RENCANA ANGGARAN BIAYA PEMELIHARAAN ELEVATOR TAHUN 2023

RS ORTOPEDI PROF.DR.R.SOEHARSO SURAKARTA

No URAIAN VOL SAT HARGA

1 Bed Lift 6 Floor (Gd. Yandu) 2 Lot 850,000

2 Passanger Lift S Floor (Gd. Yandu) 2 Lot 800,000

3 Dumbwaiter S Floor (Gd. Yandu) 1 Lot 650,000

4 Dumbwaiter 2 Floor (Gd IBS) 2 Lot 550,000

5 Bed Lift 2 Floor (Gd IBS) 2 Lot 750,000

6 Passanger Lift 3 Floor (Gd Perkantoran) 1 Lot 750,000

7 Bed Lift 2 Floor (Gd Rawat Inap) 1 Lot 750,000

8 Bed Lift 3 Floor (Gd IGD) 2 Lot 750,000

9 Escalator (Gd. Yandu/ 2 Lot 750,000

SUB TOTAL
x 12 (setahun)
PPN 11%
TOTAL
OR TAHUN 2023
ARTA

JUMLAH HARGA

1,700,000

1,600,000

650,000

1,100,000

1,500,000

750,000

750,000

1,500,000

1,500,000

11,050,000
132,600,000
14,586,000
147,186,000