(+) 6.50m.

(+) 5.25m.
SLOPE
(+) 4.30m.TOP OF BARGE IN
EMPTY CONDITION CONSIDERING
HIGH TIDE (+)1.80m CD (+) 3.15m.
(+) 1.80m. CD
HIGH TIDE DRAIN

2M 2M

2M 2M ROCK FILL
(±) 0.00m. CD
3M 2M
LOW TIDE
3M 3M

3M 2M 2M

(-) 7.00m. 3M 2M 2M

3M 3M 2M

(-) 10.00m.

15.655

20.590

25.873

30.576

35.579

40.651

47.006
25.041

19.889

15.024

10.205
29.816

5.094

10.16
5.473

0.00
50.00 M.

VIEW 1-1

BOULDER STACKING
YARD (21000 M²)

PIPE CULVERT 6 LOT OF EACH 2.5 HA REQUIRED


BY GPL GOVT. APPROVAL
WEIGHBRIDGE

EXISTING TEMPORARY ROAD

100
TOWARDS NORTH BRAKWATER

M.
PIPE CULVERT

NO
RT
HB
RE
AK
WA
TER
1
LOAD OUT POINT

KEY PLAN LOAD OUT POINT


FOR TENDER SUBMISSION
CONTRACTOR : PROJECT: TITLE : DRAWING NO. REV.

Cem ITD Cementation India Limited CONSTRUCTION OF OUTER HARBOUR WORKS FOR SEA LOGISTIC SCHEME -- A
PROJECT VARSHA A 16.02.23 ISSUED FOR SUBMISSION SB TM DB DB
C o m m i t m t e, n Re l i a b i l i t y & Q u a l i t y
REV. DATE REVISION DESIG. DRN. CHK. APPR. SHEET : 1 OF 1