3) BASE 1 bolsa

EI ts f ts x f Tipo
A 15 1/450 0.03 TE
B 5 .1/50 0.1 TI 61%
C 0.3 1 0.3 CM
D 1 .1/30 0.03 TI
E 5 1/150 0.03 TI
F 2 1/200 0.01 TI

a)
como Ti < CM TC dpt=Tstarea=TE+CM= 0.33 min/bolsa

6.5 horas 2 turnos 6 días 8


turno-opo día sem

1 bolsa 1 kg 1 tonelada 390


0.33 min-Opo 1 bolsa 1000 kg

c) 18.91 t/dia

4)
EI ts f ts x f Tipo Volumen
A 5 2 10 TI 70
B 2.381 21 50.00 TI 15.00
C 1 5 5 TE 5
D 1 7 10 TE
E 60 1 60 CM
F 5 1 5 TI
G 5 1 5 Ti
H 15 1 15 TE

a)
TI= 70.00 Como TI>CM TC dpt=Tstarea=TE+TI= 100.00
TE= 30
CM= 60
1 lote 98 L 500 min 2
100 min-opo 1 lote dia

c)
p= 0.60 lotes/H-H
b)
opo 61% = 378.18 H-H/sem

min 2 turno 8 opo


turno dia

b)
opo 980 L/día