Proposals must be submitted on copy of the proposal form provided in this Request for Proposal
document.
A complete set of the Proposal Request (electronic) may be obtained, at the office of Insight Engineering,
attention Kim Koch (kkoch@insightpllc.com) 201 S Chester, Little Rock, Arkansas 72201. Questions
regarding the RFP shall be emailed to Jessica Holloway at jholloway@atu.edu.
Obtaining contract documents through any source other than the Design Professional listed above, or
her representative(s) is not advisable due to the risks of receiving incomplete or inaccurate information,
and the proposer runs the risk of basing proposer’s proposal on such information. The documents
obtained through the Engineer, or her representative(s) are considered the official version and take
precedence if any discrepancies occur.
Suppliers are hereby notified that any proposer who desires to enter into Contract for this work must
comply with disclosure requirements pursuant to Governor Executive Order 98-04. Submission to the
Owner of completed Disclosure forms will be a condition of the Contract. The Owner cannot enter into
any contract, which does not obligate the contractor to require the submission of Disclosure forms for
subcontractors.
This invitation does not commit the Owner to pay any cost incurred in the preparation of proposals.
The Owner and the General Contractor each reserve the right to reject any and all proposals, and to
waive any formalities.
Pursuant to Ark. Code Ann. § 22-9-203, the State encourages all small and minority business
enterprises to submit proposals for capital improvements. Encouragement is also made to all general
contractors that in the event they subcontract portions of their work, consideration be given to the
identified groups.
Name ____________________________________________________
Title ____________________________________________________
Company ____________________________________________________
Address ____________________________________________________
____________________________________________________
City / State / Zip Code
Telephone (______)_____________________________________________
Fax (______)______________________________________________
E-Mail ______________________________________________________
Date ______________________________________________________
VENDOR
COMMENTS:__________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
________________________________________________________
COMPANY NAME:_______________________________________________________
ADDRESS:_____________________________________TITLE___________________
ZIP:_____________PHONE_____________________DATE______________________
Jessica Holloway, APO, Director Business Services , Arkansas Tech University, Young Building,
203 West O Street, Russellville, AR 72801, (479) 968-0269.
NOTE: Bidders not submitting letters of intent to bid or the Vendor Reply Form are
advised that they may not receive subsequent information relating to this
proposal.
00070 - Proposal Form
Proposal of
(Hereinafter called “Supplier”) corporation, organized and existing under the laws of the
state of partnership, or an individual doing
business as .
Dollars ($ )
Dollars ($ )
The sum will be increased each year thereafter by not more than the annual percentage
amount of:
Percent ( %)
Dollars ($
Supplier understands that the Owner reserves the right to reject any or all Proposals and
to waive any formalities in the Proposals.
(Seal if by corporation) Respectfully submitted,
Signature: Title:
1.01 RESERVATION
This invitation does not commit ATU to pay any cost incurred in the preparation of bids. Further,
ATU reserves the right to accept or reject any or all bids or any part of a proposal.
1.03 CLARIFICATION
All questions concerning this RFP must be addressed to Jessica Holloway, APO, Director Business
Services, Arkansas Tech University, Young Building, 203 West O Street, Russellville, AR 72801,
(479) 968-0269. Bidders are advised to read all information provided, supply all information
requested, and note any variance to these specifications in written form with the submission of their
response.
The Request for Proposal (RFP) is issued by the Office of Procurement for ATU. The Procurement
Official is the sole point of contact for the university. There shall be no other point of contact
throughout this phase of the process but through Jessica Holloway or designee.
1.06 INVOICE
Payment will be paid to the bidder by ATU thirty (30) days after approval by the requesting
department and receipt of invoice. Invoice in triplicate must be sent to the Arkansas Tech
University. You must indicate on the invoice the purchase order number you received prior to
commencing service. Invoices should be sent to:
If the RFP does not result in ATU obtaining reasonable prices in the sole opinion of ATU, when
considering all the price and cost factors associated with the service, ATU may opt to reject all bids
or in the event time or economic considerations preclude re-solicitation of work or a reduced scope
we may negotiate an adjustment of the bid price including changes in the bid requirements, with
the bidder who has the lowest price bid, within the amount of the available funds. In the event that
negotiations are necessary, a bidder may be determined to be non-responsive if the bidder and
agency are unable to reach a negotiated adjustment, we may then opt to move to the next ranked
bidder.
B. Bidder shall respond to each numbered paragraph of this RFP that requires a response
stating first the paragraph number, the specification, then, the vendor’s response. To
assure a thorough evaluation of each respondent’s proposal, bidder must address
everything in the Selection Criteria Section of this RFP. Where it calls for explanation,
each point shall be addressed summarily in written form with the bidder referencing first
the section and the appropriate response.
C. The vendor must provide written, point-by-point narrative responses to each proposal
requirement; simply stating “agreed” or “complies” is not acceptable, supplemental
information, literature and other supporting materials that further explain or demonstrate
the proposed service capabilities may also be included within the proposal response.
F. The ATU Procurement Official reserves the right to award a contract or reject a proposal
for any or all line items of a bid received as a result of this RFP, if it is in the best interest
of ATU to do so. Bids shall be rejected for one or more reasons not limited to the following:
1. Failure of the bidder to submit his bid on or before the deadline established by the
issuing office.
2. Failure of the bidder to respond to a requirement for oral/written clarification,
presentation, or demonstration.
3. Failure to supply vendor references, or other information specifically requested as
mandatory.
4. Failure to sign an Official Bid Document.
5. Failure to complete the Official Bid Price Sheet(s).
6. Any wording by the bidder in their response to the RFP, or in subsequent
correspondence, which conflicts with or takes exception to a bid requirement in
this RFP.
G. ATU may reject any and all bids if deemed in the best interest of ATU, and may reject a
bid of any party who has breached any former contract with ATU. ATU also reserves the
right to re-solicit proposals.
H. ATU reserves the right to waive any informalities in the proposals received and to negotiate
minor exceptions, irregularities, or errors taken by bidder in this RFP. These errors may
be corrected by the bidder involved provided that, in the judgment of the Agency
Procurement Official such action will not negate fair competition and will permit proper
comparative evaluations of bids submitted.
I. Bidders are cautioned not to delete or make changes in provisions, terms or specifications
of this RFP; as such changes may affect further consideration. ATU will reject any proposal
which it deems does not meet the terms of the solicitation
J. Furnishing incorrect reference information or unsatisfactory references may lead to
rejection of bidder’s response. This is at the sole discretion of ATU.
K. If this RFP does not result in ATU obtaining reasonable prices in the opinion of ATU, when
considering all the price and cost factors associate with this service, ATU may opt to reject
all proposals or in the event time or economic considerations preclude re-solicitation of
work or a reduced scope we may negotiate an adjustment of the proposal price including
changes in the proposal requirements, with the bidder who is responsive and responsible
and who has the highest rating of the evaluation committee at this point to bring the
proposal within the amount of the available funds. In the event that negotiations are
necessary, a bidder may be determined to be non-responsive if the bidder and agency are
unable to reach a negotiated adjustment, we may then opt to move to the next ranked
proposer.
A. Any statement in this document which contains the word “must” or “shall” means that
compliance with the statement is mandatory, and failure by the bidder to comply with that
statement shall cause the bid to be rejected.
E. Bidders should note the following regarding ATU’s contracting authority, and amend any
documents accordingly. Failure to conform to these standards may result in rejection of
bid.
1. To indemnify, defend, or hold harmless any party any liability and damages.
3. To pay damages, legal expenses or other costs and expenses of any party.
6. To agree to any provision of a contract which violates the law or Constitution of the
State of Arkansas
1. Remove any language from its contract which grants to it any remedies other than:
3. The right to recover only amounts due at the time of cessation of services.
4. Include in its contract that the laws of the State of Arkansas govern the contract.
5. Acknowledge in its contract that contracts become effective when awarded by the ATU
Bid marked “ATU” are formal bids and must be received in sealed packaging and clearly
marked with the proposal number, date and opening time as listed on the front of this RFP.
“ATU” bids cannot be faxed or hand delivered unsealed as they will not be considered.
Multiple and Alternate Bid Packages – There will be no alternative bid packages. Only one
Request for Proposal response shall be accepted.
All bids and proposals shall be for public opening. Proposals shall not be subject to public review
until after the committee has completed its’ work. The opening will serve only to open, read and
tabulate the proposal price of each. No discussion will be entered into with any vendor as to the
quality or provisions of the specifications and no award will be made either stated or implied at the
proposal opening.
In case of error in the extension of prices in the proposal, the unit price will govern. Proposals,
modification or corrections thereof received after the closing time specified will not be considered.
In the case of protest associated with this RFP, the protest will be resolved by the Vice Chancellor
Administration and Finance and/or Director Business Services, APO, with the consultation
of the Insight Engineering’s Engineer of Record.
1.19 ADDENDA
The Supplier shall acknowledge receipt of each Addendum on the Proposal Forms in the
designated location.
No contract for commodities or services greater than $25,000 and no discretionary grant greater
than $25,000 shall be awarded, extended amended or renewed by an agency to any bidder who
has not disclosed as required in this proposal with the exception of bidders in Sec 3D (emergencies)
for goods and services for which disclosure may be obtained after purchase or service.
Failure to make any disclosure required by Governor’s Executive Order 98-04, or any violation of
any rule, regulation, or policy adopted pursuant to the order, shall be a material breach of the terms
of this contract. Any bidder, whether an individual, or entity, who fails to make the required
disclosure or who violates any rule, regulation, or policy shall be subjected to all legal remedies
available to the agency. DISCLOSURE FORM IS ATTACHED.
Each entity and person interested in contracting with the State (ATU) must include with its
proposal response a copy of the company’s EQUAL OPPORTUNITY POLICY.
No delivery shall commence until successful bidder is in receipt of the approved purchase order
as issued by ATU.
In the event of any breach of contract by Contractor then in addition to any other remedies available
to ATU at law or in equity, ATU may:
A. Continue the contract in effect and thereby be entitled to enforce all rights and remedies
under the contract; or
B. Terminate the contract by providing written notice to Contractor of such intention and
recover from Contractors any amount necessary to compensate ATU for all detriment
negligently or willfully caused by Contractor's failure to perform its obligations under the
contract.
2.01 INVALIDITY
The invalidity of any provision of the contract as determined by a court of competent jurisdiction
shall in no way affect the validity of any other provision hereof.
2.02 WAIVER
No waiver of either party hereto of any provision of the contract shall be deemed a waiver of any
other provision hereof or of any subsequent breach by such party of the same or any other
provision. The failure of ATU to terminate the contract due to the Contractor's violation of its terms
or conditions, or a waiver on the part of ATU of any violation by Contractor of any term or condition
of the contract, shall not be considered a waiver of ATU's right to terminate the contract due to any
subsequent violation of the same or other terms or conditions of the contract.
2.03 INDEMNIFICATION
Contractor shall indemnify, defend and hold harmless ATU, its officers, agents and employees
from and against any claims, damages, expenses, including an amount equal to reasonable
attorney's fees, or liabilities arising out of or in any way connected with this contract including,
without limitation, claims, damages, expenses, or liabilities for loss or damage to any property, or
for death or injury to any person or persons in proportion to the extent that such claims, damages,
expenses, or liabilities arise from the negligence or willful acts of omissions of Contractor, its
officers, agents, or employees.
A. General: Proposals will be evaluated based upon physical size, equipment cost,
delivery date, energy efficiency, estimated maintenance cost, local service
capabilities, equipment references, service organization references, compliance
with the terms and conditions of the RFP, voluntary alternates, and other factors.
The proposal or combination of proposals considered to be in the best interest of
the Owner will be selected.
B. Scoring: Each proposal will be scored in the manner hereinafter described. The
scoring criteria will include capital cost (inclusive of incremental installation costs),
Integrated Part Load Value ratings, delivery date, extended warranty and
scheduled maintenance cost, and equipment reliability and service references.
C. Criteria Weighting: The selection criteria will be weighted as indicated below:
1. Capital Cost – 50%. Score will be determined quantitatively by dividing the
lowest proposal Capital Cost by specific proposal Capital Cost then
multiplying by Criteria Weight. Example Calculation: Min (prop.1, prop.
2…prop N) / prop. 1 * 50.
E. Evaluation Process:
1. Proposals will be evaluated by the Engineer to verify compliance with the
terms and conditions of the RFP.
2. Proposals determined to be in compliance with the terms and conditions
of the RFP will be evaluated further.
3. The Engineer will contact each equipment reference and each service
reference.
4. The Engineer will develop a summary of the proposals and combination
of proposals. The Engineer will forward the summary to the Owner.
5. The Owner will consider the summary provided by Insight Engineering and
score each proposal.
6. The Owner scoring will be tabulated. The proposal receiving the highest
average score will be selected.
2. HVAC Upgrades to Dean Hall: The new Cooling Tower will be installed in the existing
mechanical room at Dean Hall. The Engineer for the project is Insight Engineering. The
General Contractor and Mechanical Contractor will be selected under competitive bid process.
The Owner or his designee will be issuing the purchase orders for equipment purchase.
3. Exclusions, Clarifications, and Exceptions: Proposals shall be in strict accordance with
the terms and conditions of the RFP as modified by Addenda. Exclusions, clarifications, and
exceptions shall not be accepted and labeled non-responsive.
