No.: TASB‐TRR Form‐ R4
Tenant’s Repair Request Form Page No.: 1
TRR‐____________
TULC-TRR-102 Date:
To TEG Assets Sdn Bhd
From Inst. / Facility TUFM Issued by (Name) Kerlvin
PART A – DEFECT DESCRIPTION
Provide a brief description of the defect. Include layout plan to show the location(s) of the defect and photographs of
the defect
A.1 Type of works: Civil & Structure M & E Others
Provide description (Use separate sheet if need):
2 High severity: defects interrupting normal operations
Severity 3 Repairs required urgently; normal operations not affected
(select
one) Repairs required during next academic term/semester break (specify when)
4
5 Repairs required during next financial year (notify by 30 June of current year for budgeting)
Estimated Repair Cost ≤RM20,000? Yes No
Attachments (Please list): Plans Photographs
PART B – DOCUMENTS REQUIRED (Please tick ( ) relevant boxes below)
B.1 FOR FAST TRACK REPAIRS ONLY (Condition: Estimated Repair Cost ≤RM20,000 and High Severity)
Tenant’s Repair Request Form (this Form)
Method Statement
Quotations for repairs (refer to CPD’s Procurement Manual)
Other documents (please list, if any):
B.2 FOR STANDARD REPAIRS
Tenant’s Repair Request Form (this Form)
Other documents (please list, if any): Observation
TRR‐____________ Date:
PART C – JOINT INSPECTION BEFORE ANY REPAIRS
(To complete and sign the form after joint inspection)
C.1 RESPONSIBILITY FOR REPAIR OF DEFECT
Tenant Responsibility – Tenant to rectify, no further action by Landlord
Insured Risk
Landlord’s responsibility
C.2 TYPE OF REPAIR PROCESS (Select one below)
Fast Track Repair (Condition: Estimated Repair Cost ≤RM20,000 and High Severity)
Standard Repair
C.3 PROPOSED TIMING OF REPAIR (Select one below)
Urgent – proceed to repair without delay
Proceed to repair when the site is made available by the Tenant (insert approx. date) ____________
To reschedule to a mutually agreed time frame (for items that do not affect daily operations only)
(Kindly indicate an approximate period) ____________ to ____________
C.4 AGREED PROPOSED REPAIR METHOD (provide a brief description below)
Interim / Short Term Repair Permanent Repair
C.5 Declaration
The Tenant’s representative and the Landlord’s representative hereby jointly agreed that the Tenant / Landlord
(please delete whichever is not applicable) shall be responsible for the defect(s) reported. The method of repair has
been discussed and accepted.
Tenant’s representative Landlord’s representative
Name: Name:
Signature: Signature:
Date:
Date:
TEG Assets Use Only
TRR‐____________ Date:
PART D – DEFERMENT OF REPAIR WORK (IF NOT WITHIN BUDGET)
(To be completed by TEG Assets and sent to Tenant)
The timing of repair for this TRR shall be deferred to: ____________________________________________________
Declaration
The Tenant’s representative and the Landlord’s representative hereby jointly agreed that the TRR repair work is deferred
to the agreed date mentioned above.
Tenant’s representative Landlord’s representative
Name: Name:
Signature: Signature:
Date: Date:
PART E – CONFIRMATION OF APPOINTMENT OF CONTRACTOR TO CARRY OUT REPAIRS
(To be completed by TEG Assets and sent to Tenant)
This is to confirm that the contractor named below has been appointed to carry out the repair works for the defect(s) as
reported by you via the above Tenant’s Repair Request
Contractor: Contact Person / Mobile No.:
Tenant’s representative Landlord’s representative
Name: Name:
Signature: Signature:
Date: Date:
Details of Work Awarded (Enclosed)
Method Statement
Timeline
Contractor Org Chart
Job Hazard Identification
Kick Off Meeting Date:
Date of Work Commencement:
TRR‐____________ Date:
PART F1 – JOINT INSPECTION AFTER THE REPAIRS ARE COMPLETED
This is to confirm that the contractor that was appointed by TEG Assets has completed the repair works reported via the
above Tenant’s Repair Request and hereby request for a joint inspection to certify the completion of the repairs.
F1.1 Person(s) present at the joint inspection (please insert names):
Tenant’s representative:
Landlord’s representative:
Contractor’s representative:
Others (if any):
F1.2.1 If “No”, list the items to be rectified by the Contractor prior to re‐inspection
(Use separate sheet if needed):
F1.3 Please tick appropriately
Interim Repair Permanent Repair
E1.4 Other Comments:
F1.5 Defects Liability / Warranty expiry date
(Insert date or mark “Not Applicable”)
Tenant’s representative Landlord’s representative
Name: Name:
Signature: Signature:
Date: Date:
TRR‐____________ Date:
PART F2 – RE‐INSPECTION of REPAIRS (only if works are not completed satisfactorily)
This is to confirm that the contractor has satisfactorily completed the rectification works listed in Part F1
and hereby request for a joint final inspection with you.
Proposed Date of Re‐inspection: Tenant’s Contact Person/Mobile No.:
Person(s) present at re‐inspection (please insert names):
Tenant’s representative
Landlord’s representative
Contractor’s representative
Others (if any)
Rectification works completed satisfactorily? Yes
No
The representatives of the Tenant and the Landlord have jointly inspected the repairs carried out and
hereby agreed that the repair to the reported defect(s) have been satisfactorily completed.
Defects Liability / Warranty expiry date
(Please insert the Date or mark as “Not
Applicable”)
Tenant’s representative Landlord’s representative
Name: Name:
Signature/date: Signature/date: