You are on page 1of 73

PPG Track Record

PPG SIGMASHIELD™ 880/880GF/880XS and


PPG SIGMACOVER™ 850
Making the world a
more beautiful place
is a big job.
Let’s get started.
We create,
We create, invent,
invent, and
and formulate
formulate the
the amazing
amazing
paints, coatings,
paints, coatings, and
and materials
materials that
that make
make the
the
world aa more
world more protected
protected and
and beautiful
beautiful place
place
for the
for the next
next generation.
generation.
Field technical service
Experience, knowledge and professionalism
- it is our people who make the real difference

Experience and technical ability are essential to any


organization. Importantly, it is our people that make the
real difference. We are passionate about providing the
highest levels of customer support in the industry. This
focus on customer service is maintained by the total
dedication and professionalism of our people.

Our aim is to provide the most effective products and


processes for each application, supported by the best
possible technical service and advice, with experts based
locally in over 60 countries including around 600 Field
Technical Service representatives in the Asia Pacific region.

All FTS representatives are certified by the following


leading organizations with extensive experience gained in
all environments and conditions worldwide:
* FROSIO / NACE / KACE / Corrodere / ACQPA
Innovation and technology
Continued focus on technological
advancement is the commitment from PPG

All our performance-enhancing coating solutions are built


on an in-depth knowledge of the industry, our customers’
day-to-day challenges, and the environmental, health and
safety standards in the marketplace. By working in close
partnership with our customers, we understand the
constantly changing demands that they face. So we make
it our goal to provide innovative, value-added coatings
matching the requirements of the markets we serve, not
just for today but also for tomorrow.

Our products are trusted to deliver consistent


performance in their given markets worldwide.

R&D highlights in the Asia Pacific region


- PPG PMC Global Technical Centers in China and Korea
Developing new products not only for local and regional
but also for global markets
- Global PFP Technology Center in Kunshan, China
Equipped with state-of-the-art research and test
facilities to be closer to the heart of the market and to
better understand the needs of our customers
PPG Track Record
PPG SIGMASHIELD™ 880/880GF/880XS

Project References
PPG SIGMASHIELD™ 880

5 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880/880GF/880XS
Jiangsu Luneng Dongtai 200 MW
Concession Offshore Wind Farm
The PPG SIGMASHIELD™ 880 system
delivers ultimate abrasion protection for
extreme conditions

Case study

The Challenge
The Customer
Developer – Jiangsu Guangheng New Energy Co., Ltd. Jiangsu Luneng Dongtai 200 MW Offshore Wind
OEM – Siemens Power Plant is located 34km offshore in the East China
Sea. Its operation condition is complex, influenced by
coastal climate, splashes, salt mist and acid rain. The
The Location fifty grounded, monopole foundations needed effective
Jiangsu, China coating protection for corrosion resistance, color- and
gloss retention, and an extended protection life cycle in
the extreme coastal environment.
The Challenge
To provide extended service life for extreme, corrosive In addition to coating protection, the owner had to achieve
offshore conditions. Also to offer a fast-drying coating project commencement and grid connection for power
solution to meet the tight project schedule to deliver generation within a year. This critical timescale resulted
sound preliminary protection during the construction in a shorter construction time period, which placed high
phase demands on the coating’s effective, fast-cure preliminary
protection properties.

The Solution
The PPG SIGMASHIELD™ 880 high-build, surface-tolerant The Solution
epoxy system
It was critical on this project to use an effective coating
solution that would strengthen the performance and
The Benefits quality of the coating to improve the cost effectiveness of
The PPG SIGMASHIELD 880 abrasion-resistant epoxy coating protection under various extreme environments.
coating delivers ultimate abrasion protection in extreme
conditions for extended asset lifetime. Its high-build- Our PPG SIGMASHIELD 880 high-build, surface-tolerant
and surface-tolerant characteristics reduce the time and epoxy coating can greatly reduce the time and costs spent
cost of pre-application surface preparation, and improve on surface preparation during fabrication. The coating’s
application productivity excellent abrasion resistance also provides effective
protection for the most challenging and demanding
service conditions.
The Result
The PPG SIGMASHIELD 880 system helped Jiangsu
Luneng realize the project requirements and achieve
completion in a shorter time frame

6 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
Jiangsu Luneng Dongtai 200 MW Concession Offshore Wind Farm
PPG SIGMASHIELD™ 880/880GF/880XS
The PPG SIGMASHIELD™ 880 system delivers ultimate abrasion protection for extreme conditions

The Benefits

The PPG SIGMASHIELD™ 880 product is engineered and


formulated to resist corrosion in a wide range of industries
and applications. It offers cost savings by reducing the
time and expense associated with surface preparation
as well as providing greater application efficiency and
enhanced finish quality.

As the PPG SIGMASHIELD 880 coating can be rapidly


immersed and continues to cure after seawater
immersion, it is particularly suited for structures exposed
to tidal movement and surges, and for offshore splash
zones such as those encountered in offshore projects.

Benefits of two coats – in a single coat


As a fast-drying, single-coat system, the PPG
SIGMASHIELD 880 product accelerates the application
process to minimize downtime. Application is simplified by
its high surface tolerance (suitable for damp- or wet-blast
clean substrates), extended recoat window, and the high
film thickness that is achieved in one coat.

Our PPG SIGMASHIELD 880 coating’s superior resistance


to abrasion, impact, corrosion and seawater prolongs
service life and protects assets in some of the world’s
most severe environments.

Benefits of PPG SIGMASHIELD 880:


• Designed for use in offshore splash zone The Result
• Exceptional resistance to seawater, corrosion and
The PPG SIGMASHIELD 880 system provided outstanding
abrasion
application performance and excellent abrasion- and
• Proven protection for extended coating life cycle
weather resistance. The fast-drying rate enabled it to be
• High-build and fast cure: 200 – 1,000 μm per coat handled and transported within a short time to keep up the
• Continues to cure when immersed in water project schedule.
• Conforms to NORSOK M501 System 1
• Conforms to ISO 12944-6 C5-M This durable, abrasion-resistant epoxy coating system will
provide protection to the Jiangsu Luneng Dongtai 200
• Conforms to ISO 12944-6 lm3 (Include HPWJ-treated
MW Offshore Wind Project for many years to come.
substrates)

7 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Yuedian Zhanjiang Wailuo Guangheng Luneng 200MW


Offshore Wind - Booster Station Offshore Wind - Foundation Piles
Year
Year
2018 2017
Owner
Guangdong Yuedian Group Owner
Luneng Jiangsu Guangheng New Energy
Builder
ZPMC Number of pile foundations (set)
20
Coating system for booster station (anti-corrosion) Installed capacity per tower
Product 10 MW
PPG SIGMAZINC™ 109HS @ 80 µm
PPG SIGMASHIELD™ 880 @ 300 µm Builder
PPG SIGMADUR™ 550 @ 90 µm No.4 Engineering of CCCC Third Harbor Engineering

China Hydropower TianJin South


Port Offshore Wind - Foundation Hebei Laoting Offshore Wind
Piles Power - Foundation Piles
Year
Year 2017
2017
Owner
Owner Hebei Construction & Investment Group
Sinohydro Corporation
Number of pile foundations (set)
Number of pile foundations (set) 39
3
Installed capacity per tower
Installed capacity per tower 3 MW
3 MW
Builder
Builder Tianjin Port Engineering
Tianjin Port Engineering Installation
Coating system for foundation pile (interior)
Coating system for foundation pile (interior) Product
Product PPG SIGMASHIELD 880 @ 600µm
PPG SIGMASHIELD 880 @ 600µm
Coating system for foundation pile (exterior)
Coating system for foundation pile (exterior) Product
Product PPG SIGMASHIELD 880 @ 800µm
PPG SIGMASHIELD 880 @ 800µm PPG SIGMADUR 550 @ 80µm
PPG SIGMADUR 550 @ 80µm

8 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Longyuan Dafeng Offshore


Booster Station Project

Year
2017

Owner
Longyuan Power

Builder
Shanghai Zhenhua Port Machinery

Coating system for jetties (anti-corrosion)


Product
PPG SIGMASHIELD™ 880 @ 800µm
PPG SIGMADUR™ 550 @ 60µm

Guodian Zhoushan Putuo District


6 Wind Power - Steel Pipe Pile

Year
2017-2018

Owner
China Guodian Power Development Co., Ltd.

Manufacturer
Siemens

Number of pile foundations (set)


63 sets

Installed capacity per tower


4 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile
Product: PPG SIGMASHIELD 880
PPG SIGMADUR 550
Total DFT: 1080 μm

9 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

CLP Binhai H2
Offshore Wind Power
Year
2016

Owner
CLP Binhai Offshore Wind Power Co., Ltd.

Number of pile foundations (set)


100 sets

Installed capacity per tower


4 MW

Product system for booster station


(Anti-Corrosion and Passive Fire Protection, Blue Island
Marine Engineering)
Booster top module fire protection coating system
Section: Passive fire protection
Product: PPG SIGMACOVER® 280
PPG PITT-CHAR® XP
PPG SIGMADUR™ 550
Total DFT: 5610 to 10110 μm

Booster station top module anti-corrosion coating


system
Section: Steel structure exposure area
(Column/support/stair step/handrail/internal
surface of wall)
Product: PPG SIGMAZINC 109 HS
PPG SIGMACOVER 410
PPG SIGMACOVER 410
PPG SIGMADUR 550
Total DFT: 390 μm

Section: Lifting platform, escape routes Product system for booster station jacket
Product: PPG SIGMAZINC™ 109 HS Section: -1.4m section range or above:
PPG SIGMASHIELD™ 880 Catheter, J-shape pipe, docking, stairs
PPG SIGMASHIELD 880 Product: PPG SIGMASHIELD 880
PPG SIGMADUR 550 PPG SIGMASHIELD 880
PPG SIGMADUR 550 PPG SIGMASHIELD 880
Total DFT: 1400 μm PPG SIGMADUR 550
Total DFT: 930 μm
Section: Water tank (Interior)
Product: PPG SIGMAGUARD CSF 585 Section: -1.4m section range or below:
PPG SIGMAGUARD CSF 585 Catheter pipe interior/steel pipe 13.8m exterior
Total DFT: 400 μm Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Section: Accident oil pool, waste water treatment Total DFT: 600 μm
equipment, oil tank (interior)
Product: PPG PHENGUARD™ 930 Section: Catheter/hand rails and other galvanized parts
PPG PHENGUARD 935 Product: PPG SIGMASHIELD 880
PPG PHENGUARD 940 PPG SIGMASHIELD 880
Total DFT: 400 μm PPG SIGMADUR 550
Total DFT: 440 μm

10 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Guodian Zhoushan Putuo District


6 Wind Power - Steel Pipe Pile
Year
2016

Owner
China Guodian Power Development Co., Ltd.

Manufacturer
Siemens

Number of pile foundations (set)


15 sets

Installed capacity per tower


4 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +12.5 to 18.0m
section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMADUR 550
Total DFT: 1080 μm

Section: Pipe pile interior: +10.5 to -18m section range


Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 600 μm

Section: Interior parts (supporting deck, reinforcement,


vent cover, limit bar)
Product: PPG SIGMASHIELD 880
Total DFT: 350 μm

Section: 12.5m and below - docking parts and electricity


cable parts Section: 12.5m or above - cable tube/support tube/
Product: PPG SIGMASHIELD 880 stairs/hand rails/other parts
PPG SIGMASHIELD 880 Product: PPG SIGMACOVER 280
PPG SIGMADUR 550 PPG SIGMASHIELD 880
Total DFT: 1080 μm PPG SIGMADUR 550
Total DFT: 410 μm
Section: 12.5m or below - pile legs
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

Section: 12.5m or below - exterior of cable tube, support


tube, stairs and hand rails
Product: PPG SIGMACOVER 280
PPG SIGMASHIELD 880
PPG SIGMADUR 550
Total DFT: 710 μm

Section: 12.5m or below - exterior and interior of trumpet


Product: PPG SIGMACOVER 280
PPG SIGMASHIELD 880
Total DFT: 650 μm

11 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Datang Rudong
Offshore Wind Power
Year
2016

Owner
China Datang New Energy Investment Company, East China
Branch

Manufacturer
Gold Wind/Sinovel

Number of pile foundations (set)


Undefined

Installed capacity per tower


3 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880 Product system for booster station ( ZPMC )
PPG SIGMADUR 550 Section: Exposure area
Total DFT: 1080 μm Product: PPG SIGMAZINC 109 HS
PPG SIGMASHIELD 880
Section: Exterior surface of steel pipe pile: –4.0 m to PPG SIGMADUR 550
+16 m section range Total DFT: 540 μm
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880 Section: Interior section 1
PPG SIGMASHIELD 880 (Column/support/stair step/handrail/internal
Total DFT: 800 μm surface of wall)
Product: PPG SIGMAZINC 109 HS
Section: Interior surface of steel pipe pile: +11.0 m to PPG SIGMASHIELD 880
+4.0 m section range PPG SIGMADUR 550
Product: PPG SIGMASHIELD 880 Total DFT: 320 μm
PPG SIGMASHIELD 880
Total DFT: 500 μm Section: Interior section 2
(Wall non-exposed area, 3/4 beam, floor plate,
Section: Interior surface of steel pipe pile: +4.0 m to etc.)
+16.0 m section range Product: PPG SIGMAZINC 109 HS
Product: PPG SIGMASHIELD 880 PPG SIGMASHIELD 880
PPG SIGMASHIELD 880 Total DFT: 260 μm
PPG SIGMASHIELD 880
Total DFT: 800 μm Section: Interior section 3
Internal surface of accident oil pool
Product: PPG SIGMAGUARD 730
PPG SIGMAGUARD 730
Total DFT: 250 μm

12 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Guangheng Luneng Dongtai


Offshore Wind Power
Year
2016

Owner
Luneng Group (Jiangsu) Guangheng New Energy

Manufacturer
Siemens

Number of pile foundations (set)


50 sets

Installed capacity per tower


4 MW Product system for booster station (Blue Island Marine
Engineering and Shengli Oil Construction)
Coating system for foundation piles Section: Exposure area
Section: Exterior surface of steel pipe pile: +11.0 m to Product: PPG SIGMAZINC 109 HS
–4.0 m section range PPG SIGMASHIELD 880
Product: PPG SIGMASHIELD 880 PPG SIGMADUR 550
PPG SIGMASHIELD 880 Total DFT: 540 μm
PPG SIGMASHIELD 880
PPG SIGMADUR 550 Section: Interior section 1
Total DFT: 1080 μm (Column/support/stair step/handrail/internal
surface of wall)
Section: Exterior surface of steel pipe pile: –4.0 m to Product: PPG SIGMAZINC 109 HS
+16 m section range PPG SIGMASHIELD 880
Product: PPG SIGMASHIELD 880 PPG SIGMADUR 550
PPG SIGMASHIELD 880 Total DFT: 320 μm
PPG SIGMASHIELD 880
Total DFT: 800 μm Section: Interior section 2
(Wall non-exposed area, 3/4 beam, floor plate,
Section: Interior surface of steel pipe pile: +11.0 m to etc.)
+4.0 m section range Product: PPG SIGMAZINC 109 HS
Product: PPG SIGMASHIELD 880 PPG SIGMASHIELD 880
PPG SIGMASHIELD 880 Total DFT: 260 μm
Total DFT: 500 μm
Section: Interior section 3
Section: Interior surface of steel pipe pile: +4.0 m to Internal surface of accident oil pool
+16.0 m section range Product: PPG SIGMAGUARD 730
Product: PPG SIGMASHIELD 880 PPG SIGMAGUARD 730
PPG SIGMASHIELD 880 Total DFT: 250 μm
PPG SIGMASHIELD 880
Total DFT: 800 μm

13 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Huaneng Rudong
Offshore Wind Power
Year
2016

Owner
Huaneng Rudong Offshore Wind Power Co., Ltd.

Manufacturer
Siemens/Chognqing Haizhuang/Envision

Number of pile foundations (set)


23 sets

Installed capacity per tower


4.5 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMADUR 188
Total DFT: 1080 μm

Section: Exterior surface of steel pipe pile: –4.0 m to


+16 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880 Section: Interior section 1
Total DFT: 800 μm (Column/support/stair step/handrail/internal
surface of wall)
Section: Interior surface of steel pipe pile: +11.0 m to Product: PPG SIGMAZINC 109 HS
+4.0 m section range PPG SIGMASHIELD 880
Product: PPG SIGMASHIELD 880 PPG SIGMADUR 550
PPG SIGMASHIELD 880 Total DFT: 320 μm
Total DFT: 500 μm
Section: Interior section 2
Section: Interior surface of steel pipe pile: +4.0 m to (Non-exposed part of wall, 3/4 beam, floor plate,
+16.0 m section range etc.)
Product: PPG SIGMASHIELD 880 Product: PPG SIGMAZINC 109 HS
PPG SIGMASHIELD 880 PPG SIGMASHIELD 880
PPG SIGMASHIELD 880 Total DFT: 260 μm
Total DFT: 800 μm
Section: Interior section 3
Product system for booster station (ZPMC) Internal surface of accident oil pool
Section: Exposure area Product: PPG SIGMAGUARD 730
Product: PPG SIGMAZINC 109 HS PPG SIGMAGUARD 730
PPG SIGMASHIELD 880 Total DFT: 250 μm
PPG SIGMADUR 550
Total DFT: 540 μm

14 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

CLP Binhai Panama Wind Mill 77 x 2.5MW


Offshore Wind Power Year
2015
Year
2015 Owner
Panama Inter Energy
Owner
CLP Binhai Offshore Wind Power Co., Ltd. Number of pile foundations (set)
77
Manufacturer
Siemens Installed capacity per tower
2.5MW
Number of pile foundations (set)
Builder
36 sets
Cheng Xi Shipyard
Installed capacity per tower Coating system for foundation pile (interior)
4 MW Product
PPG SIGMACOVER 850 @210 µm
Coating system for foundation piles
Coating system for foundation pile (exterior)
Section: Exterior surface of steel pipe pile: +11.0 m to
Product
–4.0 m section range PPG SIGMACOVER 850 @ 210 µm
Product: PPG SIGMASHIELD 880 PPG SIGMADUR 550 @ 60 µm
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMADUR 550
Total DFT: 1080 μm

Section: Exterior surface of steel pipe pile: –4.0 m to


+16 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

Section: Interior surface of steel pipe pile: +11.0 m to


+4.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 500 μm

Section: Interior surface of steel pipe pile: +4.0 m to


+16.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

15 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

CGN Rudong Product system for booster station ( ZPMC )


Section: Exposure area
Offshore Wind Power Product: PPG SIGMAZINC 109 HS
PPG SIGMASHIELD 880
Year PPG SIGMADUR 550
2015 Total DFT: 540 μm

Owner Section: Interior section 1


CGN Rudong Offshore Wind Power Co., Ltd. (Column/support/stair step/handrail/internal
surface of wall)
Manufacturer Product: PPG SIGMAZINC 109 HS
Siemens PPG SIGMASHIELD 880
PPG SIGMADUR 550
Number of pile foundations (set) Total DFT: 320 μm
39 sets
Section: Interior section 2
Installed capacity per tower (Non-exposed part of wall, 3/4 beam, floor plate,
4 MW etc.)
Product: PPG SIGMAZINC 109 HS
PPG SIGMASHIELD 880
Coating system for foundation piles Total DFT: 260 μm
Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0 m section range Section: Interior section 3
Product: PPG SIGMASHIELD 880 Internal surface of accident oil pool
PPG SIGMASHIELD 880 Product: PPG SIGMAGUARD 730
PPG SIGMADUR 188 PPG SIGMAGUARD 730
PPG SIGMADUR 188 Total DFT: 250 μm
Total DFT: 1080 μm

Section: Exterior surface of steel pipe pile: –4.0 m to


+16 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

Section: Interior surface of steel pipe pile: +11.0 m to


+4.0 m section range
Product: PPG SIGMASHIELD 880
PG SIGMASHIELD 880
Total DFT: 500 μm

Section: Interior surface of steel pipe pile: +4.0 m to


+16.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

16 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Huaneng Rudong
Offshore Wind Power
Year
2015

Owner
Huaneng Rudong Offshore Wind Power Co., Ltd.

