You are on page 1of 4

ADCOP - ABU DHABI CRUDE OIL PIPELINE PROJECT

Habshan - Fujairah

PIPING AND INSTRUMENTATION DIAGRAM FOR


HPU
P195-30-99-

EPC CONTRACTOR: PROJECT MANAGEMENT CONSULTANT: VENDOR / SUBCONTRACTOR:

China Petroleum Engineering ILF Consulting Engineers


& Construction Corporation P.O.Box 73250
Abu Dhabi Branch CONSULTING
Abu Dhabi, UAE
P.O. Box 127345 EN GI N EERS

PROJECT: ADCOP - ABU DHABI CRUDE OIL PIPELINE PROJECT


Habshan - Fujairah
EPC Contractor Doc. No.: ADCOP/C013/08 PAGE: 1 of 5
DOCUMENT No.: 3 Rev.  Project No: E30153 DATE: 
REVISION RECORD

REV DATE ORIGINATOR REVIEWED APPROVED DESCRIPTION

RASHMI ANAND
A 27-7-2015 ANAND KUMAR ISSUED FOR APPROVAL
SHARMA KUMAR
0 18-JAN-17 RASHMI S ANAND K ANAND K ISSUED FOR CONSTRUCTION

© Copyright China Petroleum Engineering &Construction (Group) Corporation 2008 All rights reserved.
“This document is issued for the execution of Abu Dhabi Crude Oil Pipeline (ADCOP) project.
Copying this report without the permission of CPECC, ILF and IPIC is not permitted.

DOCUMENT TITLE : PIPING & INSTRUMENTATION DIAGRAM FOR


Project No: E30153
HPU
PROJECT: ABU DHABI CRUDE OIL PIPELINE PROJECT
Page 2 of 4
Habshan - Fujairah
DOCUMENT No.: P195-30-99-50-0812 Rev. 0 DATE : 18-01-2017
HABSHAN FUJAIRAH OIL PIPELINE PROJECT
HYDRAULIC DESIGN CALCULATIONS
P.O.: 71407784

Piping & Instrumentation Diagram for HPU

PROSERV Document No.: PED PJ-05-000346-IN-100 PID

PROSERV PROJECT No.: PJ-05-000346

00 27-Nov-2014 Issued for Review/Comments VH IS ISK


Approval
Rev Date Reason For Issue Prep. Chkd. Apprd.
Status
400-415 V A.C 50HZ BY LCP (JB-01)
J.B (J.B-02) NOTE- 2
3 PHASE SUPPLY OTHERS
NOTE- 4

ACCUMULATOR N2 N2 N2 N2

ACC ACC ACC ACC

M1

Hydraulic fluid LG
TIT
Reservoir
100 LTR

NOTE:5
LIT

P1 10

Drain NOTE- 6

RV1