Professional Documents
Culture Documents
Habshan - Fujairah
RASHMI ANAND
A 27-7-2015 ANAND KUMAR ISSUED FOR APPROVAL
SHARMA KUMAR
0 18-JAN-17 RASHMI S ANAND K ANAND K ISSUED FOR CONSTRUCTION
© Copyright China Petroleum Engineering &Construction (Group) Corporation 2008 All rights reserved.
“This document is issued for the execution of Abu Dhabi Crude Oil Pipeline (ADCOP) project.
Copying this report without the permission of CPECC, ILF and IPIC is not permitted.
ACCUMULATOR N2 N2 N2 N2
M1
Hydraulic fluid LG
TIT
Reservoir
100 LTR
NOTE:5
LIT
P1 10
Drain NOTE- 6
RV1