Manufacturer
Chongqing Haizhuang

Number of pile foundations (set)


2 sets

Installed capacity per tower


4 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMADUR 188
Total DFT: 1080 μm

Section: Exterior surface of steel pipe pile: –4.0 m to


+16 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

Section: Interior surface of steel pipe pile: +11.0 m to Section: Interior section 1
+4.0 m section range (Column/support/stair step/handrail/internal
Product: PPG SIGMASHIELD 880 surface of wall)
PPG SIGMASHIELD 880 Product: PPG SIGMAZINC 109 HS
Total DFT: 500 μm PPG SIGMASHIELD 880
PPG SIGMADUR 550
Section: Interior surface of steel pipe pile: +4.0 m to Total DFT: 320 μm
+16.0 m section range
Product: PPG SIGMASHIELD 880 Section: Interior section 2
PPG SIGMASHIELD 880 (Non-exposed part of wall, 3/4 beam, floor
PPG SIGMASHIELD 880 plate, etc.)
Total DFT: 800 μm Product: PPG SIGMAZINC 109 HS
PPG SIGMASHIELD 880
Coating system for booster station (ZPMC) Total DFT: 260 μm
Section: Exposure area
Product: PPG SIGMAZINC 109 HS Section: Interior section 3
PPG SIGMASHIELD 880 Internal surface of accident oil pool
PPG SIGMADUR 550 Product: PPG SIGMAGUARD 730
Total DFT: 540 μm PPG SIGMAGUARD 730
Total DFT: 250 μm

17 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Holborn Refinery Vizierschuiven Nederrijn


Year
Year 2016-2020
2017

Location
Location The Netherlands
Hamburg, Germany

Owner
Owner Rijkswaterstaat (RWS), Ministry of Infrastructure and Water
Holborn Management

Coating system Coating system


PPG SIGMASHIELD 880 @ 400µm PPG SIGMASHIELD 880 @ 2 x 300µm

• Floating roof coating maintenance project


• Ultra high pressure water wash WJ2 L
• One coat at 400 mµ
• ISO 12944 C5M High

18 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Oosterscheldekering – Haringvlietdam – Maintenance


Maintenance
Year
2016/2017
Location
The Netherlands
Location
The Netherlands
Owner
Rijkswaterstaat (RWS), Ministry of Infrastructure and Water
Owner
Management
Rijkswaterstaat (RWS), Ministry of Infrastructure and Water
Management
Coating system
One or Two coats of PPG SIGMASHIELD 880 @ 450µm
Coating system
(touch up)
PPG SIGMASHIELD 880 @ 1 X 300µm (touch up)

19 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

New Beatrixsluis – Sheet Piles Port of Scheveningen


Location
Year The Netherlands
2018

Owner
Location Municipality of The Hague
The Netherlands

Coating system
Owner PPG SIGMASHIELD 880 @ 2 X 500µm
Rijkswaterstaat (RWS), Ministry of Infrastructure and Water
Management

Coating system
PPG SIGMASHIELD 880 @ 2 X 225µm

20 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Duinkerken LNG Terminal Sluice Gate Hengelo


(Dunkirk LNG Terminal)
Year
Year 2018
2014

Location
Location The Netherlands
France

Owner
Owner Rijkswaterstaat (RWS), Ministry of Infrastructure and Water
Fluxys Group Management

Coating system Coating system


PPG SIGMASHIELD 880 @ 2 X 300µm PPG SIGMASHIELD 880 @ 2 x 600µm

Good condition – Three years after application

21 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Congorep/Perenco Platform –
Rehabitation

Owner
Prezioso - Congo

Location
Republic of Congo, Africa

Coating system
PPG SIGMASHIELD 880 @ 425 μm

• Protect platform from the ravaging effects of the


offshore environment against wave, floating debris
and other corrosive forces due to offshore drilling
environment.
• PPG SIGMASHIELD 880 is surface-tolerant, corrosion-
resistant. It continues to cure underwater.

22 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Pertamina Refinery Unit IV - Jetty


Structure for Tidal Zone

Owner
Pertamina Refinery Unit IV

Location
Cliacap, Indonesia

Coating system
PPG SIGMASHIELD 880 @ 425 μm

• Coating was subjected to immersion within 30 minutes


after application due to tide but it continued to cure
without adverse effect.
• Minimal surface preparation – can be applied to damp
surfaces.

23 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Pertamina Refinery Unit V –


Rehabitation

Owner
Pertamina Refinery Unit V

Location
Balikpapan, Indonesia

Coating system
PPG SIGMASHIELD 880 @ 500μm

• Needing solution for coastal environment, tidal zone,


and saltwater immersion
• Fast cure and high film thickness in a single coat
• Continuing curing underwater

24 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Jupiters Casino Expansion Pier Ring Beams


Project – Bridge Piles
Location
Nelson Pier, Melbourne, Australia
Owner
Queensland Department of Transport and Main Roads
Environment
Marine
Location
Queensland, Australia
Coating system
PPG SIGMASHIELD 880 @ 700 μm
Applicator
Allied Coating Services
• Abrasive blast clean to Sa 2 ½
• Pier ring beams
Coating system
PPG SIGMASHIELD 880 @ 600 µm

Volume
2,900 Liters

25 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Wharf Fender Frames RU V Refinery – Jetty Fenders at


JT 7A
Location
BAE Melbourne Williamstown, Australia
Location
Pertamina – Balikapan, Indonesia
Environment
Marine
Environment
Marine
Coating system
PPG SIGMASHIELD 880 @ 700 μm
Coating system
PPG SIGMASHIELD 880 @ 500 μm
• Abrasive blast clean to Sa 2 ½
• Jetty fender
• Jetty fender JT 7A at Pertamina in Balikpapan
• Spot abrasive blast clean to Sa 2 ½ & HPWJ
• Airless spray application after silica sand blasting (Sa.2)
to an average DFT of 500µm
• Inspection was done on the coating PPG SIGMASHIELD
880 15 month after application. Reported in excellent
condition.

26 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

PY35-2/1 Subsea Equipment Fremantle & Attach Wharf


Remediation – Maintenance &
Year Repair
2014

Location Coating system (C5-M)


China PPG SIGMASHIELD 880 @ 400 μm
PPG SIGMASHIELD 880 @ 400 μm

Fabricator
CNOOC ShenZhen

Environment
Marine

Coating system
PPG SIGMAWELD 160
PPG SIGMASHIELD 880
PPG PHENGUARD 930
PPG SIGMALINE 780

27 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


Field Survey Result:
China General Nuclear (CGN) Rudong
Offshore Wind Project
The installation of the CGN Rudong wind power project was completed in September, 2015. A PPG coating system was
used for the foundation section, which was completed in May, 2015. The scope of the survey was to evaluate and confirm
the condition of the PPG coating applied to the foundation section after one year in service.

Project Name
CGN Rudong Offshore Wind Power Project

Owner
CGN Rudong Offshore Wind Power Co., Ltd.

Region/Country
Rudong/China

Year
August, 2016 1

Participant The yellow color of the foundation section shows where


PPG paint was applied.
PPG: Liu Yang/Lu Guoping
CGNPC: Engineer Zhou/Engineer Ma

Existing coating system


Foundation piles, exterior part
The first coating layer: PPG SIGMASHIELD 880 RAL 1018
The second coating layer:PPG SIGMASHIELD 880 RAL 1018 @ 500 μm
The third coating layer: PPG SIGMADUR 188 Y07 @ 500 μm
The fourth coating layer: PPG SIGMADUR 188 Y07 @ 40 μm
@ 40 μm
Cable pipe, ladder and handrail
The first coating layer: PPG SIGMACOVER 280 GREY
The second coating layer:PPG SIGMASHIELD 880 RAL 1018 @ 50 μm
The third coating layer: PPG SIGMADUR 188 @ 400 μm
2
The fourth coating layer: PPG SIGMADUR 188 @ 40 μm
@ 40 μm The general condition of the foundation section was good.
3 5

The draft mark was 64.5 meters. Random DFT checking.

