BOYS’ HOSTEL
S/N MATERIALS QUANTIT UNIT PRICE PRICE (N)
Y (N)
PUMP WASTE 1 2,000 2,000
SHOWER HEAD 1 2,500 2,500
WATER HEATER (30 LTR) (HOUSE PRNT’S ROOM) 1 33,000 33,000
TOTAL 37,500
GIRLS’ HOSTEL
S/N MATERIALS QUANTIT UNIT PRICE PRICE (N)
Y (N)
1. 11/2 BLACK NUTE 1 2,000 2,000
2. 14/3 NIPPLE 6 600 600
3. 14/3 REDUCER 2 1,000 2,000
4. 11/4 X 1” REDUCER 2 1,500 3,000
5. BATH MIXER 2 8,000 16,000
TOTAL 23,600
CAFETERIA
S/N MATERIALS QUANTIT UNIT PRICE PRICE (N)
Y (N)
1. BASIN TAP 4 2,500 2,500
2. WASHING TANKS 30,000 30,000
3. CHLORINE 5,000 5,000
4. EVACUATION OF SOAKAWAY 10 TRIPS 15,000 150,000
TOTAL 187,500
SCHOOL BLOCK
S/N MATERIALS QUANTIT UNIT PRICE PRICE (N)
Y (N)
1. ANGLE VALVE 7 1,200 8,400
2. W.C. NUBS 2 3,000 6,000
3. FLEXIBLE CONNECTOR 10 350 3,500
4. CABINET BASIN 1 9,000 9,000
5. FLOW MASTER 2 3,000 6,000
6. ADJUSTABLE WASTE 4 600 600
7. LAB TAP 3 7,000 21,000
8. ADJUSTABLE WASTE 4 600 2,400
9. ANGLE VALVE 4 1,200 4,800
TOTAL 61,700
EARLY YEARS
S/N MATERIALS QUANTIT UNIT PRICE PRICE (N)
Y (N)
1. W.C (POPOOLA) 1 25,000 25,000
2. BASIN TAP 1 2,500 2,500
3. SILICON GUM 4 1,200 4,800
4. FLEXIBLES 10 350 3,500
TOTAL 35,800
MASONROY
1. DOOR FRAME REFIXING (EARLY YEARS)
2. CHINA DOOR REFIXING (EARLY YEARS)
3. CASTINGOF SAOKAWAY SIDES
4. MINOR PLASTERINGS
MATERIALS