You are on page 1of 8
J BEC Instructor Training Course on Bridge Inspection at Bandung, Indonesia Recording of Inspection Results March 26, 2018 (General incorporated foundation) Japan Bridge Engineering Center Harazaki, Ikuo Recording of Inspection Results & Findings Recording Bondtion j Evaluation 5 Evaluation and Inspection | Identitying Defects 1 Maintenance Plan} |) Result and findings i fing as bridge inventory Recording |Accumulatior Programed Rehabilitation Strengthening Remedial Actions 1) Data recording on standard inspection form 2) Renewal of bridge inventory (bridge history file) > Serious defect of the primary element may require urgent remedial measures to secure the safety of public traffic and so avoid the progress of deficiency. > Critical findings shall be reported to the Chief Inspector as soon as possible. [Recording Forms] - Bridge Inventory - Periodic Inspection: Concrete Bridges Steel Bridges Box Culverts Bridge Inventory Record ~J-BEC General Information The basic design data, history of inspection and remedial actions. er Visual information including location map and panoramic view of bridge and the specific feature of the bridge. Dimensions of Structure Dimensions and structure type of superstructure, substructure, bearing, deck material and expansion joint are recorded in this form. General Drawings The plans or as built drawings, if available shall be scanned into | “owlcat record history this form. If such drawings do not exist, it should be sketched with the dimensions of the bridge Photographs of Bridge the typical feature of the bridge Photographs do not necessarily need to be updated when the inspection is carried out. However, when the major repair works or rehabilitation works are carried out, the photos on this form shall be renewed. Bridge Inspection Report JBEC > Record the inspection findings, wi L provide a narrative description of conditions at the bridge site. > The reporting of the defects and deterioration is ——__ according to their severity and extent. > In filling in the data sheet, as an accurate and consistent record of defects found is essential. > Serious defect of the primary elements may require urgent remedial measures to secure the safety of public traffic and so avoid the progress of deficiency. > Critical findings shall be reported to the Chief Inspector as soon as possible. J-BEC Photography 1) Overall Photograph beginning of the bridge : Left side end of the bridge ‘ight side J-BEC 3) Location of Defected Components {G& Must be taken for the worst condition for each span of bridges MCG M URL toldentify defected parts, Wide angle Photo is preferred to identify the location of the member. RPE NT IC 4) Show recognizable items to visualize scale of the detail \G& Must show measurement if possible Photographs and sketches ~J-BEC * Mandatory inventory photographs Elevation of structure (both sides) General view of carriageway over deck (both directions) View from approach road, with the bridge number or other identification written on a blackboard * Deficient components and major defects Must be taken for the worst condition for each span of bridges Must include any information in terms of defects Must show measurement if possible by placing ribbon rod/measuring tape beside damage points * Undefined Components. J BEC Numbering System of Components Numbering of Substructures upstream downstream Abutment 01 Piero1 Abutment 02 Numbering of Components Main Girder (Mg) Cross Beam (Cr) Piers(P), Abutment(A) Girderot ee | Devers TT} Example Inspection Report Form (1) General Information J-BEC ee a Nea nmeRaamen | sememnen | Tem ee — =a — Sea a aa a exec Ee aa finesowas Example Inspection Report Form (2) General Drawings _J-BEC _—__ Inspection Report Form (2) General Or cod fares == [emiwounow Example Inspection Report Form (3) Figure of Bridge Numbering. J- BEC Inspection Report Form @) Figure of ridge Numbering [bxrctmmcem [earner |nsaenare [nies (ced [emonoouon foro oar [eee [ease Omen Figure of Bridge Numbering [pan abe Main Girders (Mg) Deck Slab (Ds) Invisible Element Fes Example Inspection Report Form (4) Rating of Element Defects pecion Raper For #) Raa one sie Evoueen — = sana ay SaaramaL cowee ianeer ae Sea ree [imam] Peete |Piemel fea ta | ene rence ere oe | tor fran 7 [a om ar [eso] [ae a n patina |e, [ on fo 5 a omer oe | et pe : a a [Re paces = Le = a a z B Example Inspection Report Form (5) Defect Photograph J BEC tnpecion Report Form (8) Deke Protgranh cance | eae a Se a ara ae Eas ees ome [Prose no = = Fpesteorefasy — I pos fees ans ee ae : = fearg Te tng = 14 Example Inspection Report Form (6) Defect Figure Inspection Repor Form (@) Detect gure [eramman | earner apie nicomea fears [esenroounoas weroner lees [ness one (Span Nan Describe defective component and extent EXAMPLE Main Girder, Cross Beam, Deck Slab es Ss =e “— | e 7 J-BEC Ingpeeton Report Form (6) Detect Figure Ses aa [sean fa [erwoured os lear feces one Describe defective component and extent EXAMPLE Vertical Wall(Ac) Parapet Wall (Ap) Wing Wall (Aw) Bearing Bed Mortar (Bm) Parapet Ae 0101 aw. paling (0.50.8) Iiipemee/; it wes ed mortar Bm 101 DeformatonBreak < photo-t \ Vertical Wall Ac — Cracking - (0.2mm/2.0m) Vera vo ag 181 ak (02mm pater 3) Vertical Wall Ac 0101 Water LeakagePudde-d nm same [Sam | crack | << | emcecenes CD spating |_| Leakage | QD ste" [CODD | otiere | ftever

You might also like