4 6

The general condition of the foundation section was good. Random DFT checking.
PPG Track Record
PPG SIGMASHIELD™ 880

PPG SIGMASHIELD 880

Asset
Year Project Name Project Type Owner Builder
Country

Offshore

2018 EPC of SK408 Larak Malaysia New Construction Sapura — 40%, Petronas Sapura Fabrication
& Bakong Wellhead Carigali — 30% and Shell Sdn Bhd
Platform & Jacket — 30%
2016 Huaneng Offshore China New Construction Huaneng Group Shanghai Zhenhua
Booster Station Heavy Industry Co.,
Ltd.
2014 PY35-2/1 Subsea China New Construction CNOOC Ltd. Shenzhen
Equipment
2013 Offshore Maintenance Maintenance and Murphy Oil Dayang Enterprise
Murphy Oil Kikeh Sabah Repair
Congorep/Perenco Africa Maintenance and Prezioso — Congo
Platform Repair

Offshore Wind

2019 Three Gorges Group China New Construction Three Gorges Group Penglai Dajin Ocean
Dalian Zhuanghe 28 units Heavy Duty Co.,Ltd.
Offshore Wind Power
Foundation Pile
2018 Guohua Dongtai Offshore China New Construction China Power Holding ZPMC
Booster Station Co.,Ltd.
Hangzhou China New Construction Hangzhou Zhongde Hangzhou Zhongde
ZhongdeTransmission Transmission Transmission
Wind Power Euipment
Shenhua Guohua Dongtai China New Construction Guahua Jingsu Wind Envision Energy
75 x 4MW Offshore Wind
Power Project
Yuedian Zhanjiang Wailuo China New Construction Guangdong Yuedian ZPMC
Offshore Booster Station Group
2017 China Hydropower Tian China New Construction Sinohydro Corporation Tianjin Port
Jin South Port Offshore Engineering
Wind - Foundation Piles
Hebei Construction & China New Construction Hebei Construction and Tianjin Port
Investment Group Laoting Investment Group Engineering
Offshore Wind Power
Project
Longyuan Dafeng China New Construction Longyuan Power Shanghai Zhenhua
Offshore Booster Station Port Machinery
Project Company
Zhoushan Putuo No.6 China New Construction China Guodian Ningbo United
Wind Power Steel Pipe Corporation Zhoushan Petrochemical
Pile Project - Phase I Branch
Guangheng Luneng China New Construction Luneng Jiangsu No.4 Engineering of
Wind Offshore 200MW Guangheng New Energy CCCC Third Harbor
Foundation Pile Project Engineering

30 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Asset
Year Project Name Project Type Owner Builder
Country

Offshore Wind

2016 CPI Binhai H2# 400MW China New Construction CPI Binhai Wind-Offshore Huadian Heavy
Offshore Wind Power — Co., Ltd. Industries Co., Ltd.
Booster Station

Datang Huayin Guodian China New Construction China Datang Corporation Hunan Jinfeng
Longyuan Wind Power & China Guodian Steel Structure
Project Corporation Engineering Co.,
Ltd.
Rudong Offshore Wind China New Construction China Huaneng Group Shanghai Zhenhua
Power — Pipe Pile Co., Ltd. Heavy Industry Co.,
Ltd. (ZPMC)
2015 CGN Rudong Offshore China New Construction CGN Rudong Offshore Siemens
Wind Power Wind Power
CLP Binhai Offshore Wind China New Construction CLP Binhai Offshore Wind Siemens
Power Power
Huadian Wind Power Pile China New Construction China Power Investment Penglai Jutao
Foundation Corporation Co.,Ltd.
Huaneng Rudong China New Construction Huaneng Rudong Chongqing
Offshore Wind Power Offshore Wind Power Haizhuang

Petrochem

2019 Spunpile RDMP (Refinery Indonesia New Construction Pertamina RU V Maxi Duta Karya
Development Master Balikpapan
Plan) Balikpapan

2017 Bahrain LNG Terminal — Bahrain New Construction Bahrain LNG/GS E&C Samkang M&T
Jacket
Holborn Refinery Germany Maintenance and Holborn
Repair
2015 Ichthys Australia New Construction Mephanlene Mephanlene
2014 CNPC - Guangdong China New Construction Pertamina RU V Maxi Duta Karya
Petrochemical Group Balikpapan
Co., Ltd, — Crude Oil and
Finished Oil Dock
Duinkerken (Dunkirk) LNG France Fluxys Group
Terminal
Pertamina Refinery Unit Indonesia Pertamina Refinery Unit IV
IV — Jetties
Pertamina Refinery Unit Indonesia Pertamina Refinery Unit V
V — Jetties

31 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880

Asset
Year Project Name Project Type Owner Builder
Country

Infrastructure

2020 Vizierschuiven Nederrijn The New Construction Rikswaterstaat (RWS)


Netherlands
2019 Merudi Bridge & Sg. Krian Malaysia New Construction JKR PETRO Pipe SABAH
Bridge Project
SASSEVAART Lock Gates China New Construction SASSEVAART Penglai Dajin Ocean
and Bridges Project Heavy Duty Co.,Ltd.
2018 New Beatrixsluis — Sheet The Rikswaterstaat (RWS)
Piles Netherlands
Ningbo Zhoushan Port China New Construction Wuchuan Heavy Wuchuan Heavy
Main Passage (Yushan Engineering Co., Ltd. Engineering Co.,
Petrochemical Shugang Ltd.
Road) Navigate Ship
and Bridge Collision
Prevention Facilities
Sluice Gate Hengelo The Rijkswaterstaat (RWS)
Netherlands
2017 Graving Dock Project Indonesia New Construction Polairud Neoganesha
International
Haringlietdam The Maintenance and Rijkswaterstaat (RWS)
Netherlands Repair
PTP Pipe Piles Project Malaysia New Construction Johor Port Authority Oriental Steel Pipe
2015 Elizabeth Quay Piles Australia New Construction Brookfield Multiplex Brookfield Multiplex

Fort Hill Wharf Darwin Australia Maintenance and Darwin Ports Corporation P&C Maintenance
Repair
Maintenance and MMA — Mermaid Marine
MMA Wharf Piles Australia
Repair Australia
Maintenance and Port Headland Port Total AMS/UPC
Port Headland Jetty Australia
Repair Authority
2014 Guangzhou Container China New Construction Guangzhou Container ZPMC Auxiliary
Terminal Co., Ltd — 2 sets Terminal Co., Ltd. Machinery Co., Ltd.
of Quay Crane

Jingtang Harbor of China New Construction Tangshan Port Industry ZPMC Auxiliary
Tangshan Port — 3 sets Group Machinery Co., Ltd.
of Bridge Type Grab
Unloader
Jupiters Casino Australia Queensland Department Allied Coating
Expansion Project — of Transport and Main Services
Bridge Piles Roads
Oosterscheldekering The Maintenance and Rikswaterstaat (RWS)
Netherlands Repair
Pier Ring Beams Australia Nelson Pier
Port of Scheveningen The Municipality of The Hague
Netherlands
Wharf Fender Frames Australia BAE

32 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880/880GF/880XS

Project References
PPG SIGMASHIELD™ 880GF

33 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880/880GF/880XS
IJmuiden Sea Lock,
IJmuiden, The Netherlands
PPG’s sustainable coating system
ensures 30-year protection for the
world’s largest sea lock

Case study

The Customer
The Customer
Rijkswaterstaat (RWS), Ministry of Infrastructure and Water Rijkswaterstaat (RWS) is responsible for the asset
Management management and maintenance of the main infrastructure
facilities in The Netherlands.

The Location The current North Lock (built in 1929) will reach the end
IJmuiden, The Netherlands of its technical service life in 2029 and has become too
small for today’s increasingly larger seagoing vessels. A
new lock was needed as the North lock, which measures
The Challenge 400 x 50 x 13 meters, is also coming to the end of its
To provide effective and extended coating protection economic lifespan. The new IJmuiden sea lock (500 x 70 x
over 30 years for the lock gates and fenders in the world’s 18 meters), which provides access to the Amsterdam port
largest sea lock project area, will become the world’s largest sea lock. The work
commenced in 2016 and is due to be completed by the
end of 2019.
The Solution
PPG SIGMAPRIME® 200 universal epoxy primer; PPG The contract was awarded to the OpenIJ consortium,
SIGMASHIELD™ 880GF surface-tolerant, high-build glass which consists of BAM PPP PGGM (50%), and
flake epoxy; PPG SIGMADUR™ 1800 high-solids polymeric VolkerWessels and DIF (50%).
urethane

The Challenge
The Benefits
Specifically designed for offshore splash zones and The IJmuiden sea lock will be exposed to a range of
heavy-duty environments, our epoxy glass flake system destructive forces generated by freshwater and saltwater:
delivers outstanding protection, can be rapidly immersed, ships, tides, UV rays, sea mist, rain, condensation, and the
and continues to cure upon seawater immersion. continuous combined effects of oxygen and water.
The system is superior to FRP with greater corrosion
protection, easier application, and produces greater The project is a long-term PPP (Public-Private Partnership)
productivity contract of 30 years (4 years of construction and 26 years
of service life). Accordingly, RWS expects to benefit from
the security of a well-constructed and proven asset that
The Result will be in good condition after 30 years when the sea lock
Our global expertise and capability, reinforced by our returns to RWS.
unified, cross-continent technical support, enabled
this important project to be implemented smoothly.
Experienced teams in The Netherlands and South Korea
provided the most suitable solutions to meet the lock’s
30-year lifetime span along with on-site field technical
support during the fabrication phase

34 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD
Ijmuiden ™
880/880GF/880XS
Sea Lock, IJmuiden, The Netherlands
PPG’s sustainable coating system ensures 30-year protection for the world’s largest sea lock

The Solution

Initially, a FRP (Fiber Reinforced Polyester) product was


stipulated in the contract painting specification. However,
Rijkswaterstaat chose a more robust system that would
provide the required 30-year protection span.

