Nitrogen: Required in wave pot area. Not needed but allowed in pre-heat area.
The following is the target profile for the wave solder process:
Provi
Selected Components for Process
Monitoring: C10 (TOP side Pin) Preheat, 100° C Min
Dwell time 6-9 sec,
J2, T1 (Bottom)
Peak temp 250° C-268° C
de
wave
solder
profil
Provi
e
de
infor
wave
matio
solder
n
profil
e
graph Enphase Energy Proprietary
1
940-20059 PCAMAP Mobile EV Charger Rev: 01
8.1 C3 test:
Perform C3 testing at the following board locations identified as shown in the
below pictures
C3 need to be performed daily and upload the C3 test report to the Enphase
SharePoint
For the newly qualified CM, C3 must be performed every Shift.
Every CM must obtain Enphase Manufacturing Engineering team approval for
Replace
any change in frequency of the C3 testing
with
MW
process
(Ionogra
ph)
Bottom LCC Board
9 Conformal Application
The following PVA Delta 8 system Spray Coating recipe naming convention shall
be used:
o XXX YYY ZZZZ.TXT
XXX = Last 3 digits of PCBA 800 number.
YYY = BTM (PCBA bottomside) or TOP (PCBA topside).
ZZZ = FRNT or BACK or DUAL (PCBA location in pallet)
All spray coat recipes shall be developed in the following high level sequence:
o Needle dispense then Spray coat the Top side of the PCBA.
o Needle dispense then Spray coat the Bottom side of the PCBA.