4. Purchasing Instructions for Cooling Tower: The Owner will receive proposals, select the
Supplier, and issue a Purchase Order. The Contractor (selected by competitive bid process)
will be instructed by the project Contract Documents to install the cooling tower furnished by
the selected Supplier in accordance with the terms and conditions of the Request for
Proposals. The Contract Documents for the project will require the Contractor to accept full
responsibility and coordinate equipment delivery, unload the equipment, and install the
equipment for a complete and operable system. The selected contractor will provide the
required insurance to cover the equipment after receipt of the equipment. (This will include but
not limited to; builders risk, general liability performance and payment bonds, and other
insurance or surety as required by the Owner).
5. Laws and Regulations: The selection and procurement of the equipment is subject to all
applicable State laws, municipal ordinances, and rules and regulations of authorities having
jurisdiction. Proposals shall be structured to comply with these requirements.
6. Form: Proposals shall be made on the form included in the RFP. Proposals shall be
submitted in a sealed envelope. Each envelope shall be clearly marked to indicate the
name of the Supplier and ATU Bid No.
7. Content: Each Proposal shall contain as a minimum the following information:
A. Physical Description: Physical description of the proposed equipment (refer to
Section 00400 for additional information).
B. Performance Data: Performance data for the Cooling Tower (refer to Section
00400).
Below are the mandated “givens” than are not permitted to be altered when selecting equipment.
1. Number of Towers: 1
The requirements of this Section shall conform to the general provisions of the Contract, including
General and Supplementary Conditions, Conditions of the Contract, and Contract Drawings.
1.02 SCOPE
C. CTI (Cooling Tower Institute) Standards: Provide cooling towers which meet
the performance standards of CTI Standards STD-201.
1. Factory assemble entire unit. For shipping, disassemble into as large as practical sub-
assemblies so that minimum amount of field work is required for re-assembly.
2. Provide protective covering over vulnerable components for unit protection during shipment.
Fit nozzles and open ends with plastic enclosures.
2.01 MANUFACTURERS
A. Acceptable Manufacturers:
1. Marley
2. BAC
3. Evapco
4. Delta
5. REYMSA
B. If equipment manufactured by a manufacturer other than that scheduled is utilized, then the
Mechanical Contractor shall be responsible for coordinating with the General Contractor and
all affected Subcontractors to insure proper provisions for installation of the furnished unit.
This coordination shall include, but not be limited to, the following:
2.02 GENERAL.
2. Include means and methods required to satisfy requirement even if not explicitly
indicated.
B. Vibration:
A. Counterflow design with airflow from two or more sides, induced-draft, top-mounted axial
fan, and pressurized pipe distribution.
A. Casing Material: FRP with UV inhibitors, HDPE with UV inhibitors, or stainless steel,
minimum grade 301L.
B. Frame Material: FRP with UV inhibitors, HDPE with UV inhibitors, or stainless steel,
minimum grade 301L .
7. Makeup-water connection.
8. Outlet Connection: Right angle bottom sump with drain, configured to mate to ASME
B16.5, Class 150 flange.
A. Fill shall be PVC film type high performance suitable for operating under winter icing
conditions. Air inlet louvers and drift eliminators shall be integral with PVC fill sheets.
Three pass drift eliminator shall be rated for drift loss not to exceed 0.005% of design flow
rate. Hinged access doors shall be provided in the outer end walls for service access into
eliminator and plenum area. Visual inspection of mechanical equipment, cold water basins
and adjustment of make-up valve shall be capable from access door without shutdown of
tower or recirculating water. Provide heavy gauge welded galvanized steel mesh guard
over each fan.
A. Options and trim required for this installation are to include not less than: DPDT safety
vibration switch in NEMA 4 enclosure with reset plunger for each motor circuit; extended oil
line outside fan cylinder to level dipstick for external verification of lubricant level; factory
installed and removable stainless covers over hot water distribution basins; OSHA handrail
system with access ladder, safety gate at top of each ladder, ladder extension to grade, and
safety cage if top of tower is 20’ above grade per OSHA regulations; an access platform
assembly with handrail for installation at base of each tower cell to allow egress into tower
interior, factory installed stainless interior maintenance walkway in cold water basin between
access doorways, and factory installed air inlet screens. An electric basin heat component
system for each cell including weatherproof control panel, solid state controller with
thermostat, B/W safety level switch and panel disconnect provided. Basin heat shall be sized
Some accessories and options supersede standard product features. All options are factory-
mounted unless otherwise noted.
A. Manufacturer of cooling tower shall provide the services of a factory trained Service
Technician or Engineer to inspect the installation to insure that it is in accordance with the
manufacturer’s instructions and procedures, that rotating components provide smooth
operation within manufacturer’s vibration tolerances. He shall advise the installer in writing
of any recommended corrective action that is required to meet manufacturer’s recommended
installation procedures.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Receive off-load, and store as required, cooling tower and accessories before installation.