Our system used surface preparation according to ISO 8501


Sa 2½ and steel dressing according to NORSOK M501 and
comprised these products:

Splash and Above Water Area (Exterior):


PPG SIGMAPRIME™ 200 @ 150 µm
PPG SIGMASHIELD 880GF @ 300 µm
PPG SIGMASHIELD 880 GF @ 300 µm
PPG SIGMADUR™ 1800 @ 50 µm
PPG SIGMADUR 1800 @ 50 µm The PPG SIGMADUR 1800 coating uses Versatic
technology, which means that the topcoat will provide
Splash and Above Water Area (Interior): superior weathering resistance, enhanced gloss retention
PPG SIGMAPRIME 200 @ 150 µm and superior chalking resistance compared to conventional
PPG SIGMASHIELD 880GF @ 300 µm polyurethane, to meet the project’s requirement for 30
PPG SIGMASHIELD 880GF @ 300 µm years.

Under Water Area (Interior and Exterior)


PPG SIGMAPRIME 700 @ 175 µm The Result
PPG SIGMAPRIME 700 @ 175 µm
Our global expertise and capability proved to be particularly
valuable with our cohesive cross-continent support enabling
The Benefits this important project to be executed smoothly.

JV OpenIJ chose the PPG SIGMASHIELD 880GF coating The PPG Netherlands team provided professional
system over the traditional FRP system based on our range technical consultation to discuss the customer’s precise
of highly effective product solutions, proven track record, project needs and then provide appropriate solutions. In
combined with the crucial ability to provide cross-border addition, the PPG South Korea team was able to provide
support. comprehensive on-site field technical support during the
fabrication phase in South Korea.
Our PPG SIGMASHIELD 880GF durable epoxy system
provides outstanding protection and is specifically Supplying our PPG’s sustainable coating system to provide
designed for use in offshore splash zones and heavy-duty long-lasting protection for the world’s largest sea lock
environments. The coating can be rapidly immersed and project is a momentous achievement and will surely provide
continues to cure upon seawater immersion, making it the impetus for further project wins of this type.
ideal for splash zones. Our PPG SIGMAPRIME 200/ PPG
SIGMASHIELD 880GF system is approved as per the
NORSOK M-501 System 7A standard.

35 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Croatia Peljesac Bridge – Jetty


Pile

Year
2018 – 2022 (planned)

Location
Croatia

Owner
Croatia Peljesac Bridge

EPC
China Road & Bridge Corporation (CRBC)
CNOOD Asia Limited

Fabricator
ZPMC

Coating system
PPG SIGMAPRIME® 200 @ 150 µm
PPG SIGMASHIELD™ 880GF @ 350 µm
PPG SIGMASHIELD 880GF @ 350 µm

The Peljesac Bridge is a cable-stayed bridge that will


connect the Croatian mainland to the peninsula of Peljesac,
and is set to be completed by the end of 2022. The bridge
will have four lanes of traffic and measure 2.4 km long by 21
meters wide. Once completed, the span will be the second
largest in Europe.

There are total of 148 planned permanent pillars ranging in


height from 36 to 128.6 meters with diameters from 1.8 to
2 meters. The piles were fabricated in China by ZPMC and
installed by CRBC.

The PPG SIGMASHIELD 880GF system was chosen due to


its high-build and long-term protection plus its extensive
track record.

36 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

LBC Terminal Extension – Port of Rotterdam


Remming Jetty Location
The Netherlands

Year
2016 Owner
Port of Rotterdam

Location
The Netherlands Coating system
PPG SIGMASHIELD™ 880GF

Owner
Port of Rotterdam PPG SIGMASHIELD 880GF was applied where initially
fiberglass reinforced polyester coating was specified.

Coating system
PPG SIGMASHIELD™ 880GF @ 2 x 500µm

PPG SIGMASHIELD 880GF was applied where initially


fiberglass reinforced polyester coating was specified.

37 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Rampion — Substation Jacket Rudong Offshore Windmill

Year Year
2016 2016

Customer Fabricator
HSM Offshore in Holland won the construction of the Zhenhua Heavy Industries (ZPMC)
substation jacket foundation (2.200 sqm)

Location
Project Nantong, China
Babcock Rampion Offshore Windfarm, consisting of 116
windmill/foundations and one substation, is located 13
kilometers off the Sussex coast Coating system
PPG SIGMASHIELD™ 880GF @ 400 μm

Operator/Developer
Development and operation is carried out by E.ON • Protect wind tower foundations against saltwater
immersion and abrasion
• Fast dry: dry to handle in 5 hours at 25-30⁰C (77-85⁰F)
Main system • Easy application and fabrication efficiency
Norsok System 7A
SIGMAPRIME 200
SIGMASHIELD 880GF
SIGMADUR 520

Solution
PPG supplied systems according to E.ON specification,
consisting of Norsok M-501 Rev. 6, System 7A

38 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

ITC Rubis Terminal Extension – Sandbank — Substation


Piles
Year
2015
Year
2015
Customer
Bladt Industries of Denmark won the construction of the
Location substation (18.000 sqm.) – topside and jacket foundation
The Netherlands

Project
Owner Sandbank Offshore Wind Farm, consisting of 72 windmill/
Port of Antwerp foundations (4 MW) and one substation, is located 90
kilometers west of the island of Sylt in the German part of
the North Sea
Coating system
PPG SIGMASHIELD™ 880GF @ 2 x 200µm
PPG SIGMADUR™ 520 Operator/Developer
Development and operation is carried out between
Vattenfall and Stadtwerke München (SWM)

Solution
PPG supplied coating system according to Vattenfall
specifcation, compliant to Norsok M-501 Rev. 6
specification 7A and other Norsok related systems with
higher dryfilmthickness

Main systems
Atmospheric System
PPG SIGMAPRIME 200/PPG SIGMASHIELD 880GF/
PPG SIGMADUR 520
(Topside)

Norsok System 7A
3 coats of PPG SIGMASHIELD 880/PPG PSX 700
(Jacket)

39 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Rudong Longyuan Wind Power Rudong Longyuan Wind Power

Year Year
2014 2011

Owner Owner
Jiangsu Longyuan Offshore Wind Power Co., Ltd. Jiangsu Longyuan Offshore Wind Power Co., Ltd.

Manufacturer Manufacturer
Jiangsu Envision Sinovel

Number of pile foundations (set) Number of pile foundations (set)


35 sets 17 sets

Installed capacity per tower Installed capacity per tower


4 MW 2 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0m section range
Product: PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMADUR 188
Total DFT: 1080 μm

Section: Exterior surface of steel pipe pile: –4.0 m to


+16m section range
Product: PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
Total DFT: 800 μm

Section: Interior surface of steel pipe pile: +11.0 m to


+4.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 500 μm

Section: Interior surface of steel pipe pile: +4.0 m to


+16.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

40 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Rudong Longyuan Wind Power

Year
2010

Owner
Jiangsu Longyuan Offshore Wind Power Co., Ltd.

Manufacturer
Jiangsu Envision

Number of pile foundations (set)


21 sets

Installed capacity per tower


2.5 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0 m section range
Product: PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
Rudong Longyuan Wind Power PPG SIGMADUR 188
Total DFT: 1080 μm
Year Section: Exterior surface of steel pipe pile: –4.0 m to
2012 +16 m section range
Product: PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
Owner PPG SIGMASHIELD 880 GF
Jiangsu Longyuan Offshore Wind Power Co., Ltd. Total DFT: 800 μm

Section: Interior surface of steel pipe pile: +11.0 m to


Manufacturer +4.0 m section range
Gold Wind Science & Technology Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT:500 μm
Number of pile foundations (set)
18 sets Section: Interior surface of steel pipe pile: +4.0 m to
+16.0 m section range
Product: PPG SIGMASHIELD 880
Installed capacity per tower PPG SIGMASHIELD 880
2.5 MW PPG SIGMASHIELD 880

41 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Rudong Longyuan Wind Power

Year
2009

Owner
Jiangsu Longyuan Offshore Wind Power Co., Ltd.

Manufacturer
Sany Heavy Industry

Number of pile foundations (set)


2 sets

Installed capacity per tower


2.5 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0 m section range
Product: PPG SIGMASHIELD 880 GF
Total DFT: 800 μm PPG SIGMASHIELD 880 GF
Total DFT: 800 μm PPG SIGMASHIELD 880 GF
Rudong Longyuan Wind Power PPG SIGMADUR 188
Total DFT: 1080 μm

Section: Exterior surface of steel pipe pile: –4.0 m to


Year
+16 m section range
2010
Product: PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
Owner
Total DFT: 800 μm
Jiangsu Longyuan Offshore Wind Power Co., Ltd.
Section: Interior surface of steel pipe pile: +11.0 m to
+4.0 m section range
Manufacturer
Product: PPG SIGMASHIELD 880
Gold Wind Science & Technology
PPG SIGMASHIELD 880
Total DFT: 500 μm
Number of pile foundations (set)
Section: Interior surface of steel pipe pile: +4.0 m to
19 sets
+16.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Installed capacity per tower
PPG SIGMASHIELD 880
1.5 MW
Total DFT: 800 μm

42 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Rudong Longyuan Wind Power Rudong Longyuan Wind Power

Year Year
2009 2009

Owner Owner
Jiangsu Longyuan Offshore Wind Power Co., Ltd. Jiangsu Longyuan Offshore Wind Power Co., Ltd.

