MATERIALS REQUIRED FOR INSTALLATION

MATERIALS QUANTITY PRICE/ PIECE TOTAL PRICE

FRW FRW

1.LAMPS 10 1000 10,000

2.LAMP HOLDERS 10 500 5,000

3.SOCKET OUTLETS 4 1000 4,000

3.2 GANG SWITCH 2 1000 2,000

4.SIMPLE SWITCH 5 1000 5000

5.TWO WAY SWITCH 2 1000 2,000

6.WALL BOX 13 200 2,600

7.JUNCTION BOX 4 350 1400

8.MCB 2 2000 4,000

9.PIPES 50 400 20,000

10.GROUND(AMAKARA,UMUNYU LOD) 1 2,000

11.NAILS 3kg 2200 6,600

12.INSURATORS 3 500 1500

13.WIRE CLIPS 2box 3000 6,000

14.KUDE 2o 150 3,000

15.MASHO 20 150 3,000

16WIRES 5 350000 175,000

TOTAL PRICE 250,100 frw