B. Examine cooling towers before installation. Reject Cooling towers that are damaged.
C. Before cooling tower installation, examine roughing-in connecting to existing cooling tower
supports. Verify location of piping, controls, electrical connections, sizes and other conditions
affecting cooling tower performance, maintenance, and operation.
D. Cooling tower locations indicated on Drawings are approximate. Determine exact locations
before roughing-in for piping, controls, and electrical connections.
E. Verify sizes and locations of concrete bases and support structure with actual equipment.
G. Verify sizes and locations of roof curbs, equipment supports, and roof
penetrations with actual equipment.
I. Clean tower thoroughly. Comply with manufacturer’s instructions for filling and start-up of
operation to include not less than: verify lubrication of rotating parts; verify fan direction of
rotation; verify that motor amperage measured at motor junction box is in accordance with
1.01 PROPOSAL: The Supplier shall indicate a price on the Proposal Form in the designated
location for a price to provide Scheduled Maintenance Services. The Supplier shall also
indicate a maximum annual price escalation rate on the Proposal Form in the designated
location for the cost of the Scheduled Maintenance Services.
B. Scheduled maintenance for 4 additional years beyond the first year of service to
result in a 5 year period of scheduled maintenance.
1.02 WORK INCLUDED: Provide scheduled (preventive) maintenance services for cell t ower.
A. Personnel:
1. The Service Organization shall perform all services using qualified and
trained personnel.
2. The conduct of the Service Organization and all employees of the Service
Organization shall be in accordance with the rules and regulations of the
Owner.
4. The Service Organization shall warrant that all employees are U.S.
citizens or are otherwise legally entitled to accept employment with the
Service Organization and perform services under this Agreement. The
Service Organization shall pay all wages and all applicable federal, state
and local taxes, including FICA, unemployment taxes, etc., arising out of
such employment.
5. All employees of the Service Organization shall wear uniforms which bear
the name of the employee and the name of the Service Organization.
1.07 INSURANCE:
A. The Service Organization shall obtain, pay for and maintain the following insurance
covering the performance of Services as a minimum:
e) Premises-Operations Liability
B. Prior to the commencement of the Services on the Owner’s premises, the Service
Organization shall furnish the Owner with certificates of insurance providing
evidence of the coverage and limits of liability required under Paragraph 1.07 A.
These certificates shall state that at least 30 days written notice shall be provided
to the Owner prior to any cancellation, expiration, non-renewal or material change
in the insurance coverage that occurs during the life of this Agreement.
C. The Service Organization shall be responsible to the Owner for the amount of any
deductible contained in any of the foregoing policies and certificate of insurance.
D. These provisions set forth the minimum amounts and scopes of coverage and are
not be construed in any way as a limitation on the Service Organization's liability
under this Agreement.
PART 2 - PRODUCTS
2.01 GENERAL:
B. Fluids, oil, components, devices, etc., furnished and installed by the Service
Organization shall be as recommended by the Original Equipment Manufacturer
(OEM).
2.02 SPARE PARTS: The Service Organization shall maintain spare parts, materials and
supplies that are typically required for normal and emergency repairs and maintenance.
PART 3 - EXECUTION
A. Inspection: All work done and all materials furnished shall be subject to random
and periodic inspection and approval by the Owner so as to ensure that the
services rendered are in accordance with requirements and intentions of the
specifications and special provisions.
B. Reporting Method: The Service Organization shall furnish the Owner 2 copies of
a service check receipt for each unit serviced or repaired and a service checklist
bearing the signature of the service personnel and the signature of the Owner’s
designated representative certifying receipt of services.
3.02 CLEAN-UP: The Service Organization shall keep the job site free of debris, litter, refuse,
etc., and shall clean all fluids that spill or drip during the progress of the work. The Service
Organization shall remove all equipment from the area upon completion of the work.
C. The Owner shall provide access to building, parking and the use of utilities. The
Owner shall maintain security of the equipment rooms.
1. Extend warranty by 4 additional years beyond first year of service to result in a 5 year
period of complete cooling tower warranty protection.
1.02 SCOPE OF SERVICES: Extended Warranty shall cover the entire machine including materials,
equipment, parts, and labor.
1.04 AGREEMENT: Extended Warranty Agreement shall be between the Owner and the equipment
manufacturer.
1.05 RESPONSE TIME: The Supplier shall provide on-site warranty service within 2 hours of the
initial call for warranty.