Manufacturer Manufacturer
Chongqing Haizhuang Sinovel

Number of pile foundations (set) Number of pile foundations (set)


2 sets 2 sets

Installed capacity per tower Installed capacity per tower


2.5 MW 2.5 MW

Coating system for foundation piles


Section: Exterior surface of steel pipe pile: +11.0 m to
–4.0 m section range
Product: PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMADUR 188
Total DFT: 1080 μm

Section: Exterior surface of steel pipe pile: –4.0 m to


+16 m section range
Product: PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
PPG SIGMASHIELD 880 GF
Total DFT: 800 μm

Section: Interior surface of steel pipe pile: +11.0 m to


+4.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 500 μm

Section: Interior surface of steel pipe pile: +4.0 m to


+16.0 m section range
Product: PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
PPG SIGMASHIELD 880
Total DFT: 800 μm

43 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

PPG SIGMASHIELD 880GF Test Report for


Thai Oil Refinery Jetty Pile Project

Date 2017

44 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

TEST PIPE INSPECTION REPORT

1. PROJECT DETAIL

Owner : Thai Oil Refinery, Jetty Pile Project, Laem Chabang Port, Chonburi Province, Thailand.

Client : Petro-Pipe Sabah Paint Manufacture: PPG Coatings (China) Inc.

Project: 16m x 1000 mm Ø Pipe - External Substrate: Carbon steel

2. COATING SYSTEM

Coat No. Product name Minimum DFT (µm)

1st coat SigmaShield 880 GF (Black) 800

3. SURFACE PREPARATION

Surface cleanliness achieved: ISO Sa 2.5 Remarks

Cleaning method: Auto blasting


The pipes were blasted in dual stage method. 1st stage
Surface profile achieved: 70 ~ 90 microns is using steel shot mainly to remove mill scale and rust,
achieve Sa 2.0 standard but in general the profile is
Steel Shot S-330 low. This pipes then continues into another blasting
Abrasive size used: chamber which uses steel grit to get the surface profile
Steel Grit G25(GL) with Sa2.5 at 90 microns average.

Air pressure used: 2 Bar

4. AMBIENT CONDITION

Date/Time 15/03/2017 @ 0930

Dry Bulb. ( ºC ) 29.6

Wet Bulb. ( ºC ) 24.7

Relative Humidity ( % ) 66.9

Surface Temp. ( ºC ) 29.9

Dew Point ( ºC ) 22.8

45 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

5. PAINT APPLICATION

Coating layer Test 1 Test 2 Test 3

Date/Time applied 15/03/2017 @ 1040 15/03/2017 @ 1430 16/03/2017 @ 0900

Paint applied SigmaShield 880 GF SigmaShield 880 GF SigmaShield 880 GF

Application method Airless spray Airless spray Airless spray

Spray tip size used 535 527 531

Air pressure at pump 2.5 Bar 2.0 Bar 2.0 Bar

Rotation Speed * 21.21 15.18 17.14

Travelling Speed * 2.49 2.0 3.02

Overlap coat # 5~6 5~6 5~6

Batch No (Base) 8733330791 8733330791 8733330791

Batch No (Curing Agent) 8732T00751 8732T00751 8732T00751

Batch No ( Thinner ) – – –

WFT ( µm ) 800 ~ 900 950 ~ 1100 950 ~ 1100

DFT Reading ( µm ) 400 – 750 800~950 800~950


Sag Free, Heavy orange Sag Free, smooth / very Sag Free, intermediate
Visual Inspection
peel surface low orange peel surface between tip 535 and 527

6. REMARKS

* number shown are based on the display panel on the equipment itself.
Application was witnessed/attended by Mr. Enver Hermie

PPG Performance Coatings Petro-Pipe (Sabah) Petro-Pipe (Sabah)


Technical Representative QC/QA Superintendent QC/QA Manager

Name Mohd Wahidduzzaman Name Charles Mark Majuil Name Joelee Jumit

Date Date Date

46 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

TEST PIPE INSPECTION REPORT

For complete information on the parameter and conditions used while painted, please refer to the Pipe
Inspection Report.

Pipe inspection area

PHOTO 1

Steel Shot being used in the auto


blasting machine
S 330

PHOTO 2

Steel Grit being used in the auto


blasting machine

G 25 (GL)

PHOTO 3

QMS / FTS Reporting Forms Issued: 08/07/01 FFTS05.PH

47 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Surface Profile obtained after the 2nd


Blast

30 gauge reading
• Low 47 microns
• High 170 micron
• Average 90 microns

PHOTO 4

Ambient condition

Steel temp ~ 30 ºC

RH ~ 70%

PHOTO 5

QMS / FTS Reporting Forms Issued: 08/07/01 FFTS05.PH

48 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Condition of the steel pipe prior to


the blasting process

PHOTO 6

Condition of the steel pipe’s surface


after 2nd blast to get the anchor
profile.

PHOTO 7

Close up on the weld seam


condition

PHOTO 8

QMS / FTS Reporting Forms Issued: 08/07/01 FFTS05.PH

49 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Paint mixing station

Mixing of the base and hardener


using a mechanical stirrer with blade
impaller.

PHOTO 9

Painting being done on the pipe

PHOTO 10

Distance between the tip and


surface is set at 55 cm.

PHOTO 11

QMS / FTS Reporting Forms Issued: 08/07/01 FFTS05.PH

50 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

Ambient condition while painting is


being done.

Steel Temp ~ 29 ºC

RH ~70%

PHOTO 12

Finished pipes being laid after


painting is completed.

On right side, the pipes that have


been blasted, waiting to be painted
in line.

PHOTO 13

QMS / FTS Reporting Forms Issued: 08/07/01 FFTS05.PH

51 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880GF

PPG SIGMASHIELD 880GF

Asset
Year Project Name Project Type Owner Builder
Country

Offshore

2018 EPC of SK408 Larak Malaysia New Construction Sapura - 40%, Petronas Sapura Fabrication
& Bakong Wellhead Carigali - 30% & Shell - Sdn Bhd
Platform & Jacket 30%

Offshore Wind

2018 Guohua Dongtai Offshore China New Construction China Power Holding ZPMC
Booster Station Co.,Ltd.
Shenhua Guohua Dongtai China New Construction Guahua Jingsu Wind Envision Energy
75X4MW Offshore Wind
Power Project
Yuedian Zhanjiang Wailuo China New Construction Guangdong Yuedian ZPMC
Offshore Booster Station Group
2015 CGN Offshore Booster China New Construction CGN (China General ZPMC
Stations Nuclear Power Group)
2014 Rudong Wind Power China New Construction Jiangsu Longyuan Jiangsu Jinboxiang
Project Technology Co., Ltd.

Petrochem

2018 Thai Oil Jetty Project Thailand New Construction Thai Oil ASP

2015 ITC Rubis Terminal The Port of Antwerp


Extension — Piles Netherlands

Infrastructure

2022 Croatia Peljesac Bridge — Croatia New Construction Croatia Peljesac Bridge China Road &
(planned) Jetty Pile Bridge Corporation
(CRBC)
2019 Hammer MHU 1700 Indonesia New Construction Saipem Indonesia

Ijmuiden Sea Lock The New Construction Rijks Water Staat (RWS)
Netherlands
2018 Ningbo Zhoushan Port China New Construction Wuchuan Heavy Wuchuan Heavy
Main Passage (Yushan Engineering Co., Ltd. Engineering Co.,
Petrochemical Shugang Ltd.
Road) Navigate Ship
and Bridge Collision
Prevention Facilities
2017 OpenIJ SeaLock Gates The New Construction Open IJ DS HI Metal
Project Netherlands
2016 LBC Terminal Extension — The Port of Rotterdam
Remming Jetty Netherlands
Port of Rotterdam The Port of Rotterdam
Netherlands

52 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880/880GF/880XS

Project References
PPG SIGMASHIELD™ 880XS

53 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880XS

Webb Dock Redevelopment, Port of Melbourne Corp

Year The Port of Melbourne is largest container and general


2016 cargo port. The project required a coating to meet AS/NZS
3750 “ultra-high-build epoxy standard” which required a
minimum of 1,500 microns DFT in a single application.
Project
Webb Dock Redevelopment Additionally, the project requires “fast cure” in old winter
temperature (5 - 12⁰C) so as to be handled 18 hours after
application.
Location
Victoria, Australia PPG SIGMASHIELD 880XS provides ultra-high-build film
thickness and excellent abrasion resistance. Its “Hot-
Applied, Cold Cure” (HACC) process significantly reduces
Owner project throughput time. PPG SIGMASHIELD 880XS was
Port of Melbourne Corporation selected to fulfill customer’s immediate and long-term
objectives.

