Professional Documents
Culture Documents
Onshore Gas
Onshore O&G
Offshore O&G
YTF
Africa
126
YTF Gbbl
Lat Am
135
Gbbl
2.9 mmbo/d
Not including Middle East, Russia, North America From Yearbook Enerdata
Gas Daily Production
+9 mmboe/d
5.6 mmboe/d
3.8 mmboe/d
3.3 mmboe/d
3.2 mmboe/d
Not including Middle East, Russia, North America From Yearbook Enerdata`
Countries with O&G exports representing > 1.5% GDP
From EIA
What´s going on in this area
Regional G&G and New Opportunities
Venezuela
Colombia
Ecuador
(Blakey, 2002)
Ecuador: Context
Current Daily Oil Production • New E&P contract model
(Participation Contract)
Target: 1.000 Kbopd • Pre-established minimum commitments
• Pre-defined royalties
• Offer contractual security
Shushufindi
Pg & Ng
Cretaceous
Colombia: Context
Round 2021 Permanent Process O&G power plants Oil Pipes Gas piipes
Colombia
• Llanos Basin
• Middle Magdalena Foothills
• Sinu and San Jacinto Basins
Round 2021 Permanent Process O&G power plants Oil Pipes Gas piipes
Llanos Basin
Llanos and Magdalena basins, are
already mature areas but recent new
approaches for new plays have made a
Cusiana difference.
50 km
Pg & Ng
Cretaceous
Colombia Llanos Basin Cross Section
• Now it is changing to a new play in Paleocene sandstones
• Jacana field is over 200 mmb stooip (15° API)
Pg & Ng
Cretaceous
Opportunities
• Paleocene channel belt sandstones in a combined structural - stratigraphic trap
Middle Magdalena Basin
Llanos and Magdalena basins, are
already mature areas but recent new
approaches for new plays have made a
B
difference.
La Cira
Velazques
A
B Upper Cretaceous shale oil and gas
50 km
Ng
Pg
Cretaceous
Northern Colombia
Kronos
A
B Dry Gas
C
Venezuela
C Sinu – San Jacinto Emergent Basin
B
C Offshore
50 km Colombia
Ng
Pg
Cretaceous
There are opportunities
Ecuador
• New government is establishing
more attractive and stable contract
terms
• New bid round near fields
• Participation contracts to increase
production of some fields
• A long term plan to reconvert oil
power plants for gas is on the table
• Offshore gas round is possible in
2022
There are opportunities
Colombia
• Permanent allocation process
• More flexible E&P contracts.
• Commitments can be fulfilled at any
time within the 6 years exploratory
phase
• Gas market for domestic, industrial
and power is in demand for the
next decades
There are opportunities
Opportunities for reduce carbon
intensity
Scope 2:
• Geothermal pilots have been
successful in Colombia
• Constant radiation through-out the
year for PV projects
Scope 3
• Part of the biggest rainforest on the
planet. Plenty of local projects for
reforestation and afforestation
Parex
• Arrived in Colombia in 2009, four blocks 50% W.I., No production
• Currently the 3rd bigger oil producer in Colombia (~50 kbopd)
• Market Cap = 3.1 BUSD
Consulting Services in London
mesa.andres@horizonz.com.co