1 trip of sharp sand 12,500 1050pes of blocks 120 126,000 18 bags of cements (for Screeding /tailing & blocks work) 3500/3450 62,250 Total water (for blacks/tailing & Screeding 3,500 Total block work labour 48,200 Fence excavation 8,000 2 length of y 7 for slabs 3,400 8,500 Labour for carpenter/iron & slab casting 6,000 N337,950 Sister Juliet Work Summary Tailing Work
23 Square meters of wall tails 1,700 39,100
2 Parks of tails gum 700 1,400 Tailor’s Labour 11,700 N52,200 Plumbing
Total plumbing materials with the additional 335,680
Transport (for plumbing & tiles 8,000 Plumbers labour (fittings & surrounding 45,000 N388,680 N388,680 Screeding
4 drums if 20 liters of Screeding paint 3,100 12,400
1 small drum of 4 liters of Screeding paint 1,000 11 kg of acrylic gum 1,300 14,300 86.6 labour per meter (86.6m) 300 26,000 N53,700 Electrical fittings
Total materials (wires & fittings) 155,200
Electrical Labour 25,000 N180,200 Other Expenditures
2 key cylinders 800 1,600
2 Labors for cleaning of compound (different occasions) 3,500 I gave aluminum man the sum of 7000 1 New key for the kitchen 3,000 Cleaning of soak away & covering 2,000 ½ bag of cement (for chamber & soak way covering) 1,800 N18,900