Applicator
Geelong Abrasive Blasting

System
PPG SIGMASHIELD 880XS

Volume
110,000 Liters

54 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880XS

Ciclo Combinado Empalme I -


Fossil Power Water Intake

Year
2016

Location
Mexico

Owner
Commission of Electricity, Mexico

Builder
OHL Industrial Sener

Contractor
Panyu Chu Kong Steel Pipe (Zhuhai)

Coating ystem
PPG SIGMASHIELD 880XS

55 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880XS

Fifth Iron Ore Loading Berth Extension Project, Anderson Point


Facility (AP5) – Tubular Pile Package

Customer
Owner: Fortescue Metals Group, Australia
Main Contractor: BAM Clough JV, Australia
Engineering: BAM International (Delta Marine
Consultants) Sub-contractor: Mill-Pro,
Australia
Fabricator: Ningbo Sanding Steel Pipe Engineering,
China (NSSPE)

Location
Anderson Point, Port Hedland, Western Australia

Challenge
To meet stringent delivery schedule

Solution
PPG SIGMASHIELD 880XS, Ultra High Build Epoxy
Coatings, suitable for hot applied, hot cured process, while
meeting AS/NZS 3750.2; 2008 standard

Benefits
• Save energy
• Improved throughput time
• Suitable for bulk supply (Base: no 900 lt, Hardener : 300
lt)
• No pin holes on weld seams so no stripe coat needed
• Excellent corrosion and impact resistance to minimize
touch-up work
• Superior abrasion and outstanding cathodic protection to
prolong asset service life

Result
• Fast turnaround – 1 hour after LONGKEY* process, the
pipes are ready to ship.
• Reduce environmental impacts by utilizing bulk package
which will significantly reduce number of cans and paint
waste. Due to the toughness of PPG SIGMASHIELD
880XS, the project will require minimal on-site touch-up
work after long distance sea transportation.

56 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880XS

PPG SIGMASHIELD 880XS

Asset
Year Project Name Project Type Owner Builder
Country

Offshore Wind

2017 Longyuan Dafeng China New Construction Longyuan Power Shanghai Zhenhua
Offshore Booster Station Port Machinery
Project Company

Power

2016 Ciclo Combinado Mexico New Construction Mexico's Federal OHL Industrial
Empalme I Electricity Commission SENER

Infrastructure

2016 Webb Dock Australia New Construction Port of Melbourne Geelong Abrasive
Redevelopment Blasting
2015 Navigation Towers Australia New Construction Port of Melbourne Macfab
2014 Anderson Point Facility Australia New Construction Fortescue Metals Group Ningbo Sanding
(AP5) — Tubular Pile (FMG) Steel Pipe
Engineering

57 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMASHIELD™ 880/880GF/880XS

Project References
PPG SIGMACOVER™ 850

58 PPG Track Record — PPG SIGMASHIELD 880/880GF/880XS


PPG Track Record
PPG SIGMACOVER™ 850

CGNPC Zhejiang Daishan The Three Gorges Dalian


Offshore Booster Station Zhuanghe Offshore Wind Power -
Foundation piles
Year
2019
Year
2019
Owner
CGN
Owner
The Three Gorges Group
Builder
ZPMC
Number of pile foundations (set)
28
Coating system for booster station (anti-corrosion)
Product
PPG SIGMAZINC 109HS @ 80µm Installed capacity per tower
PPG SIGMACOVER 850 @ 400µm 6.45 MW
PPG SIGMADUR 550 @ 60µm

Builder
Coating system for booster station (fire protection) Penglai Dajin Co.,Ltd.
Product
PPG SIGMAZINC 109HS @ 80µm
PPG PITT-CHAR XP @ 10000µm Coating system for foundation pile (interior)
PPG SIGMADUR 550 @ 60µm Product
PPG SIGMACOVER 850 @ 500µm

Coating system for jetties (anti-corrosion)


Product Coating system for foundation pile (exterior)
PPG SIGMACOVER 850 @ 400µm Product
PPG SIGMADUR 550 @ 60µm PPG SIGMACOVER 850 @ 500µm
PPG SIGMADUR 550 @ 60µm

Coating system for jetties (splash zones)
Product
PPG SIGMACOVER 850 @ 600µm

59
11 PPG Offshore
Track Record
Wind—Power
PPG SIGMACOVER
Track Record 850
PPG Track Record
PPG SIGMACOVER™ 850

Huaneng Guanyun Offshore


Boost Station and Luneng
Rudong Offshore Boost Satation

Year
2019

Owner
Huaneng and Lunneng Corporation

Manufacturer
CPOE

Coating system for booster station (anti-corrosion) CGN Pingtan Dalian Land 20 x
Product
PPG SIGMAZINC 109HS @ 80µm 5MW Offshore Wind
PPG SIGMACOVER 850 @ 200µm
PPG SIGMADUR 550 @ 60µm
Year
2019

Coating system for booster station (fire protection)
Product
Owner
PPG SIGMAZINC 109HS @ 80µm
CGN Fujian
PPG SIGMACOVER280 @ 60µm
PPG PITTCHAR NX @ 5.3mm
PPG SIGMADUR 550 @ 60µm
Builder
Fujian Yifan New Energy Equipment

Shuangchuang Zhugengsha 150 Coating system


Product
x 2.5MW Offshore Wind PPG SIGMACOVER 850
PPG SIGMADUR 550
PPG SIGMAZINC 109HS
Year
2019

Owner
Dongtai Shuangchuang New Energy

Builder
Jiangsu Hantong Ship Building

Coating system
Product
PPG SIGMACOVER 850
PPG SIGMACOVER 280
PPG SIGMADUR 550
PPG SIGMAZINC 109HS
PPG SIGMAGUARD 730

60 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Guohua Jiangsu Zhugengsha H1 Datang Binhai Foundation Piles


50 x 4MW Offshore Wind 45 x 3.3MW+50*3MW Offshore
Wind Power - Foundation Piles
Year
2019
Year
2018
Owner
Jiangsu Guohua New Energy
Owner
Datang Guoxin Binhai Offshore Wind Power
Builder
Nantong Taisheng Landao Ocean Engineering
Number of pile foundations (set)
95
Coating system
Product
PPG SIGMACOVER 280 Installed capacity per tower
PPG SIGMACOVER 850 3.3 MW/3 MW
PPG SIGMADUR 550
PPG SIGMAZINC 109HS
Builder
Datang Power

Jiangsu Rudong H14 Huangsha


Coating system for foundation pile (interior)
Ocean 50 x 4MW Offshore Wind Product
PPG SIGMACOVER 850 @ 800µm
– Jetty Pile
Coating system for foundation pile (exterior)
Year Product
2019 PPG SIGMACOVER 850 @ 1000µm
PPG SIGMADUR 550 @ 80µm

Owner
Jiangsu Rudong

Coating system
Product
PPG SIGMACOVER 280
PPG SIGMACOVER 850
PPG SIGMADUR 550
PPG SIGMAZINC 109HS

61 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Guodian Zhoushan Offshore Longyuan Dafeng H7 80 x 2.5MW


Wind Power - Foundation Piles Offshore Wind Power - Booster
Station
Year
2018
Year
2018
Owner
Zhoushan Guodian Corporation
Owner
Jiangsu Longyuan Dafeng New Energency Co., Ltd.
Number of pile foundations (set)
63
Builder
Shanghai Electircity Co., Ltd.
Installed capacity per tower
4MW

Shenhua Guohua Dongtai 75 x


Builder
Zhongjiao Three Aviation Bureau Ningbo Branch 4 MW Offshore Wind Power
Project - Foundation Piles
Coating system for foundation pile (exterior)
Product
Year
PPG SIGMACOVER 850
2018
PPG SIGMACOVER 850
PPG SIGMADUR 550
Owner
Guanhua Jinsu Wind Co., Ltd.

Guohua Dongtai Offshore Number of pile foundations (set)


75
Booster Station
Builder
Year
Landao Marine Engineer Co., Ltd.
2018

Coating system for foundation pile (exterior)


Owner
Product
China Power Holding Co.,Ltd. PPG SIGMACOVER 850
PPG SIGMACOVER 850
PPG SIGMADUR 550
Builder
ZPMC Coating system for booster station (fire protection)
Product
PPG SIGMACOVER 280
Coating system for booster station (anti-corrosion) PPG PITT-CHAR NX
Product PPG SIGMAUR 550
PPG SIGMAZINC 109HS @ 80µm
PPG SIGMACOVER 850 @ 400µm
PPG SIGMADUR 550 @ 60µm

62 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Jiusi Rudong 300MW Offshore Tangshan Laoting Bodhi Island


Wind Power - Foundation Piles Offshore - Booster Platform

Year Year
2018 2017

Owner Owner
Jiusi Rudong Offshore Wind Co.,Ltd. China Guodian Corporation

Builder Builder
Rudong Haili Wind Power Co.,Ltd. Sinopec Petroleum Engineering & Construction Shengli
Corporation

Number of pile foundations (set)


75 Coating system for booster station jetties
(anti-corrosion)
Product
Installed capacity per tower PPG SIGMACOVER 850
4MW PPG SIGMACOVER 850

Coating system for foundation pile (interior)


Product
PPG SIGMAFAST 278
Tangshan LaoTing Offshore Wind
PPG SIGMAFAST 410

Year
Coating system for foundation pile (exterior) 2017
Product
PPG SIGMAZINC 109 Owner
PPG SIGMACOVER 410 HeBei Construction & Investment Group
PPG SIGMADUR 188

Manufacturer
Coating system for booster station (anti-corrosion) Siemens
Product
PPG SIGMACOVER 850
PPG SIGMACOVER 850 Number of pile foundations (set)
15 sets
PPG SIGMACOVER 850

Installed capacity per tower


Coating system for jetties (anti-corrosion) 20 MW
Product
PPG SIGMACOVER 850
PPG SIGMACOVER 850 Coating system for foundation piles
PPG SIGMADUR 550 Section: Exterior surface of steel pipe pile
Product: PPG SIGMACOVER 850
Total DFT: 800 μm
Coating system for jetties (splash zones)
Product Section: Exterior surface of steel pipe pile
PPG SIGMACOVER 850 Product: PPG SIGMASHIELD 880
PPG SIGMACOVER 850 Total DFT: 800 μm
PPG SIGMADUR 550

63 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

TangShan LaoTing 300 MW


Offshore Wind (15 Units)

