2 wash room water tanks. 534,000 3 Electric work Labour 240,000 143,500 4 Nabeel + Asif salery till May R 550,000 5 Electricity Meter Wapda plus Water Bills 110,000 6 Ceiling contracts Farooq 1,720,000 7 Floor tiles + bath tiles (Servent) / Marbel + tiles + civil works 133,755 8 Marble + Tiles+ Civil Workers Labour Latif 1,050,000 64,400 9 Electric Wapda Bills 38,348 10 Electricity DBS Hassan 986,000 11A Doors By Imtiaz SAB (ADV) 2,000,000 11B One Door Sample by Alvi 110,000 12 Servent wc + wash basin 39,000 13 wash room serment tab Set 60,000 54,000 14 Mud digging from Lawn Area 15,000 15 Cement white + Grey + bong 707,835 16 Javed Alui fee. 3,635,000 17 Windows Upvc advance 3,800,000 30,000 18 Paint Contractas RashidADV 1,000,000 100,000 19 Jameel for Garden 676,150 20 Main Gate 260,000 21 Main Cable Wapda DB2 Matter 343,280 22 Fire Fighting + Electric Fense+ Camera 741,700 23 Grinding Marble Floor COTRACTOR 35,000 24 Cupboard 431,987 220,000 25 New Manhole Covers 71,000 26 Wazzo Area seat 130,000 27 Tiles Purchase(City Tiles) 200m 512,000 28 Decorative Tiles Powder Room 46,000 29 Marble For Servent Stails 36,000 30 Copper Piping + Cable for AC 345,750 31 CAT6 Cable 133,500 32 Labour Repairs of Exytra Electric Point 27,000 33 WPC Servent Doors ADV 288,000 34 WPC Pool Deck Advance 750,000 35 Tiles From City Tiles 40M+20M 175,000 36 Water Stainer 89,600 37 Asghar Sunkin Area M.S Railing 163,000 30,000 38 Tiles Magoon 84,900 39 Corian Atif 760,000 40 PVC Pipes Main Cable 12,500 41 Glass Tiles for Sun Light 214,000 42 Hand Shower For 5 Baths 62,500 43 Asghar For Main Railing 425,000 50,000 44 Locks 14 NDS J.B Saeed 217,420 45 MUTFARIQ KHARCHA 195,764 57,000
23/6/23 Pool Tile Advance 100,000
23/6/23 Cement 10 Bags Bond 50 Bags 39,900 23/6/23 Water Pump No 7 350,000 23/6/23 Shower Cabin + Sky Light Advance 200,000 Tapeing for 44 Sheets + Cutting Bill 45,000 Old Manhole Cover(missed in previous bill) 102,000 Servent QTR Locks +Tower Bolts 29,200 MISL Bills (Mutafarqa Kharcha) 59,877 Arif+ Nabeel Sallary June 23 75,000 Plastetr of Paris Layon Tiles 35,000 Exhaust Fans 12 NO 87,200 Total 25,961,989 1,872,077 25,961,989 1,872,077 0 0 TOTAL Balance Amount 2,006,000 Labour Charges 450000 1,556,000 Material Cost 534,000 Pending 383,500 100,000 550,000 110,000 NO BILL 1,720,000 Bill is Pendin for Finaloization 133,755 PENDING BILL 1,114,400 200,000 38,348 986,000 NO BILL 2,000,000 2,378,000 110,000 NO BILL 39,000 114,000 15,000 No bill 707,835 Pending 3,635,000 3,830,000 659,790 4,459,790 1,100,000 900,000 Pending 676,150 NO BILL 260,000 140,000 No Bill(IN PROCESS) 343,280 FINAL NO BILL 741,700 35,000 85,000 No Bill(IN PROCESS) 651,987 1,600,000 Pending 71,000 NO BILL 130,000 Bill Pending 512,000 OK 46,000 36,000 345,750 133,500 27,000 288,000 30,000 750,000 370,320 175,000 89,600 193,000 50,000 PENDING 84,900 760,000 PENDING 12,500 No Bill 214,000 62,500 NO BILL 475,000 200,000 PENDING 217,420 252,764 0 100,000 No Bill 39,900 OK 350,000 Pending Bill 200,000 Pending Bill 45,000 OK 102,000 OK 29,200 OK 59,877 Pending 75,000 OK 35,000 NO BILL 87,200 Pending 27,834,066 6,713,110 4,459,790 Bill Amount 4378000 22/3/23 Bill Amount 60000 31/5/23 BILL Amount 661773 6/5/2023 Bill Amount 38348 Bill Amount 59100 30/5/2023 115283 3/5/2023 174383 BILL Amount 1192600 22/5/23 Bill Amount 302,565.00 22/5/23 Bill Amount 742500 29/3/23 Amount Paid 87000 11/2/2023 46500 11/4/2023 Total 133500 BILL Amount 4489790 1/3/2023 Amount Paid 217420 31-May 57000 23-May TOTAL 274420 BILL Amount 39000 16/01/23 Bill Amount 896000 9/5/2023 Bill Amount 345750 1/2/2023 Bill Amount 35946 15/2/23 Bill Amount 27000 7/2/2023 BILL 1908985