Micro Gas Turbine as a Range Extender in Electric Vehicles with
the evaluation of Battery Pack sizing.
Range extenders based on micro gas turbine (MGT) technology are being promoted in electric vehicles (EV) in order
to reduce the battery size and extend the driving range. MGT offers higher power density, fuel flexibility, lower
weight and good efficiency (with recuperation) compared to conventional reciprocating engines. MGT facilitates a
relatively smaller battery pack, which ultimately can reduce the capital and maintenance cost of electric vehicles.
Despite its advantages, MGT incurs small-scale design issues related to component performance, heat transfer
between hot and cold sections and manufacturing limitations. In this research project, the design of an MGT has
been studied simultaneously with the battery bank size and charging time analogy with an aim to evaluate their
conjoint operation. In addition, the influence of MGT small-scale effects on battery pack recharging has been
presented. For the study, Gas Turbine Simulation Program (GSP) has been extensively used together with detailed
battery pack calculations. Comparison between sizing of the battery and MGT design is a critical outcome of this
research. Thermodynamic modelling of a Micro Gas Turbine was done by using Gas Turbine Simulation Program
(GSP) & MATLAB to enhance driving range of an Electric Vehicle economically and efficiently by considering its small
scale effects and its link to different battery pack sizes and charging time analogies. Objectives: - Design Point
Selection - Preliminary MGT design in GSP / MATLAB - Thermodynamic Modelling, Simulation & analysis in GSP -
Relating small-scale effects with component and cycle efficiency - Associating with battery pack sizes and charging
time analogies
Fuel Tank Developement Facility
- Preparation of Project Plan, Evaluation Charts and Layout of Fuel Tank Welding Line after detailed study of Line,
Functional, Fixed Position and Cellular Layouts, hence deciding Sub-Welded Parts (Outsourced to Vendors) and Main
Welded parts. - Co-ordination with Yamaha Motor Company (Parent Company) regarding the product localization
plan, machines delivery status and upcoming projects. - Currently Managing the supervision of sub-contracting at
site and existing resources. - Direct communication with the contractors, line management and all the department
involved in project execution, also visiting vendors time to time in order to monitor the job schedule. - Estimation of
the Electrical Cabling Work, Main Power Panel, Designing of Cabling Route and on-site Installation of step-down
Transformers for the machines operating at low voltages. - Cooling Tower estimation and installation along with the
Water Circulation Piping required for the Flange, Mesh and Spot Resistance Welding Machines.
BE Final Year Project - Study & Optimization of Water Distribution System of NED University
Roles & Responsibility: Group Leader & advisory in designing phase as well as calculations. Nature of Project:
Complete mathematical calculations with proof results. Optimization: Installation of PVC + Diameters alteration
from existing system

You might also like