Year
2017

Owner
HeBei Construction & Investment Group

Yard
Tianjing Gangheng

OEM
Siemens
BSP SCOT OES Upgrade
Coating system
Offshore SPM Replacement
Exterior: PPG SIGMACOVER 850@ 800µm
PPG SIGMASHIELD 880@ 800µm
Year
2017
Volume
50,000 Liters
Owner
Brunei Shell (Malaysia)

Coating system
Product
PPG SIGMACOVER 850
PPG SIGMAGUARD 720

SQM
2,500 SQM

64 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Zhejiang City River Channel Steel


Sheet Pile

Year
2017

Owner
Zhejiang Water Municipality (China)

Fabricator
Jiangsu ShunLi Cold-Formed Steel Industry (China)

BSP SCOT OES Upgrade Coating system


Product
Offshore SPM Replacement PPG SIGMACOVER 850

Year SQM
2017 50,000 SQM

Owner
Brunei Shell (Malaysia)

Coating system
Product
PPG SIGMACOVER 850
PPG SIGMAGUARD 720

SQM
2,500 SQM

65 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Tangshan Laoting Bodhi Island


Offshore Booster Platform

Year
2017

Owner
China Guodian Corporation (China)

Fabricator
Sinopec Petroleum Engineering & Construction
Shengli Corporation (China)

Coating system
Product Oriental 13-2 Jacket Project
PPG SIGMACOVER 850
PPG SIGMACOVER 850
Year
2017

Owner
CNOOC (China)

Fabricator
COOEC (China)

Coating system
Product
PPG SIGMACOVER 850

66 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Zhanjiang Zhongke Refinery –


Jetty
Year
2017

Owner
Sinopec-Kuwait Petrochem (China)

Fabricator
CCCC Fourth Engineering (China)

Applicator
CCCC First Harbor Engineering (China)

Coating system
Yushan Bridge Anti-Collision Product
PPG SIGMACOVER 280
System PPG SIGMADUR 550
PPG SIGMACOVER 850

Year
2017

Owner
Zhoushan Port (China)

Fabricator
ZPMC (China)

Coating system
Product
PPG SIGMACOVER 850
PPG PSX 700

67 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Bangladesh Tobacco Company Panama Windmill –


77 Units, 2.5MW each
Year
2015
Year
2014 – 2015
Asset country
Bangladesh
Asset country
Panama
Owner
Gazi Corporation Pvt. Ltd.
Owner
Panama Inter Energy
Applicator
Nanjing Shunli Steel
EPC
Goldwind
Coating system
Product
C5-M: PPG SIGMACOVER 850 @ 400µm Builder
Cheng Xi Shipyard

Volume
20,000 Liter Coating system
Product
Exterior (C5-I): PPG SIGMACOVER™ 850 @210µm
PPG SIGMADUR™ 550 @60µm
Interior(C4): PPG SIGMACOVER 850 @200µm

Volume
85,000 Liters

68 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Palm Oil Industrial Cluster (POIC)


Jetty Pile

Year
2014 – 2015

Asset country
Malaysia

Owner
Palm Oil Industrial Cluster (POIC)

Builder
Petro-Pipe Sabah (PPS)

Coating system
Product
C5-M: PPG SIGMACOVER 280 @75µm
PPG SIGMACOVER 850 @500µm

Volume
10,000 Liters

69 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

PPG SIGMACOVER 850

Asset
Year Project Name Project Type Owner Builder
Country

Offshore

2019 Petrobras P70 China New Construction Petrobras COOEC Qingdao


Tyra Maersk North Sea New Construction Maersk Sinopec 4th
Construction
Company
Weizhou 2-1 Water China CNOOC
Production and
Processing Platform
2018 EPCIC of 3 Wellhead Malaysia New Construction Petronas Carigali Brooke Dockyard
Platforms Bokor Phase 3 and Engineering
Redevelopment Works
2017 BSP SCOT OES Brunei New Construction Brunei Shell Sapura Fabrication
Upgrade Offshore SPM
Replacement Project
FWS Air Cooler Module at Malaysia New Construction Petronas Sapura Fabrication
CPP NC3CP-A
Oriental 13-2 Jacket China New Construction CNOOC CNOOC
Project
2016 Petrobras P67 Brazil New Construction Petrobras China Offshore Oil
Engineering Co.,
Ltd. (COOEC)
2015 Armada Kraken FPSO — Malaysia New Construction Bumi Armada Keppel Shipyard
Main Deck Singapore

Offshore wind

2019 CGN Pingtan Dalian Land China New Construction CGN Fujian Fujian Yifan New
20 x 5MW Offshore Wind Energy Equipment
CGNPC Zhejiang Daishan China New Construction CGNPC ZPMC
Offshore Booster Station
Guohua Jiangsu China New Construction Jiangsu Guohua New Nantong Taisheng
Zhugengsha H1 50 x Energy Landao Ocean
4MW Offshore Wind Engineering
Huaneng Guanyun/ China New Construction Huaneng Corp/Luneng CPOE
Luneng Rudong Offshore Corp
Booster Station
Jiangsu Rudong H14 China New Construction Jiangsu Rudong
Huangsha Ocean 50 x
4MW Offshore Wind Jetty
Piles
Shuangchuang China New Construction Dongtai Shuangchuang Jiangsu Hantong
Zhugengsha 150 x 2.5MW New Energy Ship Building
Offshore Wind
SK 408 Larak and Bakong Malaysia New Construction Consortium of Sapura, Sapura Fabrication
Wellhead Platform and Petronas Carigali and
Jacket Shell

70 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Asset
Year Project Name Project Type Owner Builder
Country

Offshore wind

2019 The Three Gorges Dalian China New Construction The Three Gorges Group Penglai Dajin
Zhuanghe Offshore Wind
Power — Foundation Piles
(28 pcs)
2018 Datang Binhai Foundation China New Construction Datang Guoxin Binhai Datang Power
Piles 95 x 3.3MW + 50 Offshore Wind Power
x 3MW Offshore Wind
Power — Foundation Piles
Guodian Zhoushan China New Construction Zhoushan Guodian Corp Zhongilao Three
Offshore Wind — Steel Aviation Bureau
Pipe Pile (8 pcs) Ningbo
Jiusi Rudong 300MW China New Construction Jiusi Rudong Offshore Rudong Haili Wind
Offshore Wind Power Wind Power
Foundation Piles (75 sets)
Longyuan Dafeng H7 80 China New Construction Jiangsu Longyuan Dafeng Shanghai Electricity
x 2.5MW Offshore Wind New Energy
Power — Booster Station
Shenhua Guohua Dongtai China New Construction Guahua Jingsu Wind Landao Marine
75 x 4MW Offshore Wind Engineering
Power
2017 TangShan LaoTing China New Construction HeBei Construction & Tian Jing Gang
300MW Offshore Wind Investment Group Heng
(15 Units)
Tangshan Laoting Bodhi China New Construction China Guodian Sinopec Petroleum
Island Offshore Booster Corporation Engineering and
Platform Project Construction
Shengli Corporation
2016 Rampion Substation New Construction E. ON HSM Offshore
Jacket
2015 Panama Windmill 77 x Panama New Construction Panama Inter Energy Goldwind
2.5MW Offshore Wind
Sandbank Substation North Sea New Construction Vattenfall Bladt Industries
Jacket

Petrochem

2017 Zhanjiang Zhongke China New Construction Sinopec Kuwait CCCC Fouth
Refiniery Project — Jetty Petrochemical Engineering

Infrastructure

2019 BFI Urea Export Jetty Malaysia New Construction Brunei Port Petro Pipe Sabah
2017 Anhui City Riverway China New Construction Minstry of Water Jiangsu Shunli Pipe
Improvement Spiro Tubes Resources Zhejiang
Project Branch
Yushan Bridge Anti- China New Construction Zhoushan Port Bureau Shanghai Zhenhua
Collision System Project Port Machinery
Company

71 PPG Track Record — PPG SIGMACOVER 850


PPG Track Record
PPG SIGMACOVER™ 850

Asset
Year Project Name Project Type Owner Builder
Country

Infrastructure

2017 Zhejiang City Riverway China New Construction Minstry of Water Jiangsu Shunli
Steel Sheet Pile Project Resources Zhejiang Cold-Formed Steel
Branch Industry
Zhengzhou Bishui China New Construction Zhengzhou Bishui Zhengzhou Bishui
Environmental Environmental Protection Environmental
Technology City Buried Technology Protection
Water Pipe Project Technology
2016 Padma Multipurpose Bangladesh New Construction Bangladesh Bridge China Railway
Bridge Authority Shanhaiguan Bridge
Group Co., Ltd.
2015 Palm Oil Industrial Cluster Malaysia New Construction Palm Oil Industrial Cluster Petro-Pipe Sabah
(POIC) — Jetty Pile (POIC) (PPS)

72 PPG Track Record — PPG SIGMACOVER 850


Visit ppgpmc.com or contact:
Asia Pacific +86-21-6025-2688 ppgpmc.ap@ppg.com
Europe, Middle East and Africa +32-3-3606-311 customers@ppg.com
Latin America +57-1-8764242 ext. 201 ppgpmcandean-ca@ppg.com
North America (US & Canada) +1-888-9PPGPMC PMCMarketing@ppg.com

No rights can be derived from the content of this publication. Unless otherwise agreed upon in writing, all products and technical advice are subject to our terms of sale, available on our
website ppgpmc.com. All rights reserved. The PPG logo, We protect and beautify the world, and all other PPG marks are property of the PPG group of companies. All other third-party marks
are property of their respective owners. Created May 2020. © 2020 PPG Industries, all rights reserved.

You might also like